Laserfiche WebLink
CMP Part 4B. Sanitary Sewer Plan <br /> <br /> <br />City of Orono Community Management Plan 2020-2040 Part 4B, Page 14 <br />Conditions <br />Expansion of the MUSA on the established prioritized basis noted above will occur only when one <br />of the following conditions is found: <br />1. When an area of existing homes has failing or non-conforming septic systems and <br />replacement drain field sites are not available for a significant share of the existing homes. <br /> <br />2. When an individual home has a failing or non-conforming septic system, does not have an <br />alternate drain field site, is adjacent to existing sewer lines, and is not part of a <br />neighborhood that could be better served by a neighborhood sewer lateral project. <br /> <br />3. When a new or existing residential development meeting all required development <br />standards is adjacent to existing sewer lines and the developer or homeowners agree to bear <br />all costs of extending municipal sewer to the development, but only when inclusion of such <br />development in the MUSA will not result in a decrease in the City’s sewered density as <br />calculated by the Metropolitan Council. <br /> <br />Future Sanitary Sewer Improvements <br />The City’s focus on future sanitary sewer needs will be on a limited number of extensions to <br />service new developments within the existing urban area/ MUSA and maintenance to include I&I <br />mitigation of the existing system. <br /> <br />Future Sewer Expansion Projects <br />Table 4B-13 below lists possible future sewer ex pansion projects. Project #4 listed below may <br />include a new connection to a MCES collector. <br /> <br />Table 4B-13: Projects <br />Improvement Projected <br />Year of <br />Completion <br />Triggering <br />Event <br />1 <br />Orono Preserve Development - Sewer main to <br />serve 39 new homes 2018 Subdivision <br />2 <br />Shadywood Villas Development - Sewer main to <br />serve 7 single family homes 2018 Subdivision <br />3 <br />Brackets Point Sewer Main replacement - <br />Replacement of existing gravity main with a <br />forcemain and lift station, away from the lake 2018 Subdivision <br />4 <br />CSAH 112 Sewer Main Extension - Extension of <br />sewer main west along CSAH 112 from Old Crystal <br />Bay Road to serve future developments planned on <br />the south side of CSAH 112. 2019 <br />CSAH <br />turnback <br />5 Wildhurst 2019 Subdivision <br /> <br />