My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-14-2020 Council Packet
Orono
>
City Council
>
2020
>
09-14-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2020 11:35:52 AM
Creation date
12/1/2020 11:23:34 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CMP Part 4B. Sanitary Sewer Plan <br /> <br /> <br />City of Orono Community Management Plan 2020-2040 Part 4B, Page 13 <br />4. Orono will provide municipal sewer extensions to lakeshore areas and non-lakeshore areas <br />within the MUSA when it is determined that municipal sewer is preferable to long-term use of <br />on-site sewage treatment systems. <br /> <br />5. The costs of extending municipal sewer to existing neighborhoods will be borne primarily by <br />the property owners being served. <br /> <br />6. The costs of extending municipal sewer to serve new residential and nonresidential <br />development will be borne entirely by the developer. <br /> <br />FUTURE SANITARY SEWER SYSTEM <br /> <br />Orono’s Plan for future sewer facilities includes upgrades to certain existing local sewer facilities, <br />expansions of the system to service properties currently in the MUSA, and retrofitting a small number of <br />existing neighborhoods with municipal sewer service. These system improvements and expansions are <br />not expected to require additional capacity allocation in metropolitan sewer facilities. <br /> <br />MUSA Expansion <br />The city proposes a minor expansion of the MUSA within the time period covered by this plan. <br />This addition is shown on Map 4B-2 as area 51. Future demands on the sanity sewer system will <br />come as areas within the existing MUSA develop. While the City has no staged development plan, <br />and currently has not scheduled projects outside the existing MUSA, any future MUSA expansions <br />will be considered within the context of the following guidelines: <br /> <br />The city will use the priorities outlined in Table 4B-12 to assess whether or not to request a MUSA <br />expansion from the Metropolitan Council. <br /> <br />Table 4B-12: MUSA Expansion Priorities <br />Priority 1 Properties that abut the shoreline of Lake Minnetonka and all other Orono lakes <br />Priority 2 <br />Properties that abut City-protected tributaries, and all other properties within the <br />Shoreland Overlay District <br />Priority 3 <br />Existing substandard developed lots not covered by Priorities 1 and 2 and developed <br />prior to 1985 that have failing septic systems abd do not have an alternative site available <br />to replace said system. <br />Priority 4 New development using clustering that permanently preserves blocks of open space. <br />Priority 5 <br />Conforming developed lots not covered by Priorities 1 and 2 and developed prior to 1985 <br />that have failing septic systems and do not have an alternative site available to replace <br />said system. <br />Priority 6 New or existing development not covered by priorities 1, 2, 3, 4, or 5. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.