Laserfiche WebLink
AGENDA ITEM <br />Prepared By: J. Barnhart Reviewed By: DJR Approved By: DJR <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1. Purpose. To adopt the resolution and findings based on Council’s December 10th action. <br /> <br />2. MN§462.358 Sub 3b. Application Deadline. The application was received on July 22, 2020 <br />and considered to be complete on that date. The 120-Day review period will expire on November <br />19, 2020. <br /> <br />3. Background. The City Council reviewed this project as a sketch plan (LA20-14) on March 16, <br />2020. This property was previously the subject of a subdivision in 2016, Tanager Estates. <br /> <br />The proposal is consistent with the sketch plan: <br /> <br />7 single family lots, all conforming to the lot area and width requirements*. A new private road <br />extending off of Shoreline Drive will terminate in a conforming cul de sac. All lots will be <br />served by municipal sanitary sewer. The Planning Commission report, Exhibit D provides <br />additional analysis. <br /> <br />The following points should be noted by the City Council. <br /> <br />*Lake Lots. Lots 1-3 are not currently lake lots, but will be once they are combined with the <br />adjacent outlot on the south side of Shoreline, as proposed by the applicant. County rules prohibit <br />showing the lot through the right of way on the plat, but would allow the parcels to be combined <br />after the plat is recorded. Until they are combined, lots 2 and 3 do not meet the width <br />requirement, measured at the front building setback line. Staff recommends that no permit be <br />issued on lots 1-3 until they are combined with the adjacent outlots. <br /> <br />Average Lake Shore (ALS). There was a fair amount of discussion regarding the average lake <br />shore setback. As with most infill subdivision along the lakeshore, without knowing the timing <br />of individual lot construction, and to preserve building sites, it is appropriate to consider <br />“manufacturing” an Average Lakeshore Setback line for the initial construction. <br /> <br />The ALS line for Tanager (Line B on the attached Exhibit H) is established by the principal <br />structure at 1100 Millstone, and the approved house pad for lot 3, Tanager Estates. Without this <br />manufactured ALS, a house on lot 6 built before lot 3 Tanager Estates would need to be setback <br />423 feet, lot 6 is 380 feet deep. <br /> <br />The current, predevelopment ALS for Smith Bay is shown as line A on Exhibit H as is <br />established by the existing neighboring homes: <br /> West 1760 Shoreline Dr. setback 982 feet from the lake <br /> East 1125 Millston Rd. setback 442 feet from the lake <br />The proposed ALS for lots 1-3 is shown as line C. Without the adjustment, lot 3 is not buildable <br />ever, and lot 2 is likely not buildable, though the order of construction may influence potential <br />building sites. <br /> <br /> <br /> Item No.: 15 Date: September 14, 2020 <br />Item Description: LA20-000050 – Timothy Whitten o/b/o Irwin Jacobs 2018 Rev Trust, <br />1700 Shoreline Drive Preliminary Plat – Resolution <br />Presenter: Jeremy Barnhart, AICP <br />Community Development Director <br />Agenda <br />Section: <br />Planning Department <br />Report