species, land use maps) and applicable guidelines, rules, and regulations, a summary of which is ' <br /> provided in Section 8.1 above. Xcel Energy will continue to communicate with these agencies <br /> throughout the permitting process. <br /> As discussed in Section 4.2.2, Xcel Energy initially sought local review of the Project from the City <br /> of Orono. On August 20, 2010, Xcel Energy applied for a CUP from the City pursuant to Minn. <br /> Stat. 216E.05, subd. 1(a),and MN Rule 7850.5300 subp. 1. On December 13,2010,the Orono City <br /> Council voted to refer review and permitting of the routing and siting of the Project to the <br /> Commission pursuant to Minn. Stat. 216E.05,subd. 1(b),and MN Rule 7850.5300 subp. 4. <br /> The following summarizes the several meetings Xcel Energy has participated in during the route <br /> development and initial permitting processes. <br /> • City of Orono Planning Commission meeting on September 20,2010; I <br /> • Meeting with Three Rivers Park District on November 1,2010; <br /> • City of Orono City Council meeting on December 13,2010; <br /> • Meetings with surrounding landowners on various dates;and ' <br /> • Meeting with BNSF on March 17,2011. <br /> Comments from the public are included in Appendix D.2. In general, public comments have been <br /> related to the following; a concern that the proposed Project will decrease property values of homes <br /> within the HFA, EMF risks, environmental issues and mosquito control. Additionally, many of the <br /> HFA home owners commented to the City of Orono on their preference that the City maintain <br /> local review of the project and not refer it back to the Commission. <br /> Xcel Energy has been working with the City, various agencies, and landowners to establish an ' <br /> acceptable route that results in the least impacts practicable on current infrastructure,residences,and <br /> future development. <br /> On several occasions last winter and spring of 2011 Xcel Energy met or corresponded with the two <br /> landowners who own residences where existing Line 0831 crosses their respective properties. The <br /> parties discussed options for routing the new proposed 115 kV transmission line that would connect <br /> to Line 0831, and the possibility of moving existing Line 0831 from their properties onto adjacent <br /> HFA land. At this time, the parties are working toward an agreement to move existing Line 0831 <br /> from these properties and re-routing Line 0831 on HFA property which parallels the BNSF railroad ' <br /> right-of-way. Xcel Energy is also working with representatives of HFA concerning this matter. <br /> Xcel Energy also met with the landowner west and adjacent to the existing substation site regarding <br /> replacement of the substation, placement of transmission structures, site grading and vegetation. <br /> Xcel Energy will continue to work with this landowner. <br /> Xcel Energy also corresponded and met with BNSF representatives concerning placement of the ' <br /> new 115 kV transmission structures and conductors at least five feet from existing BNSF railroad <br /> right-of-way. On May 9, 2011, Xcel Energy submitted to BNSF an "Application for Wireline <br /> Crossing or Longitudinal" for the proposed transmission line. On June 2, 2011, BNSF approved <br /> Orono Project June 7,2011 ' <br /> MPUC Docket No. E002/TL-11-223 68 <br />