Laserfiche WebLink
Jurisdiction and , <br /> Permit Requirement <br /> Culvert Required if extending/connecting culverts. (Sometimes also referred to as <br /> Extension/Connectio an Entrance Permit.) <br /> n , <br /> Driveway Permit Required for any changes proposed to driveway access or driveway <br /> widening along county highways, including field driveways, residential <br /> driveways, commercial driveways and public street access. (Sometimes <br /> also referred to as an Access Permit.) <br /> Moving Permit Required whenever legal dimensions and/or axle weights are exceeded per <br /> (Hauling) county regulations. <br /> Oversize/Overweight' Required on all county highways. May be required to move over-width <br /> Vehicle Permit loads on county,township,or city roads. <br /> Utility Permit Required for work proposed in the county highway rights-of-way. Work <br /> requiring this permit includes installation and repair of telephone cables, <br /> power lines, gas lines, storm sewers, sanitary sewers, water mains, ditch <br /> grading,culvert installation,etc. <br /> Wetland Permit Required for activities in wetlands,if needed. <br /> Working in the Right- Requited if constructing on, across, or under the right-of-way of a county <br /> of-Way Permit highway. <br /> For the other permits listed in Table 15 above, and any additional permit requirements identified <br /> during subsequent agency consultations, Xcel Energy will acquire the necessary authorizations and <br /> develop the appropriate plans associated with any permit or authorization (e.g.,stormwater pollution <br /> prevention management plan prior to construction. ' <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> Orono Project June 7,2011 , <br /> MPUC Docket No. E002/TL-11-223 70 <br />