Laserfiche WebLink
' the Permit Application for Wireline Crossing or Longitudinal to place the new structures at least five <br /> feet from the existing BNSF railroad right-of way. <br /> ' 8.4 Required Permits and Approvals <br /> The following Table 15 identifies federal, state, and local permits and approvals that could <br /> ' potentially be required for the Project. <br /> Table 15 <br /> Potential Required Permits <br /> ' <br /> Jurisdiction and <br /> Permit!! Requirement <br /> _ _ . �.. . ... ._ <br /> USAGE, Clean Water Required if dredging and filling activities will occur within jurisdictional <br /> Act, Section 404 wetlands. If the proposed activities are not eligible for coverage' under the Permit General Permit or Letter of Permission, an Individual Permit will be <br /> ( obtained from the USAGE. <br /> ....+�,v...,»... ,... .(,. ..a..sr r..`. <br /> Commission, Route Required for any transmission line of 100 kV or greater and greater than <br /> Permit 1,500 feet in length. <br /> ' MnDNR, License to Required if any work is necessary in public waters. <br /> Cross Public Lands <br /> and Waters <br /> ' MnDOT, Utility Required to place utilities on Minnesota trunk highway right-of-way. <br /> Permit <br /> MPCA, NPDES/SDS Required under the NPDES/SDS General Stormwater Permit for <br /> ' General Stormwater Construction Activity where construction activities will cause more than <br /> Permit for one acre of ground disturbance. <br /> ' Construction Activity <br /> MPCA, Section 401 Required if the USAGE requires an individual permit for wetland dredging <br /> Water Quality and filling activities. <br /> Certification <br /> 1 <br /> ' Orono Project June 7, 2011 <br /> MPUC Docket No. E002/TL-11-223 69 <br />