My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-29-2021 Council Packet
Orono
>
City Council
>
2021
>
03-29-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2021 9:22:22 AM
Creation date
4/15/2021 9:20:37 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2 <br /> <br /> <br />C. Proposals must be signed by an authorized representative of the company. <br /> <br />D. Proposals should be limited to a maximum of 30 pages, including all supporting documentation. <br /> <br />E. In order to ensure a fair review and selection process, firms submitting proposals are specifically <br />requested not to make other contacts with other City staff or Councilmembers regarding their proposals. <br /> <br />F. The city staff plan to review and analyze all proposals as well as schedule interviews in April <br />2021. The City plans to make a final selection by May 24th, 2021. <br /> <br />4. SCOPE OF WORK. The City of Orono is searching for a firm that will complete A/E design and <br />construction related services through completion of the project construction. The scope of services shall <br />include and be broken out in the following phases - conceptual planning and cost estimating, preliminary <br />site/building layouts, final design, preparation of construction documents, (plans, specifications, bidding <br />and contract documents, etc.), bidding administration, and construction administration for the following: <br />• Architectural <br />• Structural Engineering <br />• Mechanical Engineering (Plumbing/fire protection/HVAC) <br />• Electrical Engineering (Including low-voltage rough in) <br />• Furnishings, Fixtures & Equipment (FF&E) design and specifications <br />• Landscape Architecture <br />• Civil site engineering will be provided, as required, by the City Engineer’s Office and the City’s <br />Consulting Engineering firm Bolton and Menk, Inc. <br /> <br />5. SCHEDULE. The following schedule is intended to be a guideline. Each step will be dependent on <br />successful completion of the previous step and the city’s desire to continue with the project. <br /> <br />Selection of A&E Firm. May 2021 <br />Conceptual/feasibility plan and cost estimates July 2021 <br />Preliminary layout and design September 2021 <br />Complete Final Design December 2021 <br />Award Construction Contracts March 2022 <br />Site Preparation Spring 2022 <br />Building construction Summer-Fall 2022 <br /> <br />6. REQUIRED CONTENTS FOR PROPOSALS: <br />A. Title Page. Show the proposal subject, the name of the proposer’s firm, address, telephone <br />number, e-mail address, name of the contact person, and the date. <br /> <br />B. Table of Contents. Include a clear identification of the material by section and page number. <br /> <br />C. Proposing Firm Overview. Describe your firm’s background and history, including the number of <br />years in business. Include information about the firm’s experience performing similar municipal facilities <br />work. <br /> <br />D. Identification and Qualification of Assigned Personnel. <br />1. Describe your firm’s capacity for providing architecture, engineering and construction <br />management services as indicated in this RFQ. The ideal firm should have extensive experience in <br />municipal architectural engineering design and construction management. <br />2. Identify key staff, consultants and positions for each of the phases proposed for this work.
The URL can be used to link to this page
Your browser does not support the video tag.