My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Orono_Route_Permit_Application - Docket # W002/TL-11-223
Orono
>
Property Files
>
Street Address
>
6
>
6th Avenue North
>
3960 6th Avenue North - 29-118-23-33-0009
>
Land Use
>
3960 CR 6 Excel substation
>
Xcel 2011 - File Cabinet 1
>
Orono_Route_Permit_Application - Docket # W002/TL-11-223
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:47 PM
Creation date
9/27/2021 10:59:10 AM
Metadata
Fields
Template:
x Address Old
House Number
3960
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3960 6th Avenue North
Document Type
Land Use
PIN
2911823330009
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
317
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, December 13, 2010 <br />7:00 o'clock p.m. <br />(12. #10-3486 XCEL ENERGY, 3960 SIXTHA VENUE NORTH, Continued) <br />Rogers stated they need to get from Point A, which is the substation, to Point B, which is the 115 kV line. <br />Roger indicated they are willing to meet with Mr. Schoon and Mr. Kuruvilla again to discuss alternative <br />routes. One of the options considered was to take it through Baker Park. Xcel did meet with Three <br />Rivers Park in early November and Three Rivers Park has issued a two page letter outlining their criteria. <br />That letter has been provided to Mr. Schoon and Mr Kuruvilla. The other alternative is to run it between <br />Highway 12 and the railroad tracks, but that is not ideal since there is a force main located in that area as <br />well as other utilities. <br />Rogers stated if the proposed route is followed, it would not be in the wetlands on Mr. Schoon's or Mr. <br />Kumvilla's property but would be closer to the railroad. <br />Murphy asked how much taller the new poles are. <br />Cox indicated the existing structures are between 60-70 feet and the new poles would be approximately <br />15 feet higher. The tallest structure would be the corner structure because they are transitioning from the <br />A -frame structure into a vertical design. <br />Bremer asked why Xcel made application to the City rather than to the PUC. <br />Sedarski indicated one factor is the small size of the project and the other factor is to go to the City in the <br />hopes that there will be local support for the project. The proposed route will impact relatively few <br />property owners. Sedarski noted Xcel also has other projects scheduled around the same time. <br />Bremer asked what is incomplete about the application. <br />Sedarski indicated part of the process is to introduce the project to the public and to obtain public <br />comment on the environmental assessment and the route alternatives. The PUC would not require Xcel to <br />look at alternative routes. Xcel, however, does review that at as a matter of course. Sedarski noted Xcel <br />is not done with the environmental assessment. <br />Rogers indicated plans for the substation expansion and transmission lines have not yet been finalized and <br />submitted. <br />Sedarski pointed out they did send letters to the affected landowners and they are in the process of <br />collecting comments. Xcel has completed a wetlands delineation and that has been approved by the <br />Watershed District. <br />Murphy asked what the general time line is for the project. <br />Cox stated the time line will be based on the permitting process they end up following. Cox stated this is <br />a local project and the substation is a distribution substation, which would feed both commercial and <br />residential properties. Cox stated permitting would typically be a six to eight month long process and <br />construction would start sometime in 2012 depending on when the permitting process is complete. <br />Sedarski noted the six to eight month process would be if they go before the PUC. <br />McMillan asked what area would be upgraded as part of this project. <br />Page 17 of 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.