Jul 22, 2020 - 11:36am - User:Csyverson L:\PROJECTS\20658.03\CAD\Civil\Sheets\20658.03-C5-EROS.dwg
<br />C5.04
<br />SWPPP
<br />NARRATIVE
<br />Project
<br />Location
<br />Date Submittal / RevisionNo.
<br />Certification
<br />Sheet Title
<br />Summary
<br />Revision History
<br />Sheet No.Revision
<br />Project No.
<br />By
<br />Designed:Drawn:
<br />Approved:Book / Page:
<br />Phase:Initial Issue:
<br />Client
<br />GORDON
<br />JAMES
<br />CONSTRUCTION
<br />5159 MAIN STREET SUITE 200
<br />MAPLE PLAIN, MN 55359
<br />ORCHARD HILL
<br />OF ORONO
<br />ORONO, MN
<br />JEB CJS
<br />ETL
<br />PRELIMINARY 04/22/2020
<br />20658.03
<br />Registration No.Date:
<br />I hereby certify that this plan, specification or
<br />report was prepared by me or under my direct
<br />supervision and that I am a duly licensed
<br />professional ENGINEER under the laws of the state
<br />of Minnesota.
<br />If applicable, contact us for a wet signed copy of this
<br />plan which is available upon request at Sambatek's,
<br />Minnetonka, MN office.
<br />04/22/202050475
<br />Eric T. Luth
<br />04/22/20 City Submittal
<br />05/01/20 MCWD Submittal
<br />05/04/20 City Resubmittal
<br />07/22/20 City Resubmittal
<br />SECTION 1: SITE EVALUATION, ASSESSMENT, AND PLANNING
<br />1.1 PROJECT/SITE INFORMATION
<br />ORCHARD HILL
<br />ORONO ORCHARD ROAD N
<br />CITY: ORONO
<br />STATE: MN
<br />ZIP CODE: 55356
<br />COUNTY: HENNEPIN
<br />THIS SWPPP ADDRESSES THE STORMWATER MANAGEMENT FOR THE ORCHARD HILL PROHECT
<br />WITH IS PART OF AN OVERALL PLAN OF DEVELOPMENT OF 39.4 ACRES. THE DEVELOPMENT PLAN
<br />CONSISTS OF CREATING 5 LOTS WITH CUSTOM BUILT HOMES AND A PRIVATE ROADWAY WITH A
<br />CUL-DE-SAC TO SERVE THOSE 5 LOTS.
<br />NPDES PERMIT NUMBER:
<br />1.2 CONTACT INFORMATION/RESPONSIBLE PARTIES
<br />COMPANY/ORGANIZATION NAME:
<br />CONTACT NAME:
<br />ADDRESS:
<br />CITY, STATE, ZIP CODE:
<br />TELEPHONE NUMBER:
<br />FAX/EMAIL:
<br />GENERAL CONTRACTOR (TO BE COMPLETED BY GENERAL CONTRACTOR):
<br />COMPANY/ORGANIZATION NAME:
<br />CONTACT NAME:
<br />ADDRESS:
<br />CITY, STATE, ZIP CODE:
<br />TELEPHONE NUMBER:
<br />FAX/EMAIL:
<br />INSERT AREA OF CONTROL (IF MORE THAN ONE OPERATOR AT SITE):
<br />THE GENERAL CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF THE MINNESOTA
<br />GENERAL PERMIT AUTHORIZATION TO DISCHARGE STORM WATER ASSOCIATED WITH
<br />CONSTRUCTION ACTIVITY UNDER THE NATIONAL POLLUTION DISCHARGE ELIMINATION
<br />SYSTEM/STATE DISPOSAL SYSTEM PERMIT PROGRAM (GENERAL PERMIT). THE GENERAL
<br />CONTRACTOR MUST COMPLY WITH ANY LOCAL GOVERNING AGENCY (LGU) HAVING
<br />JURISDICTION CONCERNING EROSION AND SEDIMENT CONTROL. THE GENERAL CONTRACTOR
<br />SHALL BE REQUIRED TO BE A CO-APPLICANT WITH THE OWNER. THE GENERAL CONTRACTOR
<br />SHALL BE RESPONSIBLE FOR MAINTENANCE OF THE EROSION AND SEDIMENT CONTROL DEVICES.
<br />THE “APPLICATION FOR GENERAL STORM-WATER PERMIT FOR CONSTRUCTION ACTIVITY (MN
<br />R100001)” SHALL BE COMPLETED BY THE GENERAL CONTRACTOR AND SUBMITTED ONLINE,
<br />ALONG WITH THE REQUIRED APPLICATION FEE, THROUGH THE MPCA'S WEBSITE.
<br />UNLESS NOTIFIED BY THE MINNESOTA POLLUTION CONTROL AGENCY (MPCA) TO THE
<br />CONTRARY, APPLICANTS WHO SUBMIT A COMPLETE APPLICATION FORM IN ACCORDANCE WITH
<br />THE REQUIREMENTS OF THE GENERAL PERMIT ARE AUTHORIZED TO DISCHARGE STORM WATER
<br />FROM THE CONSTRUCTION SITE UNDER THE TERMS AND CONDITIONS OF THIS PERMIT SEVEN
<br />(7) CALENDAR DAYS THE ONLINE APPLICATION PROCESS IS
<br />COMPLETE(HTTPS://NETWEB.PCA.STATE.MN.US/PRIVATE/).
<br />(NOTE: ALL PROJECTS UNDER 50 ACRES MUST SUBMIT THE PERMIT APPLICATION USING THE
<br />ONLINE PROCESS. MAILED APPLICATIONS ARE ONLY ACCEPTED FOR PROJECTS THAT DISTURB 50
<br />OR MORE ACRES, AND HAVE A DISCHARGE POINT WITHIN 1 MILE OF A PROTECTED WATER.)
<br />ADDITIONALLY, AUTHORIZATION WILL BE DELAYED UNDER THE FOLLOWING CIRCUMSTANCES:
<br />·IF THE PROJECT DISTURBS 50 ACRES OR MORE AND HAS A DISCHARGE POINT WITHIN 1
<br />MILE AND FLOWS TO AN IMPAIRED OR SPECIAL WATER WHOSE DISCHARGE MAY
<br />REACH AN IMPAIRED OR SPECIAL WATER LISTED IN SECTION 23 OF THE GENERAL
<br />PERMIT THE APPLICANT SHALL SUBMIT THE STORM WATER POLLUTION PREVENTION
<br />PLAN AND A COMPLETED APPLICATION AT LEAST 30 CALENDAR DAYS PRIOR TO THE
<br />COMMENCEMENT OF CONSTRUCTION ACTIVITIES. UNLESS NOTIFIED BY THE MPCA TO
<br />THE CONTRARY, COVERAGE BECOMES EFFECTIVE 30 CALENDAR DAYS AFTER THE
<br />POSTMARKED DATE OF THE COMPLETED APPLICATION.
<br />·IF THE PROJECT INCLUDES ALTERNATIVE METHODS THE APPLICATION AND TWO
<br />ALTERNATIVE TREATMENT PLANS MUST BE SUBMITTED A MINIMUM OF 90 DAY
<br />BEFORE CONSTRUCTION STARTS.
<br />EROSION & SEDIMENT CONTROL SUBCONTRACTOR (RESPONSIBLE FOR IMPLEMENTING &
<br />UPDATING SWPPP - TO BE COMPLETED BY CONTRACTOR):
<br />COMPANY/ORGANIZATION NAME:
<br />CONTACT NAME:
<br />ADDRESS:
<br />CITY, STATE, ZIP CODE:
<br />TELEPHONE NUMBER:
<br />FAX/EMAIL:
<br />EROSION & SEDIMENT CONTROL INSPECTOR (SEE PART 6.1 OF THIS SWPPP FOR MORE
<br />INFORMATION ON INSPECTION RESPONSIBILITIES- TO BE COMPLETED BY CONTRACTOR):
<br />COMPANY/ORGANIZATION NAME:
<br />CONTACT NAME:
<br />ADDRESS:
<br />CITY, STATE, ZIP CODE:
<br />TELEPHONE NUMBER:
<br />FAX/EMAIL:
<br />GROUND DISTURBING SUBCONTRACTOR(S):
<br />COMPANY/ORGANIZATION NAME:
<br />CONTACT NAME:
<br />ADDRESS:
<br />CITY, STATE, ZIP CODE:
<br />TELEPHONE NUMBER:
<br />FAX/EMAIL:
<br />THE GENERAL CONTRACTOR SHALL PROVIDE A CHAIN OF RESPONSIBILITY WITH ALL OPERATORS
<br />ON THE SITE TO ENSURE THAT THE SWPPP WILL BE IMPLEMENTED AND STAY IN EFFECT UNTIL
<br />THE CONSTRUCTION PROJECT IS COMPLETE AND THE NOT SUBMITTED.
<br />THIS SWPPP WAS PREPARED BY:
<br />COMPANY/ORGANIZATION NAME:
<br />CONTACT NAME:
<br />ADDRESS:
<br />CITY, STATE, ZIP CODE:
<br />TELEPHONE NUMBER:
<br />FAX/EMAIL:
<br />SWPPP DESIGNER CERTIFICATION CARD:
<br />1.3 NATURE OF CONSTRUCTION ACTIVITY
<br />NATURE OF CONSTRUCTION:
<br />THIS SWPPP HAS BEEN PREPARED FOR MAJOR ACTIVITIES ASSOCIATED WITH CONSTRUCTION
<br />OF 5 CUSTOM HOMES, PRIVATE DRIVE, AND STORMWATER BMP'S TOI SERVICE THE
<br />COMMUNITY WITHIN THE ORCHARD HILLS DEVELOPMENT IN ORONO, MN.
<br />ANTICIPATED APPROXIMATE TIMELINES:
<br />ESTIMATED PROJECT START DATE: 09/30/20
<br />ESTIMATED PROJECT COMPLETION DATE:09/30/22
<br />1.4 SOILS, SLOPES, VEGETATION, AND CURRENT DRAINAGE PATTERNS
<br />SOIL TYPE(S):
<br />THE NRCS WEB SOIL SURVEY INDICATES THAT SOILS ON SITE VARY. THE MAJORITY OF THE SITE
<br />CONSISTS OF HSG B/D SOILS AND HSG C SOILS. THESE SOILS HAVE LOW INFILTRATION RATES.
<br />IT IS ASSUMED AT THIS TIME THAT INFILTRATION WILL BE FEASIBLE ON SITE.
<br />SLOPES:
<br />(DESCRIBE THE EXISTING TOPOGRAPHY ON THE SITE. DESCRIBE HOW THAT TOPOGRAPHY
<br />WILL BE IMPACTED BY GRADING ACTIVITIES)
<br />DRAINAGE PATTERNS:
<br />THE EXISTING SITE GENERALLY DRAINS OVERLAND OUTWARD FROM THE CENTER OF
<br />THE SITE. A PORTION OF THE RUNOFF IS DIRECTED INTO THE SW WETLAND , SE
<br />WETLAND AND INTO LONG LAKE CREEK. EXISTING DRAINAGE PATTERNS WILL BE
<br />MAINTAINED WITH THE PROPOSED PROJECT.
<br />VEGETATION:
<br />THE EXISTING SITE IS MOSTLY UNDEVELOPED LAND WITH GRASS COVER, WETLANDS, AND
<br />HEAVY WOODS.
<br />RAINFALL INFORMATION:
<br />RAINFALL INFORMATION - THE AVERAGE TOTAL ANNUAL PRECIPITATION IS ABOUT 28.32
<br />INCHES. OF THIS ABOUT 17.31 INCHES, OR 61 PERCENT, USUALLY FALLS IN MAY THROUGH
<br />SEPTEMBER. THE AVERAGE ANNUAL SNOWFALL IS 57.3 INCHES.
<br />1.5 CONSTRUCTION SITE ESTIMATES
<br />PROJECT AREA SUMMARY:
<br />TOTAL PROJECT AREA: 39.4 ACRES
<br />CONSTRUCTION SITE AREA TO BE DISTURBED: 1.28 ACRES
<br />IMPERVIOUS AREAS:
<br />IMPERVIOUS AREA BEFORE CONSTRUCTION (ACRES): 0.77
<br />IMPERVIOUS AREA AFTER CONSTRUCTION (ACRES): 0.50
<br />1.6 RECEIVING WATERS
<br />DESCRIPTION OF RECEIVING WATERS:
<br />A PORTION OF THE SITE DRAINS TO TWO EXISTING WETLANDS AND LONG LAKE CREEK. LONG
<br />LAKE CREEK IS CONSIDERED AN IMPAIRED STREAM AND DRAINS INTO TANAGER LAKE WHICH
<br />IS ALSO AN IMPAIRED WATER. THE STREAM IMPAIRMENT IS DISSOLVED OXYGEN AND THE
<br />LAKE IMPAIRMENT IS NUTRIENTS. THESE IMPAIRMENT (S) ARE CONSIDERED TO BE
<br />CONSTRUCTION RELATED PARAMETERS AND REQUIRE THE ADDITIONAL BEST MANAGEMENT
<br />PRACTICES.
<br />1.7 SITE FEATURES AND SENSITIVE AREAS TO BE PROTECTED
<br />CONTRACTOR SHOULD TAKE TAKE CARE TO PROTECT THE EXISTING WETLAND, WETLAND
<br />BUFFERS, SIGNIFICANT TREES, AND LONG LAKE CREEK AS MUCH AS POSSIBLE DURING
<br />CONSTRUCTION AND CONSTRUCT THE APPROPRIATE BMP'S TO KEEP SEDIMENT OUT OF THE
<br />WETLAND.
<br />1.8 POTENTIAL SOURCES OF POLLUTION
<br />POTENTIAL SOURCES OF SEDIMENT AND OTHER POLLUTANTS TO STORMWATER RUNOFF:
<br />CONSTRUCTION PHASE POLLUTANT SOURCES ANTICIPATED AT THE SITE ARE DISTURBED
<br />(BARE) SOIL, VEHICLE FUELS AND LUBRICANTS, CHEMICALS ASSOCIATED WITH BUILDING
<br />CONSTRUCTION, AND BUILDING MATERIALS. WITHOUT ADEQUATE CONTROL THERE IS THE
<br />POTENTIAL FOR EACH TYPE OF POLLUTANT TO BE TRANSPORTED BY STORM WATER.
<br />1.9 ENDANGERED/THREATENED SPECIES
<br />THERE ARE NO KNOWN THREATENED OR ENDANGERED SPECIES ARE PRESENT ON SITE.
<br />1.10 HISTORIC PRESERVATION
<br />THERE ARE NO KNOWN HISTORIC SITES ON OR NEAR THE CONSTRUCTION SITE.
<br />1.11 APPLICABLE FEDERAL, TRIBAL, STATE OR LOCAL PROGRAMS
<br />LOCAL GOVERNING UNIT (LGU) REQUIREMENTS:
<br />THE MINNEHAHA CREEK WATERSHED DISTRICT (MCWD) IS THE LOCAL GOVERNING UNIT (LGU)
<br />AND HAS PERMITTING AUTHORITY OF THE SITE. THE WATERSHED REQUIREMENTS FOR
<br />REDEVELOPMENT ARE AS FOLLOWS: RATE CONTROL FOR THE 1, 10, AND 100 YEAR RAINFALL
<br />EVENTS, INFILTRATION OF THE FIRST 1.0 INCH OF RUNOFF FROM IMPERVIOUS SURFACES,
<br />AND TOTAL PHOSPHORUS REMOVAL EQUIVALENT INFILTRATION REQUIREMENT.
<br />1.12 MITIGATION MEASURES FROM ENVIRONMENTAL
<br />REVIEWS/TMDLS/IMPAIRED WATERS
<br />1.13 MAPS
<br />EROSION AND SEDIMENT CONTROL PLANS:
<br />THE FOLLOWING SITE DEVELOPMENT PLAN SHEETS ARE AN INTEGRAL PART OF THIS SWPPP:
<br />C-5.01- PHASE I EROSION AND SEDIMENTATION CONTROL PLAN
<br />C-5.02 - PHASE II EROSION AND SEDIMENTATION CONTROL PLAN
<br />C-5.03 - EROSION AND SEDIMENTATION CONTROL DETAILS & NOTES
<br />C-5.04 - SWPPP NARRATIVE
<br />C-5.05 - SWPPP NARRATIVE
<br />SECTION 2: EROSION AND SEDIMENT CONTROL BMPS
<br />EROSION CONTROL BMPS:
<br />THE PURPOSE OF EROSION CONTROL IS TO PREVENT SOIL PARTICLES FROM BECOMING
<br />SUSPENDED IN WATER AND BEING TRANSPORTED TO EITHER DOWNSTREAM SURFACE WATERS
<br />OR DOWNSTREAM PROPERTIES.
<br />APPROPRIATE CONSTRUCTION PHASING, VEGETATIVE BUFFER STRIPS, HORIZONTAL SLOPE
<br />GRADING, AND OTHER CONSTRUCTION PRACTICES THAT MINIMIZE EROSION MUST BE
<br />PLANNED FOR AND IMPLEMENTED.
<br />IN THE NATURAL CONDITION, SOIL IS STABILIZED BY NATIVE VEGETATION. THE PRIMARY
<br />TECHNIQUE TO BE USED AT THIS PROJECT FOR FINAL STABILIZATION OF SITE SOIL WILL BE TO
<br />PROVIDE A PROTECTIVE COVER OF VEGETATION, PAVEMENT, OR BUILDING.
<br />ALL EXPOSED AREAS MUST BE STABILIZED AS SOON AS POSSIBLE (BUT NO LATER THAN THE
<br />NEXT WORK DAY) TO LIMIT SOIL EROSION, BUT IN NO CASE LATER THAN 14 DAYS. AFTER
<br />THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HAS TEMPORARILY OR
<br />PERMANENTLY CEASED. TEMPORARY SOIL STOCKPILES WITHOUT SIGNIFICANT SILT, CLAY
<br />OR ORGANIC COMPONENTS (E.G. CLEAN AGGREGATED STOCKPILES, DEMOLITION CONCRETE
<br />STOCKPILES, SAND STOCKPILES) AND THE CONSTRUCTED BASE COMPONENTS OF ROADS,
<br />PARKING LOTS AND SIMILAR SURFACES ARE EXEMPT FROM THIS REQUIREMENT, BUT MUST
<br />COMPLY WITH SECTION 2.7 OF THIS SWPPP (SECTION 8.4, 9.9, 9.10, AND 23.9 OF THE
<br />GENERAL PERMIT).
<br />SEDIMENT CONTROL BMPS:
<br />THE PURPOSE OF SEDIMENT CONTROL IS TO PREVENT SOIL PARTICLES THAT HAVE BEEN
<br />SUSPENDED IN WATER FROM ENTERING SURFACE WATERS, INCLUDING CURB AND GUTTER
<br />SYSTEMS AND STORM SEWER INLETS. SEDIMENT CONTROL BMPS HAVE BEEN DESIGNED AS
<br />PART OF THIS SWPPP.
<br />IF THE DOWN GRADIENT TREATMENT SYSTEM IS OVERLOADED, THE CONTRACTOR IS
<br />RESPONSIBLE FOR IMPLEMENTING ADDITIONAL UP GRADIENT SEDIMENT CONTROL PRACTICES
<br />OR REDUNDANT BMPS TO ELIMINATE THE OVERLOADING AND MUST AMEND THE SWPPP TO
<br />IDENTIFY THE ADDITIONAL PRACTICES.
<br />SEDIMENT CONTROL PRACTICES MUST ALWAYS BE ESTABLISHED ON ALL DOWN GRADIENT
<br />PERIMETERS AND BE LOCATED UPGRADIENT OF ANY BUFFER ZONES. THE PERIMETER
<br />SEDIMENT CONTROL PRACTICES MUST BE IN PLACE BEFORE ANY UP GRADIENT LAND
<br />DISTURBING ACTIVITIES BEGIN. THESE PRACTICES MUST REMAIN IN PLACE UNTIL FINAL
<br />STABILIZATION IS ACHIEVED (SEE SECTION 8 OF THIS SWPPP).
<br />THE TIMING OF THE INSTALLATION OF SEDIMENT CONTROL PRACTICES MAY BE ADJUSTED TO
<br />ACCOMMODATE SHORT-TERM ACTIVITIES SUCH AS CLEARING OR GRUBBING, OR PASSAGE OF
<br />VEHICLES. ANY SHORT TERM ACTIVITY MUST BE COMPLETED AS QUICKLY AS POSSIBLE AND
<br />THE SEDIMENT CONTROL PRACTICES MUST BE RE-INSTALLED IMMEDIATELY AFTER THE
<br />ACTIVITY IS COMPLETED. SEDIMENT CONTROL PRACTICES MUST BE INSTALLED BEFORE THE
<br />NEXT RAIN EVENT EVEN IF THE ACTIVITY IS NOT COMPLETE.
<br />2.1 MINIMIZE DISTURBED AREA AND PROTECT NATURAL FEATURES
<br />AND SOIL
<br />THE WETLANDS ON SITE SHALL BE PROTECTED FROM ANY UNNECESSARY DISTURBANCE. THE
<br />CONTRACTOR SHALL PROTECT THE WETLAND AREA WITH SILT FENCE AS INDICATED BY THE
<br />PLANS SHALL ONLY GRADE THE REQUIRED AREAS. CONSTRUCTION TRAFFIC SHALL AVOID THE
<br />WETLAND AREAS MUCH AS POSSIBLE.
<br />CONTRACTOR SHALL MINIMIZE SOIL COMPACTION AND PRESERVE TOPSOIL ON SITE.
<br />2.2 PRESERVE 50 FOOT NATURAL BUFFER
<br />THE CONTRACTOR MUST PRESERVE A 50 FOOT NATURAL BUFFER (OR IF A BUFFER IS
<br />INFEASIBLE ON THE SITE PROVIDE REDUNDANT SEDIMENT CONTROLS) WHEN A SURFACE
<br />WATER IS LOCATED WITHIN 50 FEET OF THE PROJECTS EARTH DISTURBANCES AND
<br />STORMWATER FLOWS TO THE SURFACE WATER. THE CONTRACTOR IS NOT REQUIRED TO
<br />ENHANCE THE QUALITY OF THE VEGETATION THAT ALREADY EXISTS IN THE BUFFER OR
<br />PROVIDE VEGETATION IF NONE EXISTS.
<br />2.3 CONTROL STORMWATER FLOWING ONTO AND THROUGH THE
<br />PROJECT
<br />MEASURES SHOULD BE TAKEN TO ENSURE THAT “CLEAN” RUNOFF FROM OFF SITE IS DIVERTED
<br />AROUND DISTURBED AREAS ON SITE. CARE SHOULD BE TAKEN THAT RE-ROUTING OFF SITE
<br />RUNOFF DOES NOT RESULT IN FLOODING OR OTHER ISSUES ON ADJACENT PROPERTIES.
<br />BMP DESCRIPTION: TEMPORARY DIVERSION DITCH
<br />INSTALLATION SCHEDULE: INSTALL TEMPORARY DIVERSION DITCHES AS SHOWN ON THE SWPPP
<br />PLAN SHEETS, AND AS NEEDED THROUGHOUT CONSTRUCTION, PRIOR TO UP GRADIENT GROUND
<br />DISTURBING ACTIVITIES
<br />MAINTENANCE AND INSPECTION REQUIREMENTS: THE WETTED PERIMETER OF ANY
<br />TEMPORARY OR PERMANENT DRAINAGE DITCH MUST BE STABILIZED WITHIN 200 LINEAL FEET
<br />FROM THE PROPERTY EDGE OR FROM THE POINT OF DISCHARGE INTO ANY SURFACE WATER.
<br />THIS STABILIZATION MUST BE COMPLETED WITHIN 24 HOURS OF CONNECTING TO A SURFACE
<br />WATER. THE REMAINDER OF THE DITCH MUST BE STABILIZED WITHIN 7 DAYS OF CONNECTING
<br />TO A SURFACE WATER AND AFTER CONSTRUCTION HAS CEASED.
<br />TEMPORARY OR PERMANENT DITCHES THAT ARE BEING USED AS A SEDIMENT CONTAINMENT
<br />SYSTEM DO NOT NEED TO BE STABILIZED, BUT MUST BE STABILIZED WITHIN 24 HOURS AFTER NO
<br />LONGER BEING USED AS A SEDIMENT CONTAINMENT SYSTEM.
<br />DITCHES MUST BE INSPECTED EVERY 7 DAYS, AND WITHIN 24 HOURS AFTER A 0.5” 24-HOUR
<br />RAIN EVENT. ANY SEDIMENT DEPOSITED IN DIVERSION DITCHES MUST BE REMOVED AND
<br />ANY EXPOSED SOILS STABILIZED WITHIN 7 DAYS OF DISCOVERY UNLESS PRECLUDED BY LEGAL,
<br />REGULATORY, OR PHYSICAL ACCESS CONSTRAINTS. IF PRECLUDED, NOTE REASON FOR DELAY
<br />ON MAINTENANCE LOG.
<br />RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE):
<br />2.4 STABILIZE SOILS
<br />1.TEMPORARY SEEDING - DISTURBED AREAS THAT ARE NOT YET AT FINAL GRADE BUT THAT
<br />WILL NOT BE ACTIVELY WORKED FOR 7 DAYS OR MORE MUST BE TEMPORARILY
<br />STABILIZED. TEMPORARY STABILIZATION MUST BE INITIATED IMMEDIATELY WHERE WORK
<br />HAS TEMPORARILY CEASED AND MUST BE COMPLETED NO LATER THAN 7 CALENDAR DAYS
<br />AFTER WORK IN THAT PORTION OF THE SITE HAS TEMPORARILY CEASED. TEMPORARY
<br />SEEDING SHALL BE IN ACCORDANCE WITH MN/DOT SEED MIXTURE NUMBER 21-111 OR
<br />21-112 DEPENDING ON THE SEASON OF PLANTING (SEE MN/DOT SPECIFICATION SECTION
<br />2575.3) SEEDING METHOD AND APPLICATION RATE SHALL CONFORM TO MN/DOT
<br />SPECIFICATION SECTION 2575.3. TEMPORARY MULCH SHALL BE APPLIED IN ACCORDANCE
<br />WITH MN/DOT SPECIFICATION SECTION 2575.3C. ALTERNATIVELY, HYDRAULIC SOIL
<br />STABILIZER IN ACCORDANCE WITH MN/DOT SPECIFICATION SECTION 2575.3E MAY BE
<br />USED IN PLACE OF TEMPORARY MULCH.
<br />2.PERMANENT STABILIZATION - ALL AREAS AT FINAL GRADE MUST BE STABILIZED WITHIN 7
<br />DAYS AFTER COMPLETION OF THE MAJOR CONSTRUCTION ACTIVITY. PERMANENT
<br />STABILIZATION MUST BE INITIATED IMMEDIATELY WERE WORK HAS PERMANENTLY
<br />CEASED AND MUST BE COMPLETED NO LATER THAN 7 CALENDAR DAYS AFTER
<br />CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HAS PERMANENTLY CEASED.
<br />SEEDED AREAS SHALL BE PROTECTED WITH MULCH. PERMANENT MULCH SHALL CONFORM
<br />TO MN/DOT SPECIFICATION 3882, TYPE 3 AT 2 TONS/ACRE AND SHALL BE DISK ANCHORED.
<br />HYDRAULIC SOIL STABILIZER MAY BE USED IN PLACE OF MULCH IF APPROVED BY CIVIL
<br />ENGINEER. IF HYDRAULIC SOIL STABILIZER IS USED, IT SHALL BE MN/DOT TYPE 6.
<br />2.5 PROTECT SLOPES
<br />STEEP SLOPE AREAS - THE CONTRACTOR MUST MINIMIZE THE NEED FOR DISTURBANCE OF
<br />PORTIONS OF THE PROJECT THAT HAVE STEEP SLOPES (3:1 OR STEEPER). FOR THOSE SLOPED
<br />AREAS WHICH MUST BE DISTURBED, THE CONTRACTOR MUST USE TECHNIQUES SUCH AS
<br />PHASING AND STABILIZATION PRACTICES DESIGNED FOR STEEP SLOPES, SUCH AS DRAINING AND
<br />TERRACING. SLOPES STEEPER THAN 3:1 MUST BE PROTECTED BY EROSION CONTROL BLANKETS.
<br />BMP DESCRIPTION: EROSION CONTROL BLANKET
<br />INSTALLATION SCHEDULE: INSTALL EROSION CONTROL BLANKETS AS SHOWN ON THE SWPPP
<br />PLAN SHEETS, AND AS NEEDED THROUGHOUT CONSTRUCTION, WITHIN THE TIMEFRAME
<br />ALLOWED FOR STABILIZATION AFTER WORK HAS CEASED IN AN AREA, DEPENDING ON THE
<br />LOCATION (I.E. 24 HOURS, 7 DAYS, 14 DAYS)
<br />MAINTENANCE AND INSPECTION REQUIREMENTS: TO FUNCTION PROPERLY, EROSION
<br />CONTROL BLANKETS MUST BE IN CONTACT WITH THE SOIL BENEATH THE BLANKET. BLANKETS
<br />MUST BE SECURED PER THE CONSTRUCTION DETAIL PROVIDED WITH THE SWPPP PLAN SHEETS.
<br />INSPECT BLANKETS EVERY 7 DAYS OR WITHIN 24 HOURS AFTER A 0.5” 24-HOUR RAIN EVENT.
<br />REPAIR, REPLACE, OR SUPPLEMENT NON-FUNCTIONAL BLANKETS WITHIN 3 DAYS OR BY THE
<br />NEXT RAIN EVENT, WHICHEVER COMES FIRST.
<br />RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE):
<br />2.6 PROTECT STORM DRAIN INLETS
<br />ALL STORM DRAIN INLETS MUST BE PROTECTED BY APPROPRIATE MEANS DURING
<br />CONSTRUCTION UNTIL ALL SOURCES WITH POTENTIAL FOR DISCHARGING TO THE INLET HAVE
<br />BEEN STABILIZED. INLET PROTECTION MAY BE REMOVED FOR A PARTICULAR INLET IF A
<br />SPECIFIC SAFETY CONCERN (STREET FLOODING/FREEZING) HAS BEEN IDENTIFIED AND
<br />PERMITTEE(S) HAVE RECEIVED WRITTEN CORRESPONDENCE FROM THE JURISDICTIONAL
<br />AUTHORITY (E.G. CITY/COUNTY/TOWNSHIP/MNDOT/ETC.) VERIFYING THE NEED FOR
<br />REMOVAL. THE WRITTEN CORRESPONDENCE MUST BE DOCUMENTED IN THIS SWPPP.
<br />BMP DESCRIPTION: SILT FENCE INLET PROTECTION
<br />INSTALLATION SCHEDULE: INSTALL INLET PROTECTION IN EXISTING STRUCTURES AS DIRECTED
<br />ON THE SWPPP PLAN SHEETS, AND AS NEEDED THROUGHOUT CONSTRUCTION, PRIOR TO
<br />BEGINNING GROUND DISTURBING ACTIVITIES UP GRADIENT OF THE INLET. INSTALL INLET
<br />PROTECTION ON NEW STRUCTURES AS SOON AS THE STRUCTURES ARE PUT INTO USE.
<br />MAINTENANCE AND INSPECTION REQUIREMENTS: INSPECT SILT FENCE EVERY 7 DAYS OR
<br />WITHIN 24 HOURS AFTER A 0.5” 24-HOUR RAIN EVENT. SEDIMENT ACCUMULATIONS SHOULD
<br />BE REMOVED WHEN SEDIMENT BUILD-UP REACHES 1/2 THE HEIGHT OF THE SILT FENCE. THIS
<br />MAINTENANCE MUST BE COMPLETED WITHIN 24 HOURS OF DISCOVERY.
<br />RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE):
<br />BMP DESCRIPTION: INLET PROTECTION (INLET INSERT DEVICE)
<br />INSTALLATION SCHEDULE: INSTALL INLET PROTECTION IN EXISTING STRUCTURES AS DIRECTED
<br />ON THE SWPPP PLAN SHEETS, AND AS NEEDED THROUGHOUT CONSTRUCTION, PRIOR TO
<br />BEGINNING GROUND DISTURBING ACTIVITIES UP GRADIENT OF THE INLET. INSTALL INLET
<br />PROTECTION ON NEW STRUCTURES AS SOON AS THE STRUCTURES ARE PUT INTO USE.
<br />MAINTENANCE AND INSPECTION REQUIREMENTS: INSPECT INLET PROTECTION EVERY 7
<br />DAYS OR WITHIN 24 HOURS AFTER A 0.5” 24-HOUR RAIN EVENT. SEDIMENT ACCUMULATIONS
<br />SHOULD BE REMOVED WHEN SEDIMENT BUILD-UP REACHES 1/2 THE CAPACITY OF THE
<br />DEVICE, OR, IF MORE STRINGENT, IN ACCORDANCE WITH MANUFACTURER
<br />RECOMMENDATIONS. THIS MAINTENANCE MUST BE COMPLETED WITHIN 24 HOURS OF
<br />DISCOVERY.
<br />RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE):
<br />2.7 ESTABLISH PERIMETER CONTROLS AND SEDIMENT BARRIERS
<br />ALL STRUCTURAL SEDIMENT CONTROLS INTENDED TO RECEIVE AND TREAT CONSTRUCTION
<br />RUNOFF MUST BE IN PLACE BEFORE ANY UP GRADIENT LAND ALTERATION CAN BEGIN AND
<br />MUST STAY IN OPERATION UNTIL FINAL STABILIZATION OF THE SITE HAS BEEN ACHIEVED.
<br />TEMPORARY SOIL STOCKPILES MUST HAVE SILT FENCE OR OTHER EFFECTIVE SEDIMENT
<br />CONTROLS, AND CANNOT BE PLACED IN ANY NATURAL BUFFERS OR SURFACE WATERS,
<br />INCLUDING STORMWATER CONVEYANCES SUCH AS CURB AND GUTTER SYSTEMS, OR
<br />CONDUITS AND DITCHES UNLESS THERE IS A BYPASS IN PLACE FOR THE STORMWATER.
<br />BMP DESCRIPTION: SILT FENCE
<br />INSTALLATION SCHEDULE: INSTALL SILT FENCE AS DIRECTED ON THE SWPPP PLAN SHEETS,
<br />AND AS NEEDED THROUGHOUT CONSTRUCTION, PRIOR TO COMMENCING UP GRADIENT
<br />LAND DISTURBING ACTIVITIES.
<br />MAINTENANCE AND INSPECTION REQUIREMENTS: INSPECT SILT FENCE EVERY 7 DAYS OR
<br />WITHIN 24 HOURS AFTER A 0.5” 24-HOUR RAIN EVENT. SEDIMENT ACCUMULATIONS SHOULD
<br />BE REMOVED WHEN SEDIMENT BUILD-UP REACHES 1/2 THE HEIGHT OF THE SILT FENCE. THIS
<br />MAINTENANCE MUST BE COMPLETED WITHIN 24 HOURS OF DISCOVERY.
<br />RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE):
<br />BMP DESCRIPTION: BIOLOGS
<br />INSTALLATION SCHEDULE: INSTALL BIOLOGS AS DIRECTED ON THE SWPPP PLAN SHEETS, AND
<br />AS NEEDED THROUGHOUT CONSTRUCTION, PRIOR TO COMMENCING UP GRADIENT LAND
<br />DISTURBING ACTIVITIES.
<br />MAINTENANCE AND INSPECTION REQUIREMENTS: INSPECT BIOLOGS EVERY 7 DAYS OR
<br />WITHIN 24 HOURS AFTER A 0.5” 24-HOUR RAIN EVENT. SEDIMENT ACCUMULATIONS SHOULD
<br />BE REMOVED WHEN SEDIMENT BUILD-UP REACHES 1/2 THE HEIGHT OF THE BIOLOG. THIS
<br />MAINTENANCE MUST BE COMPLETED WITHIN 24 HOURS OF DISCOVERY.
<br />RESPONSIBLE STAFF (C
<br />2.8 RETAIN SEDIMENT ON-SITE
<br />ANY OFF-SITE ACCUMULATIONS OF SEDIMENT MUST BE REMOVED IN A MANNER AND AT A
<br />FREQUENCY SUFFICIENT TO MINIMIZE OFF-SITE IMPACT (E.G. FUGITIVE SEDIMENT IN STREETS
<br />COULD BE WASHED INTO STORM SEWERS BY THE NEXT RAIN AND/OR POSE A SAFETY HAZARD
<br />TO USERS OF PUBLIC STREETS. IF A TEMPORARY SEDIMENT BASIN IS UTILIZED IT MUST
<br />FOLLOW THE REQUIREMENTS OF THE GENERAL PERMIT.
<br />BMP DESCRIPTION: TEMPORARY SEDIMENTATION BASIN
<br />INSTALLATION SCHEDULE: INSTALL TEMPORARY SEDIMENTATION BASIN PRIOR TO
<br />BEGINNING UPSLOPE LAND DISTURBING ACTIVITIES. IF THIS IS NOT POSSIBLE DUE TO EXISTING
<br />TOPOGRAPHY, LIMIT DISTURBANCE TO ONLY THOSE AREAS NECESSARY TO INSTALL
<br />TEMPORARY SEDIMENTATION BASIN.
<br />MAINTENANCE AND INSPECTION REQUIREMENTS: INSPECT TEMPORARY SEDIMENTATION
<br />BASINS EVERY 7 DAYS OR WITHIN 24 HOURS AFTER A 0.5” 24-HOUR RAIN EVENT.
<br />TEMPORARY AND PERMANENT SEDIMENTATION BASINS MUST BE DRAINED AND THE
<br />SEDIMENT REMOVED WHEN THE VOLUME OF SEDIMENT COLLECTED IN THE BASIN REACHES ½
<br />THE STORAGE VOLUME. THIS MAINTENANCE MUST BE COMPLETED WITHIN 72 HOURS OF
<br />DISCOVERY, OR AS SOON AS FIELD CONDITIONS ALLOW ACCESS. IF CONDITIONS DO NOT
<br />ALLOW MAINTENANCE TO BE PERFORMED WITHIN 72 HOURS, DOCUMENT THE CAUSE OF
<br />DELAY ON THE MAINTENANCE FORM. REFER TO SECTION 3.1 OF THIS SWPPP FOR BASIN
<br />DRAINING GUIDELINES.
<br />RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE):
<br />2.9 ESTABLISH VEHICLE TRACKING PADS
<br />VEHICLE TRACKING PADS HAVE BEEN DESIGNED TO PREVENT SEDIMENT TRACK OFF. IF THERE
<br />IS EVIDENCE OF SEDIMENT TRACKING FROM VEHICLES IN PAVED AREAS, THE SEDIMENT MUST
<br />BE REMOVED BY STREET SWEEPING OR OTHER METHOD AS SOON AS FEASIBLY POSSIBLE, BUT
<br />NO LONGER THAN 24 HOURS AFTER DISCOVERY. (SECTION 9.11 AND 9.12 OF THE GENERAL
<br />PERMIT).
<br />BMP DESCRIPTION: VEHICLE TRACKING PAD
<br />INSTALLATION SCHEDULE: INSTALL VEHICLE TRACKING PAD AS SHOWN ON THE SWPPP PLAN
<br />SHEETS AS SOON AS POSSIBLE AT THE BEGINNING OF CONSTRUCTION ACTIVITIES. INSTALL
<br />ADDITIONAL VEHICLE TRACKING PADS AS NEEDED THROUGHOUT CONSTRUCTION.
<br />MAINTENANCE AND INSPECTION REQUIREMENTS: INSPECT VEHICLE TRACKING PADS EVERY 7
<br />DAYS OR WITHIN 24 HOURS AFTER A 0.5” 24-HOUR RAIN EVENT. VEHICLE TRACKING PADS
<br />MUST BE PERIODICALLY 'REFRESHED' TO ENSURE PROPER FUNCTIONALITY. MAINTENANCE
<br />SHOULD BE PERFORMED WHEN THE EXIT APPEARS SMOOTH AND COMPACTED OR WHEN THE
<br />VEHICLE TRACKING PAD CEASES TO FUNCTION PROPERLY. VEHICLE TRACKING PAD LOCATIONS
<br />SHOULD BE INSPECTED FOR SIGNS OF OFF-SITE SEDIMENT TRACKING. TRACKED SEDIMENT
<br />MUST BE REMOVED FROM ALL PAVED SURFACES WITHIN 24 HOURS OF DISCOVERY. STREET
<br />SWEEPING MUST BE USED IF VEHICLE TRACKING PADS ARE NOT ADEQUATE TO PREVENT
<br />SEDIMENT FROM BEING TRACKED ONTO THE STREET.
<br />RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE):
|