Jul 22, 2020 - 11:36am - User:Csyverson L:\PROJECTS\20658.03\CAD\Civil\Sheets\20658.03-C5-EROS.dwg
<br />C5.05
<br />SWPPP
<br />NARRATIVE
<br />Project
<br />Location
<br />Date Submittal / RevisionNo.
<br />Certification
<br />Sheet Title
<br />Summary
<br />Revision History
<br />Sheet No.Revision
<br />Project No.
<br />By
<br />Designed:Drawn:
<br />Approved:Book / Page:
<br />Phase:Initial Issue:
<br />Client
<br />GORDON
<br />JAMES
<br />CONSTRUCTION
<br />5159 MAIN STREET SUITE 200
<br />MAPLE PLAIN, MN 55359
<br />ORCHARD HILL
<br />OF ORONO
<br />ORONO, MN
<br />JEB CJS
<br />ETL
<br />PRELIMINARY 04/22/2020
<br />20658.03
<br />Registration No.Date:
<br />I hereby certify that this plan, specification or
<br />report was prepared by me or under my direct
<br />supervision and that I am a duly licensed
<br />professional ENGINEER under the laws of the state
<br />of Minnesota.
<br />If applicable, contact us for a wet signed copy of this
<br />plan which is available upon request at Sambatek's,
<br />Minnetonka, MN office.
<br />04/22/202050475
<br />Eric T. Luth
<br />04/22/20 City Submittal
<br />05/01/20 MCWD Submittal
<br />05/04/20 City Resubmittal
<br />07/22/20 City Resubmittal
<br />2.10 CONTROL STORMWATER DISCHARGE POINTS
<br />1.PIPE OR OTHER TEMPORARY OR PERMANENT OUTLETS MUST BE STABILIZED WITH
<br />TEMPORARY OR PERMANENT ENERGY DISSIPATION WITHIN 24 HOURS AFTER
<br />CONNECTION TO A SURFACE WATER.
<br />2.STABILIZE THE NORMAL WETTED PERIMETER OF A DRAINAGE DITCH OR SWALE WITHIN
<br />200 FEET OF THE PROPERTY EDGE WITHIN 24 HOURS OF CONNECTION TO A SURFACE
<br />WATER. THE REMAINDER OF THE DITCH MUST BE STABILIZED WITHIN 7 CALENDAR DAYS
<br />OF CONNECTION.
<br />BMP DESCRIPTION: RIPRAP
<br />INSTALLATION SCHEDULE: INSTALL RIPRAP AS SHOWN ON SWPPP PLANS AND/OR GRADING
<br />PLANS. INSTALLATION MUST BE COMPLETED WITHIN 24 HOURS OF CONNECTING TO A
<br />SURFACE WATER.
<br />MAINTENANCE AND INSPECTION REQUIREMENTS: INSPECT OUTLETS EVERY 7 DAYS OR
<br />WITHIN 24 HOURS AFTER A 0.5” 24-HOUR RAIN EVENT. REPAIR, REPLACE OR SUPPLEMENT
<br />NON-FUNCTIONING RIPRAP ENERGY DISSIPATION WITHIN 3 DAYS OR BY THE NEXT RAIN EVENT,
<br />WHICHEVER COMES FIRST. ANY OFF SITE ACCUMULATION OF SEDIMENT MUST BE REMOVED
<br />IN MANNER AND AT A FREQUENCY TO MINIMIZE OFF-SITE IMPACTS.
<br />RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE):
<br />2.11 CHEMICAL EROSION AND SEDIMENT CONTROL BMPS
<br />POLYMERS, FLOCCULANTS, OR OTHER SEDIMENTATION TREATMENT CHEMICALS MUST BE
<br />APPLIED AFTER CONVENTIONAL EROSION AND SEDIMENT CONTROL DEVICES ARE UTILIZED.
<br />CHEMICALS MAY ONLY BE APPLIED WHERE TREATED STORMWATER IS DIRECTED TO A
<br />SEDIMENT CONTROL SYSTEM WHICH ALLOWS FOR FILTRATION OR SETTLEMENT OF THE FLOC
<br />PRIOR TO DISCHARGE. CONSIDERATION MUST BE GIVEN WHEN SELECTING CHEMICALS TO THE
<br />EXPECTED SOIL TYPES TO BE EXPOSED DURING CONSTRUCTION, AND TO THE EXPECTED
<br />TURBIDITY, PH AND FLOW RATE OF STORMWATER FLOWING INTO THE CHEMICAL
<br />TREATMENT SYSTEM OR AREA. IF CHEMICALS ARE PART OF THE EROSION CONTROL PLAN,
<br />THEY MUST BE USED IN ACCORDANCE WITH ACCEPTED ENGINEERING PRACTICES, AND WITH
<br />DOSING SPECIFICATION AND SEDIMENT REMOVAL DESIGN SPECIFICATIONS PROVIDED BY THE
<br />MANUFACTURER OR PROVIDER/SUPPLIER OF THE APPLICABLE CHEMICALS.
<br />SECTION 3: DEWATERING & BASIN DRAINING
<br />3.1 DEWATERING AND BASIN DRAINING
<br />ALLOWABLE NON-STORMWATER DISCHARGES, AS DEFINED BY THE GENERAL PERMIT, ARE
<br />LIMITED TO DEWATERING AND BASIN DRAINING. DEWATERING OR BASIN DRAINING THAT
<br />MAY HAVE TURBID OR SEDIMENT LADEN DISCHARGE WATER MUST BE DISCHARGED TO A
<br />TEMPORARY OR PERMANENT SEDIMENTATION BASIN ON THE PROJECT SITE WHENEVER
<br />POSSIBLE. IF THE WATER CANNOT BE DISCHARGED TO A SEDIMENTATION BASIN PRIOR TO
<br />ENTERING THE SURFACE WATER, IT MUST BE TREATED WITH THE APPROPRIATE BMPS, SUCH
<br />THAT THE DISCHARGE DOES NOT ADVERSELY AFFECT THE RECEIVING WATER OR
<br />DOWNSTREAM LANDOWNERS. THE CONTRACTOR MUST ENSURE THAT DISCHARGE POINTS
<br />ARE ADEQUATELY PROTECTED FROM EROSION AND SCOUR. THE DISCHARGE MUST BE
<br />DISPERSED OVER NATURAL ROCK RIPRAP, SAND BAGS, PLASTIC SHEETING OR OTHER
<br />ACCEPTED ENERGY DISSIPATION MEASURES. ADEQUATE SEDIMENTATION CONTROL
<br />MEASURES ARE REQUIRED FOR DISCHARGE WATER THAT CONTAINS SUSPENDED SOLIDS. ALL
<br />WATER FROM DEWATERING OR BASIN DRAINING MUST BE DISCHARGED IN A MANNER THAT
<br />DOES NOT CAUSE NUISANCE CONDITIONS, EROSION IN RECEIVING CHANNELS OR ON
<br />DOWNSLOPE PROPERTIES, OR INUNDATION IN WETLANDS CAUSING SIGNIFICANT ADVERSE
<br />IMPACT TO THE WETLAND. IF THE CONTRACTOR ELECTS TO UTILIZE FILTERS WITH BACKWASH
<br />WATER, THE CONTRACTOR MUST HAUL THE BACKWASH WATER AWAY FOR DISPOSAL,
<br />RETURN THE BACKWATER TO THE BEGINNING OF THE TREATMENT PROCESS, OR
<br />INCORPORATE THE BACKWASH WATER INTO THE SITE IN A MANNER THAT DOES NOT CAUSE
<br />EROSION. THE CONTRACTOR MUST REPLACE AND CLEAN THE FILTER MEDIA USED IN
<br />DEWATERING DEVICES WHEN REQUIRED TO RETAIN ADEQUATE FUNCTION. CONTRACTOR
<br />SHALL OBTAIN A WATER USE (APPROPRIATION) PERMIT FROM THE MINNESOTA DNR FOR
<br />DEWATERING ACTIVITIES THAT WILL WITHDRAW MORE THAN 10,000 GALLONS OF WATER
<br />PER DAY OR 1 MILLION GALLONS PER YEAR.
<br />SECTION 4: GOOD HOUSEKEEPING BMPS
<br />4.1 MATERIAL HANDLING AND WASTE MANAGEMENT
<br />1.SOLID WASTE DISPOSAL - NO SOLID MATERIALS, INCLUDING CONSTRUCTION AND
<br />DEMOLITION MATERIALS, COLLECTED SEDIMENT, ASPHALT AND CONCRETE MILLINGS,
<br />SHALL BE ALLOWED TO BE CARRIED FROM THE SITE WITH STORM WATER. ALL SOLID
<br />WASTE, INCLUDING DISPOSABLE MATERIALS INCIDENTAL TO THE MAJOR CONSTRUCTION
<br />ACTIVITIES, MUST BE COLLECTED AND PLACED IN CONTAINERS. THE CONTAINERS WILL
<br />BE EMPTIED PERIODICALLY BY A CONTRACT TRASH DISPOSAL SERVICE AND HAULED
<br />AWAY FROM THE SITE. DISPOSAL OF SOLID WASTES MUST COMPLY WITH MPCA
<br />REQUIREMENTS.
<br />2.GROUNDWATER PROTECTION - SUBSTANCES THAT HAVE THE POTENTIAL FOR
<br />POLLUTING SURFACE AND/OR GROUNDWATER MUST BE CONTROLLED BY WHATEVER
<br />MEANS NECESSARY IN ORDER TO ENSURE THAT THEY DO NOT DISCHARGE FROM THE
<br />SITE. AS AN EXAMPLE, SPECIAL CARE MUST BE EXERCISED DURING EQUIPMENT FUELING
<br />AND SERVICING OPERATIONS. IF A SPILL OCCURS, IT MUST BE CONTAINED AND DISPOSED
<br />OF SO THAT IT WILL NOT FLOW FROM THE SITE OR ENTER GROUNDWATER, EVEN IF THIS
<br />REQUIRES REMOVAL, TREATMENT, AND DISPOSAL OF SOIL. IN THIS REGARD,
<br />POTENTIALLY POLLUTING SUBSTANCES SHOULD BE HANDLED IN A MANNER CONSISTENT
<br />WITH THE IMPACT THEY REPRESENT.
<br />3.SANITARY FACILITIES - ALL PERSONNEL INVOLVED WITH CONSTRUCTION ACTIVITIES
<br />MUST COMPLY WITH STATE AND LOCAL SANITARY SEPTIC SYSTEM REGULATIONS.
<br />PORTABLE TOILETS MUST BE POSITIONED SO THAT THEY ARE SECURE AND WILL NOT BE
<br />TIPPED OR KNOCKED OVER. TEMPORARY SANITARY FACILITIES WILL BE PROVIDED AT THE
<br />SITE THROUGHOUT THE CONSTRUCTION PHASE WHERE REQUIRED BY STATE OR LOCAL
<br />REGULATIONS. THEY MUST BE UTILIZED BY ALL CONSTRUCTION PERSONNEL AND BE
<br />SERVICED BY A COMMERCIAL OPERATOR.
<br />4.2 ESTABLISH PROPER STORAGE, HANDLING & DISPOSAL
<br />PRACTICES
<br />HAZARDOUS MATERIALS & TOXIC WASTE (INCLUDING OIL, DIESEL FUEL, GASOLINE,
<br />HYDRAULIC FLUIDS, PAINT SOLVENTS, PETROLEUM-BASED PRODUCTS, WOOD PRESERVATIVES,
<br />ADDITIVES, CURING COMPOUNDS, AND ACIDS) MUST BE STORED IN WATERPROOF
<br />CONTAINERS WITH SECONDARY CONTAINMENT, AND THEIR LOCATION(S) MUST BE NOTED ON
<br />THE SWPPP MAP. EXCEPT DURING APPLICATION, THE CONTENTS MUST BE KEPT IN TRUCKS OR
<br />WITHIN STORAGE FACILITIES IN ACCORDANCE WITH SECTION 12.4 OF THE GENERAL PERMIT.
<br />STORAGE AND DISPOSAL OF HAZARDOUS WASTE MUST BE IN COMPLIANCE WITH MCPA
<br />REGULATIONS. RUNOFF CONTAINING SUCH MATERIAL MUST BE COLLECTED, REMOVED FROM
<br />THE SITE, TREATED, AND DISPOSED AT AN APPROVED SOLID WASTE OR CHEMICAL DISPOSAL
<br />FACILITY.
<br />BUILDING PRODUCTS THAT HAVE THE POTENTIAL TO LEACH POLLUTANTS AND PESTICIDES,
<br />HERBICIDES, INSECTICIDES, FERTILIZERS, TREATMENT CHEMICALS AND LANDSCAPE MATERIALS
<br />MUST BE UNDER COVER BY PLASTIC SHEETING OR TEMPORARY ROOFS TO PREVENT
<br />DISCHARGE, OR PROTECTED BY SIMILAR EFFECTIVE MEANS TO PREVENT CONTACT WITH
<br />STORMWATER.
<br />4.3 DESIGNATE WASHOUT AREAS
<br />THE CONTRACTOR SHALL DESIGNATE AREAS FOR CONCRETE AND OTHER (STUCCO, PAINT, FOR
<br />RELEASE OILS, CURING COMPOUNDS AND OTHER CONSTRUCTION MATERIALS RELATED TO
<br />THE CONSTRUCTION ACTIVITY) WASHOUTS, AND NOTE THE LOCATIONS ON THE SITE MAP.
<br />ALL LIQUID AND SOLID WASTES GENERATED BY WASHOUT OPERATIONS MUST BE CONTAINED
<br />IN A LEAK PROOF CONTAINMENT FACILITY OR IMPERMEABLE LAYER. A COMPACTED CLAY
<br />LINER IS NOT AN ACCEPTABLE IMPERMEABLE LAYER. THE LIQUID AND SOLID WASTES MUST
<br />NOT CONTACT THE GROUND, AND THERE MUST NOT BE RUNOFF FROM THE WASHOUT
<br />OPERATIONS OR AREAS. LIQUID AND SOLID WASTE MUST BE DISPOSED OF PROPERLY AND IN
<br />COMPLIANCE WITH MPCA REGULATIONS. A SIGN MUST BE INSTALLED ADJACENT TO EACH
<br />WASHOUT FACILITY TO INFORM SITE WORKERS TO UTILIZE PROPER FACILITIES FOR DISPOSAL
<br />OF CONCRETE AND OTHER WASTES.
<br />BMP DESCRIPTION: CONCRETE WASHOUT
<br />INSTALLATION SCHEDULE: PRIOR TO CONCRETE WORK.
<br />MAINTENANCE AND INSPECTION REQUIREMENTS: INSPECT CONCRETE WASHOUTS FOR
<br />EVIDENCE OF DISCHARGE EVERY 7 DAYS OR WITHIN 24 HOURS AFTER A 0.5” 24-HOUR RAIN
<br />EVENT. REPAIR, REPLACE OR SUPPLEMENT NON-FUNCTIONING CONCRETE WASHOUTS
<br />WITHIN 3 DAYS OR BY THE NEXT USE, WHICHEVER COMES FIRST.
<br />RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE):
<br />4.4 ESTABLISH PROPER EQUIPMENT/VEHICLE FUELING AND
<br />MAINTENANCE PRACTICES
<br />THE CONTRACTOR SHALL DESIGNATE AREAS FOR EQUIPMENT FUELING, CLEANING,
<br />MAINTENANCE AND REPAIR, AND NOTE THE LOCATION(S) ON THE SWPPP SITE MAPS.
<br />RUNOFF MUST BE CONTAINED WITHIN THE DESIGNATED AREAS (I.E. THROUGH USE OF A
<br />TEMPORARY BERM). THE AREAS MUST NOT BE LOCATED IN ANY SURFACE WATER. SPECIAL
<br />CARE MUST BE EXERCISED DURING EQUIPMENT FUELING AND SERVICING OPERATIONS. IF A
<br />SPILL OCCURS, IT MUST BE CONTAINED AND DISPOSED OF SO THAT IT WILL NOT FLOW FROM
<br />THE SITE OR ENTER GROUNDWATER, EVEN IF THIS REQUIRES REMOVAL, TREATMENT, AND
<br />DISPOSAL OF SOIL. IT IS THE CONTRACTORS RESPONSIBILITY TO ENSURE THAT ADEQUATE
<br />SUPPLIES ARE AVAILABLE AT ALL TIMES TO CLEAN UP DISCHARGED MATERIALS AND THAT AN
<br />APPROPRIATE DISPOSAL METHOD IS AVAILABLE FOR RECOVERED SPILLED MATERIALS. NO
<br />ENGINE DEGREASING IS ALLOWED ON SITE.
<br />4.5 CONTROL EQUIPMENT/VEHICLE WASHING
<br />THE CONTRACTOR SHALL DESIGNATE LOCATION(S) FOR VEHICLE WASHING, AND NOTE THE
<br />LOCATION(S) ON THE SWPPP SITE MAP. RUNOFF FROM THE WASHING AREA MUST BE
<br />CONTAINED IN A SEDIMENT BASIN OR OTHER SIMILARLY EFFECTIVE CONTROLS AND WASTE
<br />FROM THE WASHING ACTIVITY MUST BE PROPERLY DISPOSED OF. THE CONTRACTOR MUST
<br />PROPERLY USE AND STORE SOAPS, DETERGENTS AND SOLVENTS. ENGINE DEGREASING OF
<br />TRUCKS AND OTHER CONSTRUCTION VEHICLES IS ALSO PROHIBITED.
<br />4.6 SPILL PREVENTION AND CONTROL PLAN
<br />1.ACCIDENTAL SPILL - DISCHARGE OF OIL OR OTHER HAZARDOUS SUBSTANCES IS SUBJECT
<br />TO REPORTING AND CLEAN UP REQUIREMENTS. IN CASE OF AN ACCIDENTAL SPILL, THE
<br />MINNESOTA POLLUTION CONTROL AGENCY IS TO BE NOTIFIED AT THEIR 24-HOUR
<br />TELEPHONE NUMBER: 651-649-5451. REFER TO SECTION 12 OF THE GENERAL PERMIT.
<br />2.GROUNDWATER PROTECTION - SUBSTANCES THAT HAVE THE POTENTIAL FOR POLLUTING
<br />SURFACE AND/OR GROUNDWATER MUST BE CONTROLLED BY WHATEVER MEANS
<br />NECESSARY IN ORDER TO ENSURE THAT THEY DO NOT DISCHARGE FROM THE SITE. AS AN
<br />EXAMPLE, SPECIAL CARE MUST BE EXERCISED DURING EQUIPMENT FUELING AND
<br />SERVICING OPERATIONS. IF A SPILL OCCURS, IT MUST BE CONTAINED AND DISPOSED OF SO
<br />THAT IT WILL NOT FLOW FROM THE SITE OR ENTER GROUNDWATER, EVEN IF THIS
<br />REQUIRES REMOVAL, TREATMENT, AND DISPOSAL OF SOIL. IN THIS REGARD, POTENTIALLY
<br />POLLUTING SUBSTANCES SHOULD BE HANDLED IN A MANNER CONSISTENT WITH THE
<br />IMPACT THEY REPRESENT.
<br />SECTION 5: POST-CONSTRUCTION BMPS
<br />BMP DESCRIPTION: INFILTRATION BASIN
<br />INSTALLATION SCHEDULE: AFTER SITE IS STABILIZED
<br />MAINTENANCE AND INSPECTION REQUIREMENTS: NO HEAVY EQUIPMENT TO BE PLACED IN
<br />THESE AREAS, MINIMIZING THE COMPACTION. PERIODIC CHECK OF FLOW CONDITIONS TO
<br />TRACK DRAWDOWN OF THE WATER IN THE BASIN.
<br />THE DEVICE WILL BE INSPECTED AND CLEARED OF SEDIMENT BUILD UP TWICE PER YEAR AND
<br />AS NEEDED. PLANTED VEGETATION ALSO NEEDS TO BE INSPECTED PERIODICALLY AND
<br />REPLACED AS NECESSARY. INSPECTION WILL ALSO INCLUDE CHECKING FOR ANY PROBLEMATIC
<br />EROSION TAKING PLACE ON THE SLOPES OF THE BASIN. EROSION ISSUES WILL BE REPAIRED AS
<br />THEY ARE FOUND.
<br />RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE):
<br />SECTION 6: INSPECTIONS
<br />6.1 INSPECTIONS
<br />1.INSPECTION FREQUENCY AND RESPONSIBILITY
<br />BETWEEN THE TIME THIS SWPPP IS IMPLEMENTED AND FINAL SITE STABILIZATION IS
<br />ACHIEVED AND THE NOTICE OF TERMINATION FILED WITH THE MPCA, ALL DISTURBED AREAS
<br />AND POLLUTANT CONTROLS MUST BE INSPECTED AT LEAST ONCE EVERY SEVEN CALENDAR
<br />DAYS AND WITHIN 24 HOURS FOLLOWING A RAINFALL OF 0.5 INCHES OR GREATER. THE
<br />PURPOSE OF SITE INSPECTIONS IS TO ASSESS PERFORMANCE OF POLLUTANT CONTROLS. THE
<br />INSPECTIONS WILL BE CONDUCTED BY THE CONTRACTOR'S DESIGNATED REPRESENTATIVE.
<br />BASED ON THESE INSPECTIONS, THE CONTRACTOR WILL DECIDE WHETHER IT IS NECESSARY
<br />TO MODIFY THIS SWPPP, ADD OR RELOCATE STRUCTURAL BMPS, OR WHATEVER ELSE MAY BE
<br />NEEDED IN ORDER TO PREVENT POLLUTANTS FROM LEAVING THE SITE VIA STORM WATER
<br />RUNOFF. IF THE SWPPP REQUIRES MODIFICATION, THOSE CHANGES TO THE SWPPP MUST BE
<br />DOCUMENTED. THE CONTRACTOR HAS THE DUTY TO CAUSE POLLUTANT CONTROL
<br />MEASURES TO BE REPAIRED, MODIFIED, MAINTAINED, SUPPLEMENTED, OR WHATEVER ELSE
<br />IS NECESSARY IN ORDER TO ACHIEVE EFFECTIVE POLLUTANT CONTROL.
<br />2. INSPECTION PROCEDURES - EXAMPLES OF PARTICULAR ITEMS TO EVALUATE DURING SITE
<br />INSPECTIONS ARE LISTED BELOW. THIS LIST IS NOT INTENDED TO BE COMPREHENSIVE.
<br />DURING EACH INSPECTION THE INSPECTOR MUST EVALUATE OVERALL POLLUTANT
<br />CONTROL SYSTEM PERFORMANCE AS WELL AS PARTICULAR DETAILS OF INDIVIDUAL
<br />SYSTEM COMPONENTS. ADDITIONAL FACTORS SHOULD BE CONSIDERED AS APPROPRIATE
<br />TO THE CIRCUMSTANCES.
<br />A. PRE-INSPECTION PREPARATION:
<br />1. INSPECTORS SHOULD BE FAMILIAR WITH THE SWPPP, INCLUDING THE EROSION AND
<br />SEDIMENT CONTROL PLANS, PAST INSPECTION REPORTS, AND MAINTENANCE LOGS.
<br />2. PAY SPECIAL ATTENTION TO STORM WATER DISCHARGE TO SPECIAL/IMPAIRED
<br />WATERS AND WETLANDS; DISCHARGES TO SPECIAL/IMPAIRED WATERS AND
<br />WETLANDS HAVE ADDITIONAL REQUIREMENTS THAT ARE DESCRIBED IN SECTION 23
<br />OF THE GENERAL PERMIT, AND ADDRESSED IN THIS SWPPP.
<br />B. SITE ENTRY:
<br />1. BEFORE ENTERING THE SITE, OBSERVE THE SURROUNDINGS AND VARIOUS STAGES
<br />OF CONSTRUCTION. NOTE AREAS FOR IN-DEPTH REVIEW AND ANY POTENTIAL
<br />ISSUES.
<br />2. THIS IS A GOOD TIME TO VIEW CONSTRUCTION SITE VEHICLE TRACKING PAD
<br />LOCATIONS AND PERIMETER CONTROLS.
<br />C. RECORDS REVIEW:
<br />1. VERIFY THAT A COPY OF THE SWPPP AND APPLICATION FOR THE NPDES STORM
<br />WATER PERMIT, AND COPIES OF ALL CONSTRUCTION SITE INSPECTIONS ARE ON
<br />SITE.
<br />2. VERIFY THAT THE TIMING FOR INSTALLATION OF ALL EROSION PREVENTION AND
<br />SEDIMENT CONTROL BMPS, AS WELL AS CONSTRUCTION PHASING, IS GENERALLY
<br />BEING FOLLOWED.
<br />3. SWPPPS ARE INTENDED TO BE DYNAMIC DOCUMENTS, VERIFY THAT AMENDMENTS
<br />OR CHANGES TO THE SWPPP ARE BEING MADE WHEN:
<br />A.A CHANGE IN DESIGN, CONSTRUCTION, OPERATION, MAINTENANCE, WEATHER
<br />OR SEASONAL CONDITIONS HAVE A SIGNIFICANT EFFECT ON STORM WATER
<br />DISCHARGES
<br />B. INSPECTIONS INDICATE THE SWPPP IS NOT EFFECTIVE
<br />C. THE SWPPP IS NOT CONSISTENT WITH THE TERMS OF THE GENERAL PERMIT
<br />D. SITE INSPECTION (NOTE TIMELINES FOR MAINTENANCE INCLUDED IN
<br />INSPECTION/MAINTENANCE REPORT)
<br />1. INSPECT DISCHARGE POINTS DOWNSTREAM AND OFF-SITE AREAS FOR SIGNS
<br />OF IMPACT.
<br />2. INSPECT PERIMETER CONTROLS:
<br />A. HAVE PERIMETER CONTROLS BEEN PROPERLY INSTALLED AND
<br />MAINTAINED?
<br />B. ARE VEHICLE TRACKING PADS FUNCTIONING PROPERLY? ARE
<br />ADDITIONAL ENTRANCES/EXITS BEING USED THAT ARE NOT STABILIZED?
<br />C. ALL STORM DRAINS MUST BE PROTECTED AND TEMPORARY STOCKPILES
<br />MUST HAVE SEDIMENT CONTROLS INSTALLED.
<br />D. ALL EXPOSED SOILS MUST HAVE TEMPORARY OR PERMANENT EROSION
<br />PROTECTION WITHIN 7 DAYS OF INACTIVITY.
<br />3. COMPARE BMPS IN THE SWPPP WITH CONSTRUCTION SITE CONDITIONS: ARE
<br />REQUIRED BMPS IN PLACE; ARE ADDITIONAL BMPS NEEDED; ARE BMPS IN
<br />PLACE PROPERLY INSTALLED AND MAINTAINED?
<br />4. INSPECT AREAS THAT HAVE BEEN DISTURBED AND ARE NOT CURRENTLY
<br />BEING WORKED. ANY UNSEEDED OR UNMULCHED BARE AREAS THAT HAVE
<br />BEEN IDLE FOR 7 DAYS SHOULD BE NOTED.
<br />5. INSPECT AREAS WITH FINAL STABILIZATION. IN ORDER FOR FINAL
<br />STABILIZATION TO BE ACHIEVED, AREAS MUST HAVE A UNIFORM COVER
<br />WITH A DENSITY OF 70% OVER ENTIRE AREA. TEMPORARY BMPS SHOULD BE
<br />REMOVED AND AREAS DISTURBED BY REMOVAL SEEDED AS NECESSARY.
<br />E. EXIT INTERVIEW:
<br />1. DEBRIEF THE PERSON IN CHARGE. EXPLAIN THE IDENTIFIED DEFICIENCIES
<br />AND ANY AREAS OF CONCERN.
<br />F. A COPY OF THE COMPLETED INSPECTION REPORT MUST BE KEPT WITH THE
<br />SWPPP ON SITE.
<br />THE INSPECTION REPORT USED SHOULD INCLUDE, AT A MINIMUM, THE
<br />FOLLOWING:
<br />·DATE & TIME OF INSPECTION
<br />·NAME OF INSPECTOR(S)
<br />·FINDINGS OF INSPECTIONS AND RECOMMENDATIONS FOR CORRECTIVE
<br />ACTIONS
<br />·CORRECTIVE ACTIONS TAKEN, INCLUDING DATES, TIMES AND NAMES OF
<br />PARTY COMPLETING MAINTENANCE
<br />·DATE & AMOUNT OF RAINFALL
<br />·RECORD OF ALL POINTS OF DISCHARGE FROM THE PROPERTY AND
<br />DESCRIPTION OF DISCHARGE
<br />·NOTE TO UPDATE THE SWPPP
<br />6.2 DELEGATION OF AUTHORITY
<br />DULY AUTHORIZED REPRESENTATIVE(S) OR POSITION(S):
<br /> COMPANY OR ORGANIZATION NAME:
<br /> NAME:
<br /> POSITION:
<br /> ADDRESS:
<br /> CITY, STATE, ZIP CODE:
<br /> TELEPHONE NUMBER:
<br /> FAX/EMAIL:
<br />6.3 CORRECTIVE ACTION LOG
<br />THE INSPECTION/MAINTENANCE FORM, AVAILABLE UPON REQUEST, INCORPORATES
<br />BOTH INSPECTION AND MAINTENANCE REPORTING INTO A SINGLE FORM. THIS FORM
<br />ALSO SPECIFIES THE TIME ALLOWED FOR CORRECTIONS TO BE PERFORMED. IF THE
<br />PARTY PERFORMING INSPECTIONS CHOOSES TO USE ANOTHER INSPECTION FORM, A
<br />SEPARATE CORRECTIVE ACTION LOG MUST BE PROVIDED.
<br />SECTION 7: RECORD KEEPING AND TRAINING
<br />7.1 RECORDKEEPING
<br />RECORD RETENTION - THE OWNER MUST KEEP THE SWPPP INCLUDING ALL CHANGES MADE
<br />TO IT DURING CONSTRUCTION (SEE SECTION 7.2 OF THIS SWPPP), ALONG WITH THE
<br />FOLLOWING ADDITIONAL RECORDS ON FILE FOR THREE YEARS AFTER COMPLETION OF THE
<br />CONSTRUCTION PROJECT (FINAL STABILIZATION AND NOTICE OF TERMINATION):
<br />1.ANY OTHER STORMWATER RELATED PERMITS REQUIRED FOR THE PROJECT
<br />2.RECORDS OF ALL INSPECTIONS AND MAINTENANCE CONDUCTED DURING CONSTRUCTION
<br />3.ALL PERMANENT OPERATION AND MAINTENANCE AGREEMENTS THAT HAVE BEEN
<br />IMPLEMENTED, INCLUDING ALL RIGHT OF WAY, CONTRACTS, COVENANTS AND OTHER
<br />BINDING REQUIREMENTS REGARDING PERPETUAL MAINTENANCE
<br />4.ALL REQUIRED CALCULATIONS FOR DESIGN OF THE TEMPORARY AND PERMANENT STORM
<br />WATER MANAGEMENT SYSTEMS
<br />7.2 AMENDMENTS
<br />THE CONTRACTOR SHALL KEEP A RECORD LOG OF ALL MODIFICATIONS TO THE SWPPP. AN
<br />EXAMPLE OF A SWPPP UPDATE LOG FORM CAN BE PROVIDED UPON REQUEST.
<br />MODIFICATIONS TO THE SWPPP - THIS SWPPP INTENDS TO CONTROL WATER-BORNE AND
<br />LIQUID POLLUTANT DISCHARGES BY SOME COMBINATION OF INTERCEPTION, FILTRATION,
<br />AND CONTAINMENT. THE GENERAL CONTRACTOR AND SUBCONTRACTORS IMPLEMENTING
<br />THIS SWPPP MUST REMAIN ALERT TO THE NEED TO PERIODICALLY REFINE AND UPDATE THE
<br />SWPPP IN ORDER TO ACCOMPLISH THE INTENDED GOALS. THIS SWPPP MUST BE AMENDED AS
<br />NECESSARY DURING THE COURSE OF CONSTRUCTION IN ORDER TO KEEP IT CURRENT WITH
<br />THE POLLUTANT CONTROL MEASURES UTILIZED AT THE SITE. AMENDING THE SWPPP DOES
<br />NOT MEAN THAT IT HAS TO BE REPRINTED. IT IS ACCEPTABLE TO ADD ADDENDA, SKETCHES,
<br />NEW SECTIONS, AND/OR REVISED DRAWINGS. THIS SWPPP MUST BE UPDATED AS NECESSARY
<br />TO INCLUDE ADDITIONAL REQUIREMENTS, SUCH AS ADDITIONAL OR MODIFIED BMPS,
<br />DESIGNED TO CORRECT PROBLEMS IDENTIFIED OR ADDRESS SITUATIONS WHENEVER:
<br />1.THERE IS A CHANGE IN DESIGN, CONSTRUCTION, OPERATION, MAINTENANCE, WEATHER
<br />OR SEASONAL CONDITIONS THAT HAS A SIGNIFICANT EFFECT ON THE DISCHARGE OF
<br />POLLUTANTS TO SURFACE WATERS OR UNDERGROUND WATERS.
<br />2.INSPECTIONS OR INVESTIGATIONS BY SITE OPERATORS, LOCAL, STATE OR FEDERAL
<br />OFFICIALS INDICATE THE SWPPP IS NOT EFFECTIVE IN ELIMINATING OR SIGNIFICANTLY
<br />MINIMIZING THE DISCHARGE OF POLLUTANTS TO SURFACE WATERS OR UNDERGROUND
<br />WATERS OR THAT THE DISCHARGES ARE CAUSING WATER QUALITY STANDARD
<br />EXCEEDANCES.
<br />3.THE SWPPP IS NOT ACHIEVING THE GENERAL OBJECTIVES OF CONTROLLING POLLUTANTS
<br />IN STORM WATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY, OR THE
<br />SWPPP IS NOT CONSISTENT WITH THE TERMS AND CONDITIONS OF THE GENERAL PERMIT.
<br />4.THE MPCA HAS DETERMINED THAT THE PROJECT'S STORM WATER DISCHARGES MAY
<br />CAUSE OR CONTRIBUTE TO NON-ATTAINMENT OF ANY APPLICABLE WATER STANDARD, OR
<br />THAT THE SWPPP DOES NOT INCORPORATE REQUIREMENTS RELATED TO AN APPROVED
<br />TOTAL MAXIMUM DAILY LOAD (TMDL) IMPLEMENTATION PLAN. IN THIS CASE, THE SWPPP
<br />MUST BE UPDATED OR A SUPPLEMENTAL BMP ACTION PLAN DEVELOPED TO ADDRESS THE
<br />IDENTIFIED CONCERNS.
<br />7.3 TRAINING
<br />THE PERMITTEE(S) MUST FULFILL TRAINING REQUIREMENTS AND INCLUDE RECORDS OF
<br />TRAINING IN THE SWPPP. REFRESHER TRAINING MUST BE ATTENDED EVERY THREE YEARS
<br />STARTING THREE YEARS, FROM THE ISSUANCE OF THE 2018 GENERAL PERMIT (ISSUED 8/1/18).
<br />INDIVIDUALS REQUIRED TO BE TRAINED INCLUDE:
<br />1.INDIVIDUALS PREPARING THE SWPPP
<br />2.INDIVIDUALS OVERSEEING IMPLEMENTATION OF, REVISING, AND AMENDING THE SWPPP
<br />AND INDIVIDUALS PERFORMING INSPECTIONS. ONE OF THESE INDIVIDUALS MUST BE
<br />AVAILABLE FOR AN ON SITE INSPECTION WITHIN 72 HOURS UPON REQUEST BY THE MPCA.
<br />3.INDIVIDUALS PERFORMING OR SUPERVISING THE INSTALLATION, MAINTENANCE AND REPAIR
<br />OF BMPS. AT LEAST ONE INDIVIDUAL ON A PROJECT MUST BE TRAINED IN THESE JOB DUTIES.
<br />THE CONTENT AND EXTENT OF TRAINING MUST BE COMMENSURATE WITH THE INDIVIDUAL'S
<br />JOB DUTIES AND RESPONSIBILITIES WITH REGARD TO ACTIVITIES COVERED UNDER THE GENERAL
<br />PERMIT. AT LEAST ONE INDIVIDUAL TRAINED IN THE JOB DUTIES LISTED ABOVE MUST BE
<br />PRESENT ON THE SITE OR AVAILABLE TO THE SITE IN 72 HOURS.
<br />TRAINING DOCUMENTATION MUST INCLUDE:
<br />1.NAMES OF PERSONNEL ASSOCIATED WITH THE PROJECT THAT ARE REQUIRED TO BE TRAINED
<br />2.DATES OF TRAINING AND NAMES OF INSTRUCTOR AND ENTITY PROVIDING TRAINING
<br />3.CONTENT OF TRAINING COURSE, INCLUDING NUMBER OF HOURS OF TRAINING
<br />4.DOCUMENTATION MUST BE KEPT WITH THE SWPPP. TRAINING RECORD/CERTIFICATION
<br />TEMPLATE IS AVAILABLE UPON REQUEST.
<br />INDIVIDUALS MUST BE TRAINED BY LOCAL, STATE, FEDERAL AGENCIES, PROFESSIONAL
<br />ORGANIZATIONS, OR OTHER ENTITIES WITH EXPERTISE IN EROSION PREVENTION, SEDIMENT
<br />CONTROL, OR PERMANENT STORMWATER MANAGEMENT SUCH AS THE UNIVERSITY OF
<br />MINNESOTA, MINNESOTA EROSION CONTROL ASSOCIATION, SOIL AND WATER CONSERVATION
<br />DISTRICTS, OR THE MPCA.
<br />SECTION 8: FINAL STABILIZATION / PERMIT TERMINATION
<br />FINAL STABILIZATION - TO ACHIEVE FINAL STABILIZATION OF THE SITE, THE CONTRACTOR WILL
<br />IMPLEMENT THE FOLLOWING MEASURES AFTER ALL SOIL DISTURBING ACTIVITIES AT THE SITE
<br />HAVE BEEN COMPLETED.
<br />1.ALL SOILS MUST BE STABILIZED BY A UNIFORM PERENNIAL VEGETATIVE COVER WITH A
<br />DENSITY OF 70 PERCENT OVER THE ENTIRE PERVIOUS SURFACE AREA, OR BY OTHER
<br />EQUIVALENT MEANS NECESSARY TO PREVENT SOIL FAILURE UNDER EROSIVE CONDITIONS.
<br />REFER TO LANDSCAPING PLANS/SPECIFICATIONS FOR TYPE OF VEGETATIVE COVER.
<br />2.THE PERMANENT STORMWATER MANAGEMENT SYSTEM IS CONSTRUCTED, MEETS ALL
<br />REQUIREMENTS IN SECTIONS 15, 16, 17, 18, AND 19 OF THE GENERAL PERMIT AND IS
<br />OPERATING AS DESIGNED. TEMPORARY OR PERMANENT SEDIMENTATION BASINS THAT
<br />ARE TO BE USED AS PERMANENT WATER QUALITY MANAGEMENT BASINS HAVE BEEN
<br />CLEAN OF ANY ACCUMULATED SEDIMENT. ALL SEDIMENT HAS BEEN REMOVED FROM
<br />CONVEYANCE SYSTEMS AND DITCHES ARE STABILIZED WITH PERMANENT COVER.
<br />3.ALL TEMPORARY EROSION PREVENTION AND SEDIMENT CONTROL BMPS MUST BE
<br />REMOVED.
<br />4.FOR CONSTRUCTION PROJECTS ON LAND USED FOR AGRICULTURAL PURPOSES FINAL
<br />STABILIZATION MAY BE ACCOMPLISHED BY RETURNING THE DISTURBED LAND TO ITS
<br />PRECONSTRUCTION AGRICULTURAL USE.
<br />5.FOR RESIDENTIAL CONSTRUCTION ONLY, INDIVIDUAL LOTS ARE CONSIDERED FINALLY
<br />STABILIZED IF THE STRUCTURE(S) ARE FINISHED AND TEMPORARY EROSION PROTECTION
<br />AND DOWNGRADIENT PERIMETER CONTROL HAS BEEN COMPLETED AND THE RESIDENCE
<br />HAS BEEN SOLD TO THE HOMEOWNER. ADDITIONALLY, THE PERMITTEE HAS DISTRIBUTED
<br />THE MPCA'S “HOMEOWNER FACT SHEET” TO THE HOMEOWNER TO INFORM THE
<br />HOMEOWNER OF THE NEED FOR, AND BENEFITS OF, PERMANENT COVER.
<br />PERMIT TERMINATION - TO ACHIEVE PERMIT TERMINATION FOR THE SITE, PERMITTEES MUST
<br />COMPLY WITH SECTIONS 4 & 13 OF THE GENERAL PERMIT.
|