Laserfiche WebLink
Jul 22, 2020 - 11:36am - User:Csyverson L:\PROJECTS\20658.03\CAD\Civil\Sheets\20658.03-C5-EROS.dwg <br />C5.03 <br />EROSION <br />CONTROL <br />NOTES & <br />DETAILS <br />Project <br />Location <br />Date Submittal / RevisionNo. <br />Certification <br />Sheet Title <br />Summary <br />Revision History <br />Sheet No.Revision <br />Project No. <br />By <br />Designed:Drawn: <br />Approved:Book / Page: <br />Phase:Initial Issue: <br />Client <br />GORDON <br />JAMES <br />CONSTRUCTION <br />5159 MAIN STREET SUITE 200 <br />MAPLE PLAIN, MN 55359 <br />ORCHARD HILL <br />OF ORONO <br />ORONO, MN <br />JEB CJS <br />ETL <br />PRELIMINARY 04/22/2020 <br />20658.03 <br />Registration No.Date: <br />I hereby certify that this plan, specification or <br />report was prepared by me or under my direct <br />supervision and that I am a duly licensed <br />professional ENGINEER under the laws of the state <br />of Minnesota. <br />If applicable, contact us for a wet signed copy of this <br />plan which is available upon request at Sambatek's, <br />Minnetonka, MN office. <br />04/22/202050475 <br />Eric T. Luth <br />04/22/20 City Submittal <br />05/01/20 MCWD Submittal <br />05/04/20 City Resubmittal <br />07/22/20 City Resubmittal <br />ALL MEASURES STATED ON THIS EROSION AND SEDIMENT CONTROL PLAN, AND IN THE STORM WATER POLLUTION PREVENTION PLAN SHALL BE MAINTAINED IN FULLY FUNCTIONAL CONDITION UNTIL NO <br />LONGER REQUIRED FOR A COMPLETED PHASE OF WORK OR FINAL STABILIZATION OF THE SITE. THE DESIGNATED CONTACT PERSON NOTED ON THIS PLAN MUST ROUTINELY INSPECT THE CONSTRUCTION <br />ON SITE ONCE EVERY SEVEN DAYS DURING ACTIVE CONSTRUCTION AND WITHIN 24 HOURS AFTER A RAINFALL EVENT GREATER THAN 0.5 INCHES IN 24 HOURS. ALL EROSION AND SEDIMENTATION <br />CONTROL MEASURES SHALL BE CLEANED AND REPAIRED IN ACCORDANCE WITH THE FOLLOWING: <br />1.ALL SILT FENCES MUST BE REPAIRED, REPLACED, OR SUPPLEMENTED WHEN THEY BECOME NONFUNCTIONAL OR THE SEDIMENT REACHES 1/2 OF THE HEIGHT OF THE FENCE. THESE REPAIRS MUST BE <br />MADE WITHIN 24 HOURS OF DISCOVERY, OR AS SOON AS FIELD CONDITIONS ALLOW ACCESS. <br />2.TEMPORARY AND PERMANENT SEDIMENTATION BASINS MUST BE DRAINED AND THE SEDIMENT REMOVED WHEN THE DEPTH OF SEDIMENT COLLECTED IN THE BASIN REACHES 1/2 THE STORAGE <br />VOLUME. DRAINAGE AND REMOVAL MUST BE COMPLETED WITHIN 72 HOURS OF DISCOVERY, OR AS SOON AS FIELD CONDITIONS ALLOW ACCESS (SEE PART 10.1-10.5 OF THE GENERAL PERMIT). <br />3.SURFACE WATERS, INCLUDING DRAINAGE DITCHES AND CONVEYANCE SYSTEMS, MUST BE INSPECTED FOR EVIDENCE OF SEDIMENT BEING DEPOSITED BY EROSION. CONTRACTOR MUST REMOVE ALL <br />DELTAS AND SEDIMENT DEPOSITED IN SURFACE WATERS, INCLUDING DRAINAGE WAYS, CATCH BASINS, AND OTHER DRAINAGE SYSTEMS, AND RESTABILIZE THE AREAS WHERE SEDIMENT REMOVAL <br />RESULTS IN EXPOSED SOIL. THE REMOVAL AND STABILIZATION MUST TAKE PLACE WITHIN SEVEN (7) DAYS OF DISCOVERY UNLESS PRECLUDED BY LEGAL, REGULATORY, OR PHYSICAL ACCESS <br />CONSTRAINTS. CONTRACTOR SHALL USE ALL REASONABLE EFFORTS TO OBTAIN ACCESS. IF PRECLUDED, REMOVAL AND STABILIZATION MUST TAKE PLACE WITHIN SEVEN (7) CALENDAR DAYS OF <br />OBTAINING ACCESS. CONTRACTOR IS RESPONSIBLE FOR CONTACTING ALL LOCAL, REGIONAL, STATE AND FEDERAL AUTHORITIES AND RECEIVING ANY APPLICABLE PERMITS, PRIOR TO CONDUCTING <br />ANY WORK. <br />4.CONSTRUCTION SITE VEHICLE EXIT LOCATIONS MUST BE INSPECTED FOR EVIDENCE OF OFF-SITE SEDIMENT TRACKING ONTO PAVED SURFACES. TRACKED SEDIMENT MUST BE REMOVED FROM ALL <br />OFF-SITE PAVED SURFACES, WITHIN 24 HOURS OF DISCOVERY, OR IF APPLICABLE, WITHIN A SHORTER TIME TO COMPLY WITH PART 9.11-9.12 OF THE GENERAL PERMIT. <br />5.CONTRACTOR IS RESPONSIBLE FOR THE OPERATION AND MAINTENANCE OF TEMPORARY AND PERMANENT WATER QUALITY MANAGEMENT BMPS, AS WELL AS ALL EROSION PREVENTION AND <br />SEDIMENT CONTROL BMPS, FOR THE DURATION OF THE CONSTRUCTION WORK AT THE SITE. THE PERMITTEE(S) ARE RESPONSIBLE UNTIL ANOTHER PERMITTEE HAS ASSUMED CONTROL (ACCORDING <br />TO PART 3.1 TO 3.8 OF THE MPCA GENERAL PERMIT) OVER ALL AREAS OF THE SITE THAT HAVE NOT BEEN FINALLY STABILIZED OR THE SITE HAS UNDERGONE FINAL STABILIZATION, AND A (N.O.T.) <br />HAS BEEN SUBMITTED TO THE MPCA. <br />6.IF SEDIMENT ESCAPES THE CONSTRUCTION SITE, OFF-SITE ACCUMULATIONS OF SEDIMENT MUST BE REMOVED IN A MANNER AND AT A FREQUENCY SUFFICIENT TO MINIMIZE OFF-SITE IMPACTS <br />(E.G., FUGITIVE SEDIMENT IN STREETS COULD BE WASHED INTO STORM SEWERS BY THE NEXT RAIN AND/OR POSE A SAFETY HAZARD TO USERS OF PUBLIC STREETS). <br />7.ALL INFILTRATION AREAS MUST BE INSPECTED TO ENSURE THAT NO SEDIMENT FROM ONGOING CONSTRUCTION ACTIVITIES IS REACHING THE INFILTRATION AREA AND THESE AREAS ARE PROTECTED <br />FROM COMPACTION DUE TO CONSTRUCTION EQUIPMENT DRIVING ACROSS THE INFILTRATION AREA. <br />1.CONSTRUCTION SHALL COMPLY WITH ALL APPLICABLE GOVERNING CODES AND BE CONSTRUCTED TO SAME. WHERE A CONFLICT EXISTS BETWEEN LOCAL JURISDICTIONAL STANDARD SPECIFICATIONS <br />AND SAMBATEK STANDARD SPECIFICATIONS, THE MORE STRINGENT SPECIFICATION SHALL APPLY. <br />2.THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) IS COMPRISED OF THIS DRAWING (EROSION & SEDIMENTATION CONTROL PLAN-ESC PLAN), THE STANDARD DETAILS, THE PLAN <br />NARRATIVE, AND ITS APPENDICES, PLUS THE PERMIT AND ALL SUBSEQUENT REPORTS AND RELATED DOCUMENTS. <br />3.CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETING & SUBMITTING THE APPLICATION FOR THE MPCA GENERAL STORMWATER PERMIT FOR CONSTRUCTION ACTIVITY. ALL CONTRACTORS AND <br />SUBCONTRACTORS INVOLVED WITH STORM WATER POLLUTION PREVENTION SHALL OBTAIN A COPY OF THE SWPPP AND THE STATE OF MINNESOTA NATIONAL POLLUTANT DISCHARGE ELIMINATION <br />SYSTEM GENERAL PERMIT (NPDES PERMIT, ISSUED AUGUST 1, 2018) AND BECOME FAMILIAR WITH THE CONTENTS. THE SWPPP AND ALL OTHER RELATED DOCUMENTS MUST BE KEPT AT THE SITE <br />DURING CONSTRUCTION. <br />4.CONTRACTOR SHALL IMPLEMENT BEST MANAGEMENT PRACTICES (BMP'S) AS REQUIRED BY THE SWPPP & PERMITS. CONTRACTOR SHALL OVERSEE THE INSPECTION & MAINTENANCE OF THE BMP'S <br />AND EROSION PREVENTION FROM BEGINNING OF CONSTRUCTION AND UNTIL CONSTRUCTION IS COMPLETED, IS APPROVED BY ALL AUTHORITIES, AND THE NOTICE OF TERMINATION (NOT) HAS BEEN <br />FILED WITH THE MPCA BY EITHER THE OWNER OR OPERATOR AS APPROVED ON PERMIT. ADDITIONAL BMP'S SHALL BE IMPLEMENTED AS DICTATED BY CONDITIONS AT NO ADDITIONAL COST TO <br />OWNER THROUGHOUT ALL PHASES OF CONSTRUCTION. <br />5.CONTRACTOR SHALL COMPLY WITH TRAINING REQUIREMENTS IN PART 21.1-21.3 OF THE GENERAL PERMIT. <br />6.BMP'S AND CONTROLS SHALL CONFORM TO FEDERAL, STATE, OR LOCAL REQUIREMENTS OR MANUAL OF PRACTICE, AS APPLICABLE. CONTRACTOR SHALL IMPLEMENT ADDITIONAL CONTROLS AS <br />DIRECTED BY PERMITTING AGENCY OR OWNER. <br />7.ESC PLAN MUST CLEARLY DELINEATE ALL STATE WATERS. PERMITS FOR ANY CONSTRUCTION ACTIVITY IMPACTING STATE WATERS OR REGULATED WETLANDS MUST BE MAINTAINED ON SITE AT ALL <br />TIMES. <br />8.CONTRACTOR SHALL MINIMIZE CLEARING TO THE MAXIMUM EXTENT PRACTICAL OR AS REQUIRED BY THE GENERAL PERMIT. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THE ESC PLANS <br />SHALL BE CLEARLY DELINEATED (E.G. WITH FLAGS, STAKES, SIGNS, SILT FENCE, ETC.) ON THE DEVELOPMENT SITE BEFORE WORK BEGINS. GROUND DISTURBING ACTIVITIES MUST NOT OCCUR OUTSIDE <br />THE LIMITS OF DISTURBANCE. <br />9.GENERAL CONTRACTOR SHALL DENOTE ON PLAN THE TEMPORARY PARKING AND STORAGE AREA WHICH SHALL ALSO BE USED AS THE EQUIPMENT MAINTENANCE AND CLEANING AREA, EMPLOYEE <br />PARKING AREA, AND AREA FOR LOCATING PORTABLE FACILITIES, OFFICE TRAILERS, AND TOILET FACILITIES. <br />10.ALL WASH WATER (CONCRETE TRUCKS, VEHICLE CLEANING, EQUIPMENT CLEANING, ETC.) MUST BE LIMITED TO A DEFINED AREA OF THE SITE AND SHALL BE CONTAINED AND PROPERLY TREATED OR <br />DISPOSED. NO ENGINE DEGREASING IS ALLOWED ON SITE. <br />11.ALL LIQUID AND SOLID WASTES GENERATED BY CONCRETE WASHOUT OPERATIONS MUST BE CONTAINED IN A LEAK-PROOF CONTAINMENT FACILITY OR IMPERMEABLE LINER. A COMPACTED CLAY <br />LINER IS NOT ACCEPTABLE. THE LIQUID AND SOLID WASTES MUST NOT CONTACT THE GROUND, AND THERE MUST NOT BE RUNOFF FROM THE CONCRETE WASHOUT OPERATIONS OR AREAS. LIQUID <br />AND SOLID WASTES MUST BE DISPOSED OF PROPERLY AND IN COMPLIANCE WITH MPCA REGULATIONS. A SIGN MUST BE INSTALLED ADJACENT TO EACH WASHOUT FACILITY TO INFORM CONCRETE <br />EQUIPMENT OPERATORS TO UTILIZE THE PROPER FACILITIES. SELF-CONTAINED CONCRETE WASHOUTS ON CONCRETE DELIVERY TRUCKS ARE ALLOWED. <br />12.SUFFICIENT OIL AND GREASE ABSORBING MATERIALS AND FLOTATION BOOMS SHALL BE MAINTAINED ON SITE OR READILY AVAILABLE TO CONTAIN AND CLEAN-UP FUEL OR CHEMICAL SPILLS AND <br />LEAKS. <br />13.DUST ON THE SITE SHALL BE CONTROLLED. THE USE OF MOTOR OILS AND OTHER PETROLEUM BASED OR TOXIC LIQUIDS FOR DUST SUPPRESSION OPERATIONS IS PROHIBITED. <br />14.SOLID WASTE: COLLECTED SEDIMENT, ASPHALT & CONCRETE MILLINGS, FLOATING DEBRIS, PAPER, PLASTIC, FABRIC, CONSTRUCTION & DEMOLITION DEBRIS & OTHER WASTES MUST BE DISPOSED OF <br />PROPERLY & MUST COMPLY WITH MPCA DISPOSAL REQUIREMENTS. <br />15.HAZARDOUS MATERIALS: OIL, GASOLINE, PAINT & ANY HAZARDOUS SUBSTANCES MUST BE PROPERLY STORED, INCLUDING SECONDARY CONTAINMENT, TO PREVENT SPILLS, LEAKS OR OTHER <br />DISCHARGE. RESTRICTED ACCESS TO STORAGE AREAS MUST BE PROVIDED TO PREVENT VANDALISM. STORAGE & DISPOSAL OF HAZARDOUS WASTE MUST BE IN COMPLIANCE WITH MPCA <br />REGULATIONS. <br />16.ALL STORM WATER POLLUTION PREVENTION MEASURES PRESENTED ON THIS PLAN, AND IN THE SWPPP, SHALL BE INITIATED AS SOON AS PRACTICABLE AND PRIOR TO SOIL DISTURBING ACTIVITIES <br />UPSLOPE. <br />17.DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY HAS STOPPED SHALL BE TEMPORARILY SEEDED, WITHIN 7 DAYS OF INACTIVITY. SEEDING SHALL BE IN ACCORDANCE WITH <br />MN/DOT SEED MIXTURE NUMBER 21-111 OR 21-112 DEPENDING ON THE SEASON OF PLANTING ( SEE MN/DOT SPECIFICATION SECTION 2575.3) SEEDING METHOD AND APPLICATION RATE SHALL <br />CONFORM TO MN/DOT SPECIFICATION SECTION 2575.3. TEMPORARY MULCH SHALL BE APPLIED IN ACCORDANCE WITH MN/DOT SPECIFICATION SECTION 2575.3F1 AND 2575.3G. ALTERNATIVELY, <br />HYDRAULIC SOIL STABILIZER IN ACCORDANCE WITH MN/DOT SPECIFICATION SECTION 2575.3H MAY BE USED IN PLACE OF TEMPORARY MULCH. <br />18.DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY HAS PERMANENTLY STOPPED SHALL BE PERMANENTLY STABILIZED. THESE AREAS SHALL BE STABILIZED IN ACCORDANCE WITH <br />THE TIME TABLE DESCRIBED ABOVE. REFER TO THE GRADING PLAN AND/OR LANDSCAPE PLAN FOR VEGETATIVE COVER. <br />19.CONTRACTORS OR SUBCONTRACTORS WILL BE RESPONSIBLE FOR REMOVING SEDIMENT FROM CONVEYANCES & FROM TEMPORARY SEDIMENTATION BASINS THAT ARE TO BE USED AS PERMANENT <br />WATER QUALITY MANAGEMENT BASINS. SEDIMENT MUST BE STABILIZED TO PREVENT IT FROM BEING WASHED BACK INTO THE BASIN, CONVEYANCES, OR DRAINAGEWAYS DISCHARGING OFF-SITE OR <br />TO SURFACE WATERS. THE CLEANOUT OF PERMANENT BASINS MUST BE SUFFICIENT TO RETURN THE BASIN TO DESIGN CAPACITY. <br />20.ON-SITE & OFF-SITE SOIL STOCKPILE AND BORROW AREAS SHALL BE PROTECTED FROM EROSION AND SEDIMENTATION THROUGH IMPLEMENTATION OF BMP'S. STOCKPILE AND BORROW AREA <br />LOCATIONS SHALL BE NOTED ON THE SITE MAP AND PERMITTED IN ACCORDANCE WITH GENERAL PERMIT REQUIREMENTS. <br />21.TEMPORARY SOIL STOCKPILES MUST HAVE SILT FENCE OR OTHER EFFECTIVE SEDIMENT CONTROLS & CANNOT BE PLACED IN SURFACE WATERS, INCLUDING STORMWATER CONVEYANCES SUCH AS <br />CURB & GUTTER SYSTEMS OR CONDUITS & DITCHES. <br />22.SLOPES SHALL BE LEFT IN A ROUGHENED CONDITION DURING THE GRADING PHASE TO REDUCE RUNOFF VELOCITIES AND EROSION. <br />23.DUE TO THE GRADE CHANGES DURING THE DEVELOPMENT OF THE PROJECT, CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING THE EROSION CONTROL MEASURES (SILT FENCES, CHECK DAMS, <br />INLET PROTECTION DEVICES, ETC.) TO PREVENT EROSION. <br />24.ALL CONSTRUCTION SHALL BE STABILIZED AT THE END OF EACH WORKING DAY, THIS INCLUDES BACKFILLING OF TRENCHES FOR UTILITY CONSTRUCTION AND PLACEMENT OF GRAVEL OR BITUMINOUS <br />PAVING FOR ROAD CONSTRUCTION. <br />DEVELOPER/OWNER: <br />XXXXXXX <br />XXXXXXX <br />XXXXXXXX <br />XXX-XXX-XXXX <br />SITE OPERATOR / GENERAL CONTRACTOR <br />SUPERINTENDENT: <br />CROSS BRACE <br />MI <br />N <br />. <br />15 <br />" <br />18 <br />" <br />MA <br />X <br />. <br />2" X 4" STAKE <br />3' <br /> <br />M <br />I <br />N <br />. <br />DROP INLET <br />WITH GRATE <br />2" X 4" WOOD <br />(TYP.) <br />5' MIN. <br />SECURELY FASTEN OVERLAPPING <br />ENDS OF SILT FENCE MATERIAL <br />TO ADJACENT STAKES WITH <br />THREE WIRE TIES OR OTHER <br />FASTENERS <br />ATTACH THE WOVEN WIRE <br />FENCE TO EACH POST WITH <br />THREE WIRE TIES OR OTHER <br />FASTENERS (SEE NOTE 1) <br />1. ATTACH THE WOVEN WIRE FENCE TO EACH POST AND THE GEOTEXTILE TO THE WOVEN WIRE FENCE <br />(SPACED EVERY 30") WITH THREE WIRE TIES OR OTHER FASTENERS, ALL SPACED WITHIN THE TOP 8" OF <br />THE FABRIC. ATTACH EACH TIE DIAGONALLY 45 DEGREES THROUGH THE FABRIC, WITH EACH PUNCTURE <br />AT LEAST 1" VERTICALLY APART. <br />2. WHEN TWO SECTIONS OF SILT FENCE MATERIAL ADJOIN EACH OTHER, THEY SHALL BE OVERLAPPED <br />ACROSS TWO POSTS. <br />3. MAINTENANCE SHALL BE PERFORMED AS NOTED IN THE SWPPP. DEPTH OF ACCUMULATED SEDIMENTS <br />MAY NOT EXCEED ONE-HALF THE HEIGHT OF THE FABRIC. MAINTENANCE CLEANOUT MUST BE <br />CONDUCTED REGULARLY TO PREVENT ACCUMULATED SEDIMENTS FROM REACHING ONE-HALF THE <br />HEIGHT OF THE SILT FENCE MATERIAL ABOVE GRADE. <br />4. ALL SILT FENCE INLETS SHALL INCLUDE WIRE SUPPORT. <br />OVERLAP <br />5' MIN. <br />SILT FENCE MATERIAL TO BE <br />FASTENED SECURELY TO WOVEN <br />WIRE FENCE WITH THREE TIES <br />SPACED AT 30" ON CENTER (SEE <br />NOTE 1) <br />DEFLECTOR PLATE <br />OVERFLOW 2 - TOP OF CURB BOX <br />OVERFLOW 1 - CENTER OF FILTER ASSEMBLY <br />10" FILTER ASSEMBLY <br />CURB <br />CG 3067 <br />HIGH-FLOW FABRIC <br />MIRAFI FF101 <br />ROAD DRAIN CASTING APPLICABILTY <br />·NEENAH R-3067 <br />·NEENAH R-3512 <br />NOT TO SCALE <br />8' X 8' MIN OR AS <br />REQUIRED TO <br />CONTAIN WASTE <br />CONCRETE <br />SIGN TO INDICATE THE LOCATION OF <br />THE CONCRETE WASHOUT AREA <br />2'-0" MIN <br />BERM AROUND PERIMETER <br />GROUND SURFACE <br />12" MIN <br />12" MIN <br />COMPACTED <br />EMBANKMENT <br />MATERIAL (TYP.)3:1 OR FLATTER <br />SIDE SLOPES <br />NOTES: <br />1.CONCRETE WASHOUT AREA SHALL BE INSTALLED PRIOR TO ANY CONCRETE PLACEMENT <br />ON SITE. <br />2.CONCRETE WASHOUT AREA SHALL BE LINED WITH MINIMUM 10 MIL THICK PLASTIC <br />LINER. <br />3.VEHICLE TRACKING CONTROL IS REQUIRED IF ACCESS TO CONCRETE WASHOUT AREA IS <br />OFF PAVEMENT. <br />4.SIGNS SHALL BE PLACED AT THE CONSTRUCTION ENTRANCE, AT THE WASHOUT AREA, <br />AND ELSEWHERE AS NECESSARY TO CLEARLY INDICATE THE LOCATION OF THE <br />CONCRETE WASHOUT AREA TO OPERATORS OF CONCRETE TRUCKS AND PUMP RIGS. <br />5.THE CONCRETE WASHOUT AREA SHALL BE REPAIRED AND ENLARGED OR CLEANED OUT <br />AS NECESSARY TO MAINTAIN CAPACITY FOR WASTED CONCRETE. <br />6.AT THE END OF CONSTRUCTION, ALL CONCRETE SHALL BE REMOVED FROM THE SITE <br />AND DISPOSED OF AT AN ACCEPTED WASTE SITE. <br />7.WHEN THE CONCRETE WASHOUT AREA IS REMOVED, THE DISTURBED AREA SHALL BE <br />SEEDED AND MULCHED OR OTHERWISE STABILIZED IN A MANNER ACCEPTED BY THE <br />CITY. <br />WOVEN WIRE <br />FENCE WITH SILT <br />FENCE MATERIAL <br />COVER <br />EXTEND WIRE FENCE <br />A MIN. OF 3" INTO <br />GROUND <br />EXTEND SILT FENCE <br />MATERIAL A MIN. OF <br />1'-0" INTO GROUND <br />EROSION & SEDIMENTATION CONTROL NOTES & DETAILS / "SITE MAP" <br />SITE LOCATION MAP <br />NOT TO SCALE <br />USGS MAP <br />GENERAL EROSION NOTES: <br />NOT TO SCALE <br />CONCRETE WASHOUT AREA <br />ROAD DRAIN INLET PROTECTION (IP-2)SILT FENCE INLET PROTECTION (IP-1) <br />NOT TO SCALE <br />POSTS: 2 X 4 WOODEN STAKE FENCE: <br />WOVEN WIRE, 14-1/2 GA., 6" MAX. MESH <br />OPENING FABRIC: IN ACCORDANCE WITH <br />ASTM D 6461 LATEST EDITION. <br />NOT TO SCALE <br />PHASE I: <br />1.INSTALL STABILIZED CONSTRUCTION ENTRANCES. <br />2.PREPARE TEMPORARY PARKING AND STORAGE AREA. <br />3.CONSTRUCT THE SILT FENCES ON THE SITE. <br />4. INSTALL INLET PROTECTION DEVICES ON EXISTING STORM STRUCTURES, AS SHOWN ON THE PLAN. <br />5.CONSTRUCT THE SEDIMENTATION AND SEDIMENT TRAP BASINS, AS REQUIRED. <br />6. HALT ALL ACTIVITIES AND CONTACT THE CIVIL ENGINEERING CONSULTANT TO PERFORM INSPECTION OF BMPs. <br />GENERAL CONTRACTOR SHALL SCHEDULE AND CONDUCT STORM WATER PRE-CONSTRUCTION MEETING WITH <br />ENGINEER AND ALL GROUND DISTURBING CONTRACTORS BEFORE PROCEEDING WITH CONSTRUCTION. <br />7. CLEAR AND GRUB THE SITE. <br />8. BEGIN GRADING THE SITE. <br />9. START CONSTRUCTION OF BUILDING PAD AND STRUCTURES. <br />PHASE II: <br />1.TEMPORARILY SEED DENUDED AREAS. <br />2.INSTALL UTILITIES, UNDERDRAINS, STORM SEWERS, CURBS AND GUTTERS. <br />3.INSTALL RIP RAP AROUND OUTLET STRUCTURES. <br />4.INSTALL INLET PROTECTION AROUND ALL STORM SEWER STRUCTURES. <br />5.PREPARE SITE FOR PAVING. <br />6.PAVE SITE. <br />7.INSTALL INLET PROTECTION DEVICES. <br />8.COMPLETE GRADING AND INSTALL PERMANENT SEEDING AND PLANTING. <br />9.REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES (ONLY IF SITE IS STABILIZED), IF <br />REQUIRED BY THE CONTRACT <br />AREA SUMMARY IN ACRES <br />PAVEMENT AREA 0.0 AC± <br />BUILDING AREA 0.0 AC± <br />SEEDED AREA 0.0 AC± <br />TOTAL DISTURBED 0.0 AC± <br />PRE - CONSTRUCTION IMPERVIOUS 0.0 AC± <br />POST - CONSTRUCTION IMPERVIOUS 0.0 AC± <br />SEQUENCE OF CONSTRUCTIONFRAME <br />MAINTENANCE NOTES: <br />FOR USE ONLY IN PAVED AREAS WHERE SEDIMENT LOADS ARE EXPECTED TO BE <br />VERY LOW. FILTER SACK MUST HAVE OVERFLOW HOLES TO PREVENT PONDING. <br />N.T.S. <br />INLET PROTECTION FILTER SACK (IP-3) <br />PUB <br />L <br />I <br />C <br /> <br />R <br />O <br />A <br />D <br />HAR <br />D <br /> <br />S <br />U <br />R <br />F <br />A <br />C <br />E <br />MI <br />N <br /> <br />0 <br />. <br />5 <br />% <br /> <br />G <br />R <br />A <br />D <br />E <br />20' <br />M <br />I <br />N <br />I <br />M <br />U <br />M <br />50' <br /> <br />M <br />I <br />N <br />I <br />M <br />U <br />M <br />MINIMUM 0.5% <br />GRADE DOWN <br />FROM PUBLIC <br />STREET <br />GEOTEXTILE <br />UNDERLINER <br />4"- 6" DIAMETER <br />CLEAN STONE <br />10" MINIMUM <br />N.T.S. <br />TEMPORARY STONE <br />CONSTRUCTION EXIT <br />GEOTEXTILE BAG <br />OVERFLOW HOLES <br />LOOPS SIZED FOR 1" REBAR. <br />USE REBAR FOR A HANDLE TO <br />EMPTY FILTER SACK AT A <br />SEDIMENT COLLECTION <br />LOCATION. <br />LOOPS SIZED FOR <br />RECTANGULAR BAR 2"X1/4". <br />LIFT FILTER BAG FROM INLET <br />USING RECTANGULAR BAR FOR <br />HANDLES. <br />2"X2"X3/4" RUBBER <br />BLOCK (TYP) <br />(FILTER SACK INSTALLED) <br />FRAME TO HOLD <br />FILTER BAG IN PLACE <br />1/4" BRIGHTLY <br />COLORED NYLON <br />ROPE EXPANSION <br />RESTRAINT <br />ISOMETRIC VIEW <br />SECTION VIEW <br />SECURE RECTANGULAR <br />BAR TO OR UNDER <br />SURROUNDING SURFACE. <br />1/4" BRIGHTLY COLORED <br />NYLON ROPE EXPANSION <br />RESTRAINT <br />FINISH <br />GRADE <br />NOTES: <br />1.GEOTEXTILE SHALL BE A WOVEN POLYPROPYLENE FABRIC THAT MEETS OR EXCEEDS <br />REQUIREMENTS IN THE SPECIFICATIONS TABLE. <br />2.PLACE AN OIL ABSORBENT PAD OR PILLOW OVER INLET GRATE WHEN OIL SPILLS ARE A <br />CONCERN. <br />3.THE WIDTH, "W", OF THE FILTER SACK SHALL MATCH THE INSIDE WIDTH OF THE GRATED <br />INLET BOX. <br />4.THE DEPTH, "D", OF THE FILTER SACK SHALL BE BETWEEN 18 INCHES AND 36 INCHES. <br />5.THE LENGTH, "L", OF THE FILTER SACK SHALL MATCH THE INSIDE LENGTH OF THE <br />GRATED INLET BOX. <br />D <br />H <br />MAINTENANCE NOTES: <br />1.INLET PROTECTION DEVICES MUST BE INSPECTED FOR SEDIMENT ACCUMULATION <br />WITHIN THE CATCH BASIN. REMOVE TRAPPED SEDIMENT WHEN BRIGHTLY COLORED <br />EXPANSION RESTRAINT CAN NO LONGER BE SEEN. <br />2.REMOVAL OF SEDIMENT ACCUMULATED IN OR ADJACENT TO A STORM DRAIN INLET <br />MUST BEGIN IMMEDIATELY UPON DISCOVERY, WITH COMPLETION OF THE ACTIVITY <br />OCCURRING NO LATER THAN THE END OF THE FOLLOWING BUSINESS DAY. <br />3.INLET PROTECTION DEVICES SHALL BE INSPECTED FOR UNINTENDED BYPASS OR <br />IMPROPER FLOW-RATES THAT MAY CAUSE DOWNSTREAM FLOODING. <br />4.CONTACT THE CEC FOR ALTERNATE INLET PROTECTION IF THE DESIGNED PROTECTION <br />MAY IMPACT DOWNSTREAM BMPS, ADJACENT SLOPES, ETC., DUE TO PONDING ISSUES. <br />ENSURE THAT NO UNDERMINING OF INLET PROTECTION DEVICES HAS OCCURRED. <br />5.INLET PROTECTION DEVICES AND BARRIERS SHALL BE REPAIRED OR REPLACED IF THEY <br />SHOW SIGNS OF UNDERMINING OR DETERIORATION. <br />INLET GRATE <br />SITE <br />12 <br />LUCE L <br />I <br />N <br />E <br /> <br />S <br />T <br />A <br />T <br />E <br /> <br />T <br />R <br />A <br />I <br />L <br />O <br />R <br />O <br />N <br />O <br /> <br />O <br />R <br />C <br />H <br />A <br />R <br />D <br /> <br />R <br />D <br />SITE