Jul 22, 2020 - 11:36am - User:Csyverson L:\PROJECTS\20658.03\CAD\Civil\Sheets\20658.03-C5-EROS.dwg <br />C5.04 <br />SWPPP <br />NARRATIVE <br />Project <br />Location <br />Date Submittal / RevisionNo. <br />Certification <br />Sheet Title <br />Summary <br />Revision History <br />Sheet No.Revision <br />Project No. <br />By <br />Designed:Drawn: <br />Approved:Book / Page: <br />Phase:Initial Issue: <br />Client <br />GORDON <br />JAMES <br />CONSTRUCTION <br />5159 MAIN STREET SUITE 200 <br />MAPLE PLAIN, MN 55359 <br />ORCHARD HILL <br />OF ORONO <br />ORONO, MN <br />JEB CJS <br />ETL <br />PRELIMINARY 04/22/2020 <br />20658.03 <br />Registration No.Date: <br />I hereby certify that this plan, specification or <br />report was prepared by me or under my direct <br />supervision and that I am a duly licensed <br />professional ENGINEER under the laws of the state <br />of Minnesota. <br />If applicable, contact us for a wet signed copy of this <br />plan which is available upon request at Sambatek's, <br />Minnetonka, MN office. <br />04/22/202050475 <br />Eric T. Luth <br />04/22/20 City Submittal <br />05/01/20 MCWD Submittal <br />05/04/20 City Resubmittal <br />07/22/20 City Resubmittal <br />SECTION 1: SITE EVALUATION, ASSESSMENT, AND PLANNING <br />1.1 PROJECT/SITE INFORMATION <br />ORCHARD HILL <br />ORONO ORCHARD ROAD N <br />CITY: ORONO <br />STATE: MN <br />ZIP CODE: 55356 <br />COUNTY: HENNEPIN <br />THIS SWPPP ADDRESSES THE STORMWATER MANAGEMENT FOR THE ORCHARD HILL PROHECT <br />WITH IS PART OF AN OVERALL PLAN OF DEVELOPMENT OF 39.4 ACRES. THE DEVELOPMENT PLAN <br />CONSISTS OF CREATING 5 LOTS WITH CUSTOM BUILT HOMES AND A PRIVATE ROADWAY WITH A <br />CUL-DE-SAC TO SERVE THOSE 5 LOTS. <br />NPDES PERMIT NUMBER: <br />1.2 CONTACT INFORMATION/RESPONSIBLE PARTIES <br />COMPANY/ORGANIZATION NAME: <br />CONTACT NAME: <br />ADDRESS: <br />CITY, STATE, ZIP CODE: <br />TELEPHONE NUMBER: <br />FAX/EMAIL: <br />GENERAL CONTRACTOR (TO BE COMPLETED BY GENERAL CONTRACTOR): <br />COMPANY/ORGANIZATION NAME: <br />CONTACT NAME: <br />ADDRESS: <br />CITY, STATE, ZIP CODE: <br />TELEPHONE NUMBER: <br />FAX/EMAIL: <br />INSERT AREA OF CONTROL (IF MORE THAN ONE OPERATOR AT SITE): <br />THE GENERAL CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF THE MINNESOTA <br />GENERAL PERMIT AUTHORIZATION TO DISCHARGE STORM WATER ASSOCIATED WITH <br />CONSTRUCTION ACTIVITY UNDER THE NATIONAL POLLUTION DISCHARGE ELIMINATION <br />SYSTEM/STATE DISPOSAL SYSTEM PERMIT PROGRAM (GENERAL PERMIT). THE GENERAL <br />CONTRACTOR MUST COMPLY WITH ANY LOCAL GOVERNING AGENCY (LGU) HAVING <br />JURISDICTION CONCERNING EROSION AND SEDIMENT CONTROL. THE GENERAL CONTRACTOR <br />SHALL BE REQUIRED TO BE A CO-APPLICANT WITH THE OWNER. THE GENERAL CONTRACTOR <br />SHALL BE RESPONSIBLE FOR MAINTENANCE OF THE EROSION AND SEDIMENT CONTROL DEVICES. <br />THE “APPLICATION FOR GENERAL STORM-WATER PERMIT FOR CONSTRUCTION ACTIVITY (MN <br />R100001)” SHALL BE COMPLETED BY THE GENERAL CONTRACTOR AND SUBMITTED ONLINE, <br />ALONG WITH THE REQUIRED APPLICATION FEE, THROUGH THE MPCA'S WEBSITE. <br />UNLESS NOTIFIED BY THE MINNESOTA POLLUTION CONTROL AGENCY (MPCA) TO THE <br />CONTRARY, APPLICANTS WHO SUBMIT A COMPLETE APPLICATION FORM IN ACCORDANCE WITH <br />THE REQUIREMENTS OF THE GENERAL PERMIT ARE AUTHORIZED TO DISCHARGE STORM WATER <br />FROM THE CONSTRUCTION SITE UNDER THE TERMS AND CONDITIONS OF THIS PERMIT SEVEN <br />(7) CALENDAR DAYS THE ONLINE APPLICATION PROCESS IS <br />COMPLETE(HTTPS://NETWEB.PCA.STATE.MN.US/PRIVATE/). <br />(NOTE: ALL PROJECTS UNDER 50 ACRES MUST SUBMIT THE PERMIT APPLICATION USING THE <br />ONLINE PROCESS. MAILED APPLICATIONS ARE ONLY ACCEPTED FOR PROJECTS THAT DISTURB 50 <br />OR MORE ACRES, AND HAVE A DISCHARGE POINT WITHIN 1 MILE OF A PROTECTED WATER.) <br />ADDITIONALLY, AUTHORIZATION WILL BE DELAYED UNDER THE FOLLOWING CIRCUMSTANCES: <br />·IF THE PROJECT DISTURBS 50 ACRES OR MORE AND HAS A DISCHARGE POINT WITHIN 1 <br />MILE AND FLOWS TO AN IMPAIRED OR SPECIAL WATER WHOSE DISCHARGE MAY <br />REACH AN IMPAIRED OR SPECIAL WATER LISTED IN SECTION 23 OF THE GENERAL <br />PERMIT THE APPLICANT SHALL SUBMIT THE STORM WATER POLLUTION PREVENTION <br />PLAN AND A COMPLETED APPLICATION AT LEAST 30 CALENDAR DAYS PRIOR TO THE <br />COMMENCEMENT OF CONSTRUCTION ACTIVITIES. UNLESS NOTIFIED BY THE MPCA TO <br />THE CONTRARY, COVERAGE BECOMES EFFECTIVE 30 CALENDAR DAYS AFTER THE <br />POSTMARKED DATE OF THE COMPLETED APPLICATION. <br />·IF THE PROJECT INCLUDES ALTERNATIVE METHODS THE APPLICATION AND TWO <br />ALTERNATIVE TREATMENT PLANS MUST BE SUBMITTED A MINIMUM OF 90 DAY <br />BEFORE CONSTRUCTION STARTS. <br />EROSION & SEDIMENT CONTROL SUBCONTRACTOR (RESPONSIBLE FOR IMPLEMENTING & <br />UPDATING SWPPP - TO BE COMPLETED BY CONTRACTOR): <br />COMPANY/ORGANIZATION NAME: <br />CONTACT NAME: <br />ADDRESS: <br />CITY, STATE, ZIP CODE: <br />TELEPHONE NUMBER: <br />FAX/EMAIL: <br />EROSION & SEDIMENT CONTROL INSPECTOR (SEE PART 6.1 OF THIS SWPPP FOR MORE <br />INFORMATION ON INSPECTION RESPONSIBILITIES- TO BE COMPLETED BY CONTRACTOR): <br />COMPANY/ORGANIZATION NAME: <br />CONTACT NAME: <br />ADDRESS: <br />CITY, STATE, ZIP CODE: <br />TELEPHONE NUMBER: <br />FAX/EMAIL: <br />GROUND DISTURBING SUBCONTRACTOR(S): <br />COMPANY/ORGANIZATION NAME: <br />CONTACT NAME: <br />ADDRESS: <br />CITY, STATE, ZIP CODE: <br />TELEPHONE NUMBER: <br />FAX/EMAIL: <br />THE GENERAL CONTRACTOR SHALL PROVIDE A CHAIN OF RESPONSIBILITY WITH ALL OPERATORS <br />ON THE SITE TO ENSURE THAT THE SWPPP WILL BE IMPLEMENTED AND STAY IN EFFECT UNTIL <br />THE CONSTRUCTION PROJECT IS COMPLETE AND THE NOT SUBMITTED. <br />THIS SWPPP WAS PREPARED BY: <br />COMPANY/ORGANIZATION NAME: <br />CONTACT NAME: <br />ADDRESS: <br />CITY, STATE, ZIP CODE: <br />TELEPHONE NUMBER: <br />FAX/EMAIL: <br />SWPPP DESIGNER CERTIFICATION CARD: <br />1.3 NATURE OF CONSTRUCTION ACTIVITY <br />NATURE OF CONSTRUCTION: <br />THIS SWPPP HAS BEEN PREPARED FOR MAJOR ACTIVITIES ASSOCIATED WITH CONSTRUCTION <br />OF 5 CUSTOM HOMES, PRIVATE DRIVE, AND STORMWATER BMP'S TOI SERVICE THE <br />COMMUNITY WITHIN THE ORCHARD HILLS DEVELOPMENT IN ORONO, MN. <br />ANTICIPATED APPROXIMATE TIMELINES: <br />ESTIMATED PROJECT START DATE: 09/30/20 <br />ESTIMATED PROJECT COMPLETION DATE:09/30/22 <br />1.4 SOILS, SLOPES, VEGETATION, AND CURRENT DRAINAGE PATTERNS <br />SOIL TYPE(S): <br />THE NRCS WEB SOIL SURVEY INDICATES THAT SOILS ON SITE VARY. THE MAJORITY OF THE SITE <br />CONSISTS OF HSG B/D SOILS AND HSG C SOILS. THESE SOILS HAVE LOW INFILTRATION RATES. <br />IT IS ASSUMED AT THIS TIME THAT INFILTRATION WILL BE FEASIBLE ON SITE. <br />SLOPES: <br />(DESCRIBE THE EXISTING TOPOGRAPHY ON THE SITE. DESCRIBE HOW THAT TOPOGRAPHY <br />WILL BE IMPACTED BY GRADING ACTIVITIES) <br />DRAINAGE PATTERNS: <br />THE EXISTING SITE GENERALLY DRAINS OVERLAND OUTWARD FROM THE CENTER OF <br />THE SITE. A PORTION OF THE RUNOFF IS DIRECTED INTO THE SW WETLAND , SE <br />WETLAND AND INTO LONG LAKE CREEK. EXISTING DRAINAGE PATTERNS WILL BE <br />MAINTAINED WITH THE PROPOSED PROJECT. <br />VEGETATION: <br />THE EXISTING SITE IS MOSTLY UNDEVELOPED LAND WITH GRASS COVER, WETLANDS, AND <br />HEAVY WOODS. <br />RAINFALL INFORMATION: <br />RAINFALL INFORMATION - THE AVERAGE TOTAL ANNUAL PRECIPITATION IS ABOUT 28.32 <br />INCHES. OF THIS ABOUT 17.31 INCHES, OR 61 PERCENT, USUALLY FALLS IN MAY THROUGH <br />SEPTEMBER. THE AVERAGE ANNUAL SNOWFALL IS 57.3 INCHES. <br />1.5 CONSTRUCTION SITE ESTIMATES <br />PROJECT AREA SUMMARY: <br />TOTAL PROJECT AREA: 39.4 ACRES <br />CONSTRUCTION SITE AREA TO BE DISTURBED: 1.28 ACRES <br />IMPERVIOUS AREAS: <br />IMPERVIOUS AREA BEFORE CONSTRUCTION (ACRES): 0.77 <br />IMPERVIOUS AREA AFTER CONSTRUCTION (ACRES): 0.50 <br />1.6 RECEIVING WATERS <br />DESCRIPTION OF RECEIVING WATERS: <br />A PORTION OF THE SITE DRAINS TO TWO EXISTING WETLANDS AND LONG LAKE CREEK. LONG <br />LAKE CREEK IS CONSIDERED AN IMPAIRED STREAM AND DRAINS INTO TANAGER LAKE WHICH <br />IS ALSO AN IMPAIRED WATER. THE STREAM IMPAIRMENT IS DISSOLVED OXYGEN AND THE <br />LAKE IMPAIRMENT IS NUTRIENTS. THESE IMPAIRMENT (S) ARE CONSIDERED TO BE <br />CONSTRUCTION RELATED PARAMETERS AND REQUIRE THE ADDITIONAL BEST MANAGEMENT <br />PRACTICES. <br />1.7 SITE FEATURES AND SENSITIVE AREAS TO BE PROTECTED <br />CONTRACTOR SHOULD TAKE TAKE CARE TO PROTECT THE EXISTING WETLAND, WETLAND <br />BUFFERS, SIGNIFICANT TREES, AND LONG LAKE CREEK AS MUCH AS POSSIBLE DURING <br />CONSTRUCTION AND CONSTRUCT THE APPROPRIATE BMP'S TO KEEP SEDIMENT OUT OF THE <br />WETLAND. <br />1.8 POTENTIAL SOURCES OF POLLUTION <br />POTENTIAL SOURCES OF SEDIMENT AND OTHER POLLUTANTS TO STORMWATER RUNOFF: <br />CONSTRUCTION PHASE POLLUTANT SOURCES ANTICIPATED AT THE SITE ARE DISTURBED <br />(BARE) SOIL, VEHICLE FUELS AND LUBRICANTS, CHEMICALS ASSOCIATED WITH BUILDING <br />CONSTRUCTION, AND BUILDING MATERIALS. WITHOUT ADEQUATE CONTROL THERE IS THE <br />POTENTIAL FOR EACH TYPE OF POLLUTANT TO BE TRANSPORTED BY STORM WATER. <br />1.9 ENDANGERED/THREATENED SPECIES <br />THERE ARE NO KNOWN THREATENED OR ENDANGERED SPECIES ARE PRESENT ON SITE. <br />1.10 HISTORIC PRESERVATION <br />THERE ARE NO KNOWN HISTORIC SITES ON OR NEAR THE CONSTRUCTION SITE. <br />1.11 APPLICABLE FEDERAL, TRIBAL, STATE OR LOCAL PROGRAMS <br />LOCAL GOVERNING UNIT (LGU) REQUIREMENTS: <br />THE MINNEHAHA CREEK WATERSHED DISTRICT (MCWD) IS THE LOCAL GOVERNING UNIT (LGU) <br />AND HAS PERMITTING AUTHORITY OF THE SITE. THE WATERSHED REQUIREMENTS FOR <br />REDEVELOPMENT ARE AS FOLLOWS: RATE CONTROL FOR THE 1, 10, AND 100 YEAR RAINFALL <br />EVENTS, INFILTRATION OF THE FIRST 1.0 INCH OF RUNOFF FROM IMPERVIOUS SURFACES, <br />AND TOTAL PHOSPHORUS REMOVAL EQUIVALENT INFILTRATION REQUIREMENT. <br />1.12 MITIGATION MEASURES FROM ENVIRONMENTAL <br />REVIEWS/TMDLS/IMPAIRED WATERS <br />1.13 MAPS <br />EROSION AND SEDIMENT CONTROL PLANS: <br />THE FOLLOWING SITE DEVELOPMENT PLAN SHEETS ARE AN INTEGRAL PART OF THIS SWPPP: <br />C-5.01- PHASE I EROSION AND SEDIMENTATION CONTROL PLAN <br />C-5.02 - PHASE II EROSION AND SEDIMENTATION CONTROL PLAN <br />C-5.03 - EROSION AND SEDIMENTATION CONTROL DETAILS & NOTES <br />C-5.04 - SWPPP NARRATIVE <br />C-5.05 - SWPPP NARRATIVE <br />SECTION 2: EROSION AND SEDIMENT CONTROL BMPS <br />EROSION CONTROL BMPS: <br />THE PURPOSE OF EROSION CONTROL IS TO PREVENT SOIL PARTICLES FROM BECOMING <br />SUSPENDED IN WATER AND BEING TRANSPORTED TO EITHER DOWNSTREAM SURFACE WATERS <br />OR DOWNSTREAM PROPERTIES. <br />APPROPRIATE CONSTRUCTION PHASING, VEGETATIVE BUFFER STRIPS, HORIZONTAL SLOPE <br />GRADING, AND OTHER CONSTRUCTION PRACTICES THAT MINIMIZE EROSION MUST BE <br />PLANNED FOR AND IMPLEMENTED. <br />IN THE NATURAL CONDITION, SOIL IS STABILIZED BY NATIVE VEGETATION. THE PRIMARY <br />TECHNIQUE TO BE USED AT THIS PROJECT FOR FINAL STABILIZATION OF SITE SOIL WILL BE TO <br />PROVIDE A PROTECTIVE COVER OF VEGETATION, PAVEMENT, OR BUILDING. <br />ALL EXPOSED AREAS MUST BE STABILIZED AS SOON AS POSSIBLE (BUT NO LATER THAN THE <br />NEXT WORK DAY) TO LIMIT SOIL EROSION, BUT IN NO CASE LATER THAN 14 DAYS. AFTER <br />THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HAS TEMPORARILY OR <br />PERMANENTLY CEASED. TEMPORARY SOIL STOCKPILES WITHOUT SIGNIFICANT SILT, CLAY <br />OR ORGANIC COMPONENTS (E.G. CLEAN AGGREGATED STOCKPILES, DEMOLITION CONCRETE <br />STOCKPILES, SAND STOCKPILES) AND THE CONSTRUCTED BASE COMPONENTS OF ROADS, <br />PARKING LOTS AND SIMILAR SURFACES ARE EXEMPT FROM THIS REQUIREMENT, BUT MUST <br />COMPLY WITH SECTION 2.7 OF THIS SWPPP (SECTION 8.4, 9.9, 9.10, AND 23.9 OF THE <br />GENERAL PERMIT). <br />SEDIMENT CONTROL BMPS: <br />THE PURPOSE OF SEDIMENT CONTROL IS TO PREVENT SOIL PARTICLES THAT HAVE BEEN <br />SUSPENDED IN WATER FROM ENTERING SURFACE WATERS, INCLUDING CURB AND GUTTER <br />SYSTEMS AND STORM SEWER INLETS. SEDIMENT CONTROL BMPS HAVE BEEN DESIGNED AS <br />PART OF THIS SWPPP. <br />IF THE DOWN GRADIENT TREATMENT SYSTEM IS OVERLOADED, THE CONTRACTOR IS <br />RESPONSIBLE FOR IMPLEMENTING ADDITIONAL UP GRADIENT SEDIMENT CONTROL PRACTICES <br />OR REDUNDANT BMPS TO ELIMINATE THE OVERLOADING AND MUST AMEND THE SWPPP TO <br />IDENTIFY THE ADDITIONAL PRACTICES. <br />SEDIMENT CONTROL PRACTICES MUST ALWAYS BE ESTABLISHED ON ALL DOWN GRADIENT <br />PERIMETERS AND BE LOCATED UPGRADIENT OF ANY BUFFER ZONES. THE PERIMETER <br />SEDIMENT CONTROL PRACTICES MUST BE IN PLACE BEFORE ANY UP GRADIENT LAND <br />DISTURBING ACTIVITIES BEGIN. THESE PRACTICES MUST REMAIN IN PLACE UNTIL FINAL <br />STABILIZATION IS ACHIEVED (SEE SECTION 8 OF THIS SWPPP). <br />THE TIMING OF THE INSTALLATION OF SEDIMENT CONTROL PRACTICES MAY BE ADJUSTED TO <br />ACCOMMODATE SHORT-TERM ACTIVITIES SUCH AS CLEARING OR GRUBBING, OR PASSAGE OF <br />VEHICLES. ANY SHORT TERM ACTIVITY MUST BE COMPLETED AS QUICKLY AS POSSIBLE AND <br />THE SEDIMENT CONTROL PRACTICES MUST BE RE-INSTALLED IMMEDIATELY AFTER THE <br />ACTIVITY IS COMPLETED. SEDIMENT CONTROL PRACTICES MUST BE INSTALLED BEFORE THE <br />NEXT RAIN EVENT EVEN IF THE ACTIVITY IS NOT COMPLETE. <br />2.1 MINIMIZE DISTURBED AREA AND PROTECT NATURAL FEATURES <br />AND SOIL <br />THE WETLANDS ON SITE SHALL BE PROTECTED FROM ANY UNNECESSARY DISTURBANCE. THE <br />CONTRACTOR SHALL PROTECT THE WETLAND AREA WITH SILT FENCE AS INDICATED BY THE <br />PLANS SHALL ONLY GRADE THE REQUIRED AREAS. CONSTRUCTION TRAFFIC SHALL AVOID THE <br />WETLAND AREAS MUCH AS POSSIBLE. <br />CONTRACTOR SHALL MINIMIZE SOIL COMPACTION AND PRESERVE TOPSOIL ON SITE. <br />2.2 PRESERVE 50 FOOT NATURAL BUFFER <br />THE CONTRACTOR MUST PRESERVE A 50 FOOT NATURAL BUFFER (OR IF A BUFFER IS <br />INFEASIBLE ON THE SITE PROVIDE REDUNDANT SEDIMENT CONTROLS) WHEN A SURFACE <br />WATER IS LOCATED WITHIN 50 FEET OF THE PROJECTS EARTH DISTURBANCES AND <br />STORMWATER FLOWS TO THE SURFACE WATER. THE CONTRACTOR IS NOT REQUIRED TO <br />ENHANCE THE QUALITY OF THE VEGETATION THAT ALREADY EXISTS IN THE BUFFER OR <br />PROVIDE VEGETATION IF NONE EXISTS. <br />2.3 CONTROL STORMWATER FLOWING ONTO AND THROUGH THE <br />PROJECT <br />MEASURES SHOULD BE TAKEN TO ENSURE THAT “CLEAN” RUNOFF FROM OFF SITE IS DIVERTED <br />AROUND DISTURBED AREAS ON SITE. CARE SHOULD BE TAKEN THAT RE-ROUTING OFF SITE <br />RUNOFF DOES NOT RESULT IN FLOODING OR OTHER ISSUES ON ADJACENT PROPERTIES. <br />BMP DESCRIPTION: TEMPORARY DIVERSION DITCH <br />INSTALLATION SCHEDULE: INSTALL TEMPORARY DIVERSION DITCHES AS SHOWN ON THE SWPPP <br />PLAN SHEETS, AND AS NEEDED THROUGHOUT CONSTRUCTION, PRIOR TO UP GRADIENT GROUND <br />DISTURBING ACTIVITIES <br />MAINTENANCE AND INSPECTION REQUIREMENTS: THE WETTED PERIMETER OF ANY <br />TEMPORARY OR PERMANENT DRAINAGE DITCH MUST BE STABILIZED WITHIN 200 LINEAL FEET <br />FROM THE PROPERTY EDGE OR FROM THE POINT OF DISCHARGE INTO ANY SURFACE WATER. <br />THIS STABILIZATION MUST BE COMPLETED WITHIN 24 HOURS OF CONNECTING TO A SURFACE <br />WATER. THE REMAINDER OF THE DITCH MUST BE STABILIZED WITHIN 7 DAYS OF CONNECTING <br />TO A SURFACE WATER AND AFTER CONSTRUCTION HAS CEASED. <br />TEMPORARY OR PERMANENT DITCHES THAT ARE BEING USED AS A SEDIMENT CONTAINMENT <br />SYSTEM DO NOT NEED TO BE STABILIZED, BUT MUST BE STABILIZED WITHIN 24 HOURS AFTER NO <br />LONGER BEING USED AS A SEDIMENT CONTAINMENT SYSTEM. <br />DITCHES MUST BE INSPECTED EVERY 7 DAYS, AND WITHIN 24 HOURS AFTER A 0.5” 24-HOUR <br />RAIN EVENT. ANY SEDIMENT DEPOSITED IN DIVERSION DITCHES MUST BE REMOVED AND <br />ANY EXPOSED SOILS STABILIZED WITHIN 7 DAYS OF DISCOVERY UNLESS PRECLUDED BY LEGAL, <br />REGULATORY, OR PHYSICAL ACCESS CONSTRAINTS. IF PRECLUDED, NOTE REASON FOR DELAY <br />ON MAINTENANCE LOG. <br />RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE): <br />2.4 STABILIZE SOILS <br />1.TEMPORARY SEEDING - DISTURBED AREAS THAT ARE NOT YET AT FINAL GRADE BUT THAT <br />WILL NOT BE ACTIVELY WORKED FOR 7 DAYS OR MORE MUST BE TEMPORARILY <br />STABILIZED. TEMPORARY STABILIZATION MUST BE INITIATED IMMEDIATELY WHERE WORK <br />HAS TEMPORARILY CEASED AND MUST BE COMPLETED NO LATER THAN 7 CALENDAR DAYS <br />AFTER WORK IN THAT PORTION OF THE SITE HAS TEMPORARILY CEASED. TEMPORARY <br />SEEDING SHALL BE IN ACCORDANCE WITH MN/DOT SEED MIXTURE NUMBER 21-111 OR <br />21-112 DEPENDING ON THE SEASON OF PLANTING (SEE MN/DOT SPECIFICATION SECTION <br />2575.3) SEEDING METHOD AND APPLICATION RATE SHALL CONFORM TO MN/DOT <br />SPECIFICATION SECTION 2575.3. TEMPORARY MULCH SHALL BE APPLIED IN ACCORDANCE <br />WITH MN/DOT SPECIFICATION SECTION 2575.3C. ALTERNATIVELY, HYDRAULIC SOIL <br />STABILIZER IN ACCORDANCE WITH MN/DOT SPECIFICATION SECTION 2575.3E MAY BE <br />USED IN PLACE OF TEMPORARY MULCH. <br />2.PERMANENT STABILIZATION - ALL AREAS AT FINAL GRADE MUST BE STABILIZED WITHIN 7 <br />DAYS AFTER COMPLETION OF THE MAJOR CONSTRUCTION ACTIVITY. PERMANENT <br />STABILIZATION MUST BE INITIATED IMMEDIATELY WERE WORK HAS PERMANENTLY <br />CEASED AND MUST BE COMPLETED NO LATER THAN 7 CALENDAR DAYS AFTER <br />CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HAS PERMANENTLY CEASED. <br />SEEDED AREAS SHALL BE PROTECTED WITH MULCH. PERMANENT MULCH SHALL CONFORM <br />TO MN/DOT SPECIFICATION 3882, TYPE 3 AT 2 TONS/ACRE AND SHALL BE DISK ANCHORED. <br />HYDRAULIC SOIL STABILIZER MAY BE USED IN PLACE OF MULCH IF APPROVED BY CIVIL <br />ENGINEER. IF HYDRAULIC SOIL STABILIZER IS USED, IT SHALL BE MN/DOT TYPE 6. <br />2.5 PROTECT SLOPES <br />STEEP SLOPE AREAS - THE CONTRACTOR MUST MINIMIZE THE NEED FOR DISTURBANCE OF <br />PORTIONS OF THE PROJECT THAT HAVE STEEP SLOPES (3:1 OR STEEPER). FOR THOSE SLOPED <br />AREAS WHICH MUST BE DISTURBED, THE CONTRACTOR MUST USE TECHNIQUES SUCH AS <br />PHASING AND STABILIZATION PRACTICES DESIGNED FOR STEEP SLOPES, SUCH AS DRAINING AND <br />TERRACING. SLOPES STEEPER THAN 3:1 MUST BE PROTECTED BY EROSION CONTROL BLANKETS. <br />BMP DESCRIPTION: EROSION CONTROL BLANKET <br />INSTALLATION SCHEDULE: INSTALL EROSION CONTROL BLANKETS AS SHOWN ON THE SWPPP <br />PLAN SHEETS, AND AS NEEDED THROUGHOUT CONSTRUCTION, WITHIN THE TIMEFRAME <br />ALLOWED FOR STABILIZATION AFTER WORK HAS CEASED IN AN AREA, DEPENDING ON THE <br />LOCATION (I.E. 24 HOURS, 7 DAYS, 14 DAYS) <br />MAINTENANCE AND INSPECTION REQUIREMENTS: TO FUNCTION PROPERLY, EROSION <br />CONTROL BLANKETS MUST BE IN CONTACT WITH THE SOIL BENEATH THE BLANKET. BLANKETS <br />MUST BE SECURED PER THE CONSTRUCTION DETAIL PROVIDED WITH THE SWPPP PLAN SHEETS. <br />INSPECT BLANKETS EVERY 7 DAYS OR WITHIN 24 HOURS AFTER A 0.5” 24-HOUR RAIN EVENT. <br />REPAIR, REPLACE, OR SUPPLEMENT NON-FUNCTIONAL BLANKETS WITHIN 3 DAYS OR BY THE <br />NEXT RAIN EVENT, WHICHEVER COMES FIRST. <br />RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE): <br />2.6 PROTECT STORM DRAIN INLETS <br />ALL STORM DRAIN INLETS MUST BE PROTECTED BY APPROPRIATE MEANS DURING <br />CONSTRUCTION UNTIL ALL SOURCES WITH POTENTIAL FOR DISCHARGING TO THE INLET HAVE <br />BEEN STABILIZED. INLET PROTECTION MAY BE REMOVED FOR A PARTICULAR INLET IF A <br />SPECIFIC SAFETY CONCERN (STREET FLOODING/FREEZING) HAS BEEN IDENTIFIED AND <br />PERMITTEE(S) HAVE RECEIVED WRITTEN CORRESPONDENCE FROM THE JURISDICTIONAL <br />AUTHORITY (E.G. CITY/COUNTY/TOWNSHIP/MNDOT/ETC.) VERIFYING THE NEED FOR <br />REMOVAL. THE WRITTEN CORRESPONDENCE MUST BE DOCUMENTED IN THIS SWPPP. <br />BMP DESCRIPTION: SILT FENCE INLET PROTECTION <br />INSTALLATION SCHEDULE: INSTALL INLET PROTECTION IN EXISTING STRUCTURES AS DIRECTED <br />ON THE SWPPP PLAN SHEETS, AND AS NEEDED THROUGHOUT CONSTRUCTION, PRIOR TO <br />BEGINNING GROUND DISTURBING ACTIVITIES UP GRADIENT OF THE INLET. INSTALL INLET <br />PROTECTION ON NEW STRUCTURES AS SOON AS THE STRUCTURES ARE PUT INTO USE. <br />MAINTENANCE AND INSPECTION REQUIREMENTS: INSPECT SILT FENCE EVERY 7 DAYS OR <br />WITHIN 24 HOURS AFTER A 0.5” 24-HOUR RAIN EVENT. SEDIMENT ACCUMULATIONS SHOULD <br />BE REMOVED WHEN SEDIMENT BUILD-UP REACHES 1/2 THE HEIGHT OF THE SILT FENCE. THIS <br />MAINTENANCE MUST BE COMPLETED WITHIN 24 HOURS OF DISCOVERY. <br />RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE): <br />BMP DESCRIPTION: INLET PROTECTION (INLET INSERT DEVICE) <br />INSTALLATION SCHEDULE: INSTALL INLET PROTECTION IN EXISTING STRUCTURES AS DIRECTED <br />ON THE SWPPP PLAN SHEETS, AND AS NEEDED THROUGHOUT CONSTRUCTION, PRIOR TO <br />BEGINNING GROUND DISTURBING ACTIVITIES UP GRADIENT OF THE INLET. INSTALL INLET <br />PROTECTION ON NEW STRUCTURES AS SOON AS THE STRUCTURES ARE PUT INTO USE. <br />MAINTENANCE AND INSPECTION REQUIREMENTS: INSPECT INLET PROTECTION EVERY 7 <br />DAYS OR WITHIN 24 HOURS AFTER A 0.5” 24-HOUR RAIN EVENT. SEDIMENT ACCUMULATIONS <br />SHOULD BE REMOVED WHEN SEDIMENT BUILD-UP REACHES 1/2 THE CAPACITY OF THE <br />DEVICE, OR, IF MORE STRINGENT, IN ACCORDANCE WITH MANUFACTURER <br />RECOMMENDATIONS. THIS MAINTENANCE MUST BE COMPLETED WITHIN 24 HOURS OF <br />DISCOVERY. <br />RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE): <br />2.7 ESTABLISH PERIMETER CONTROLS AND SEDIMENT BARRIERS <br />ALL STRUCTURAL SEDIMENT CONTROLS INTENDED TO RECEIVE AND TREAT CONSTRUCTION <br />RUNOFF MUST BE IN PLACE BEFORE ANY UP GRADIENT LAND ALTERATION CAN BEGIN AND <br />MUST STAY IN OPERATION UNTIL FINAL STABILIZATION OF THE SITE HAS BEEN ACHIEVED. <br />TEMPORARY SOIL STOCKPILES MUST HAVE SILT FENCE OR OTHER EFFECTIVE SEDIMENT <br />CONTROLS, AND CANNOT BE PLACED IN ANY NATURAL BUFFERS OR SURFACE WATERS, <br />INCLUDING STORMWATER CONVEYANCES SUCH AS CURB AND GUTTER SYSTEMS, OR <br />CONDUITS AND DITCHES UNLESS THERE IS A BYPASS IN PLACE FOR THE STORMWATER. <br />BMP DESCRIPTION: SILT FENCE <br />INSTALLATION SCHEDULE: INSTALL SILT FENCE AS DIRECTED ON THE SWPPP PLAN SHEETS, <br />AND AS NEEDED THROUGHOUT CONSTRUCTION, PRIOR TO COMMENCING UP GRADIENT <br />LAND DISTURBING ACTIVITIES. <br />MAINTENANCE AND INSPECTION REQUIREMENTS: INSPECT SILT FENCE EVERY 7 DAYS OR <br />WITHIN 24 HOURS AFTER A 0.5” 24-HOUR RAIN EVENT. SEDIMENT ACCUMULATIONS SHOULD <br />BE REMOVED WHEN SEDIMENT BUILD-UP REACHES 1/2 THE HEIGHT OF THE SILT FENCE. THIS <br />MAINTENANCE MUST BE COMPLETED WITHIN 24 HOURS OF DISCOVERY. <br />RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE): <br />BMP DESCRIPTION: BIOLOGS <br />INSTALLATION SCHEDULE: INSTALL BIOLOGS AS DIRECTED ON THE SWPPP PLAN SHEETS, AND <br />AS NEEDED THROUGHOUT CONSTRUCTION, PRIOR TO COMMENCING UP GRADIENT LAND <br />DISTURBING ACTIVITIES. <br />MAINTENANCE AND INSPECTION REQUIREMENTS: INSPECT BIOLOGS EVERY 7 DAYS OR <br />WITHIN 24 HOURS AFTER A 0.5” 24-HOUR RAIN EVENT. SEDIMENT ACCUMULATIONS SHOULD <br />BE REMOVED WHEN SEDIMENT BUILD-UP REACHES 1/2 THE HEIGHT OF THE BIOLOG. THIS <br />MAINTENANCE MUST BE COMPLETED WITHIN 24 HOURS OF DISCOVERY. <br />RESPONSIBLE STAFF (C <br />2.8 RETAIN SEDIMENT ON-SITE <br />ANY OFF-SITE ACCUMULATIONS OF SEDIMENT MUST BE REMOVED IN A MANNER AND AT A <br />FREQUENCY SUFFICIENT TO MINIMIZE OFF-SITE IMPACT (E.G. FUGITIVE SEDIMENT IN STREETS <br />COULD BE WASHED INTO STORM SEWERS BY THE NEXT RAIN AND/OR POSE A SAFETY HAZARD <br />TO USERS OF PUBLIC STREETS. IF A TEMPORARY SEDIMENT BASIN IS UTILIZED IT MUST <br />FOLLOW THE REQUIREMENTS OF THE GENERAL PERMIT. <br />BMP DESCRIPTION: TEMPORARY SEDIMENTATION BASIN <br />INSTALLATION SCHEDULE: INSTALL TEMPORARY SEDIMENTATION BASIN PRIOR TO <br />BEGINNING UPSLOPE LAND DISTURBING ACTIVITIES. IF THIS IS NOT POSSIBLE DUE TO EXISTING <br />TOPOGRAPHY, LIMIT DISTURBANCE TO ONLY THOSE AREAS NECESSARY TO INSTALL <br />TEMPORARY SEDIMENTATION BASIN. <br />MAINTENANCE AND INSPECTION REQUIREMENTS: INSPECT TEMPORARY SEDIMENTATION <br />BASINS EVERY 7 DAYS OR WITHIN 24 HOURS AFTER A 0.5” 24-HOUR RAIN EVENT. <br />TEMPORARY AND PERMANENT SEDIMENTATION BASINS MUST BE DRAINED AND THE <br />SEDIMENT REMOVED WHEN THE VOLUME OF SEDIMENT COLLECTED IN THE BASIN REACHES ½ <br />THE STORAGE VOLUME. THIS MAINTENANCE MUST BE COMPLETED WITHIN 72 HOURS OF <br />DISCOVERY, OR AS SOON AS FIELD CONDITIONS ALLOW ACCESS. IF CONDITIONS DO NOT <br />ALLOW MAINTENANCE TO BE PERFORMED WITHIN 72 HOURS, DOCUMENT THE CAUSE OF <br />DELAY ON THE MAINTENANCE FORM. REFER TO SECTION 3.1 OF THIS SWPPP FOR BASIN <br />DRAINING GUIDELINES. <br />RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE): <br />2.9 ESTABLISH VEHICLE TRACKING PADS <br />VEHICLE TRACKING PADS HAVE BEEN DESIGNED TO PREVENT SEDIMENT TRACK OFF. IF THERE <br />IS EVIDENCE OF SEDIMENT TRACKING FROM VEHICLES IN PAVED AREAS, THE SEDIMENT MUST <br />BE REMOVED BY STREET SWEEPING OR OTHER METHOD AS SOON AS FEASIBLY POSSIBLE, BUT <br />NO LONGER THAN 24 HOURS AFTER DISCOVERY. (SECTION 9.11 AND 9.12 OF THE GENERAL <br />PERMIT). <br />BMP DESCRIPTION: VEHICLE TRACKING PAD <br />INSTALLATION SCHEDULE: INSTALL VEHICLE TRACKING PAD AS SHOWN ON THE SWPPP PLAN <br />SHEETS AS SOON AS POSSIBLE AT THE BEGINNING OF CONSTRUCTION ACTIVITIES. INSTALL <br />ADDITIONAL VEHICLE TRACKING PADS AS NEEDED THROUGHOUT CONSTRUCTION. <br />MAINTENANCE AND INSPECTION REQUIREMENTS: INSPECT VEHICLE TRACKING PADS EVERY 7 <br />DAYS OR WITHIN 24 HOURS AFTER A 0.5” 24-HOUR RAIN EVENT. VEHICLE TRACKING PADS <br />MUST BE PERIODICALLY 'REFRESHED' TO ENSURE PROPER FUNCTIONALITY. MAINTENANCE <br />SHOULD BE PERFORMED WHEN THE EXIT APPEARS SMOOTH AND COMPACTED OR WHEN THE <br />VEHICLE TRACKING PAD CEASES TO FUNCTION PROPERLY. VEHICLE TRACKING PAD LOCATIONS <br />SHOULD BE INSPECTED FOR SIGNS OF OFF-SITE SEDIMENT TRACKING. TRACKED SEDIMENT <br />MUST BE REMOVED FROM ALL PAVED SURFACES WITHIN 24 HOURS OF DISCOVERY. STREET <br />SWEEPING MUST BE USED IF VEHICLE TRACKING PADS ARE NOT ADEQUATE TO PREVENT <br />SEDIMENT FROM BEING TRACKED ONTO THE STREET. <br />RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE):