My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Orono Substation Expansion - Enviromental Assessment (1)
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
3960 Sixth Ave N - 29-118-23-33-0009
>
Land Use
>
3960 CR 6 Excel substation
>
Xcel 2011 - File Cabinet 1
>
Orono Substation Expansion - Enviromental Assessment (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:46 PM
Creation date
9/23/2021 2:52:01 PM
Metadata
Fields
Template:
x Address Old
House Number
3960
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3960 6th Avenue North
Document Type
Land Use
PIN
2911823330009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 4 PERMIT CONDITIONS <br /> The Permittee shall comply with the following conditions during construction of the transmission <br /> line and associated facilities and the life of this permit. <br /> 4.1 Plan and Profile <br /> At least 30 calendar days before right-of-way preparation for construction begins on any segment <br /> or portion of the project,the Permittee shall provide the Commission with a Plan and Profile of <br /> the right-of-way and the specifications and drawings for right-of-way preparation, construction, <br /> transmission structure specifications and locations, and restoration for the transmission line. The <br /> documentation shall include maps depicting the plan and profile including the right-of-way, <br /> alignment,and structures in relation to the route and alignme approved per the permit. <br /> The Permittee may not commence construction until the 0 da; has xpired or until the <br /> Commission has advised the Permittee in writing that it has"comp d its review of the <br /> documents and determined that the planned const 'on is con '� ent with this permit. If the <br /> Permittee intend to make any significant change' its:. lan and Profile or the specifications and <br /> ' drawings after submission to the Commission, the Permittee shall notify the Commission at least <br /> five days before implementing the changes. No changes shall be made that would be in violation <br /> of any of the terms of this permit. <br /> 4.2 Construction Practices <br /> ' .The Permittee shall follow those specific constructio ractices and material specifications <br /> described in the Great River Energy Application t th ommis ion for a Route Permit, dated <br /> February 26, 2010, and asAdescribed in the environ to s ment and Findings of Fact, <br /> ' unless this permit establish .' ferent requ' h case this permit shall prevail. <br /> 4.2.1 ,fOr ielRepresentative <br /> ' At least 10 days prior to commacing co truction,the Permittee shall advise the <br /> Commission n writing of the pe :n or persons designated to be the field representative <br /> for the Permittee with the responsibility to oversee compliance with the conditions of this <br /> ' permit during construction. <br /> The field representative's address,phone number, email, and emergency phone number <br /> ' shall be provided to the Commission and shall be made available to affected landowners, <br /> residents,public officials and other interested persons. The Permittee may change the <br /> field representative at any time upon written notice to the Commission. <br /> I <br /> • <br /> ' November 2010 Page 1 9 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.