Jul 22, 2020 - 11:36am - User:Csyverson L:\PROJECTS\20658.03\CAD\Civil\Sheets\20658.03-C5-EROS.dwg <br />C5.05 <br />SWPPP <br />NARRATIVE <br />Project <br />Location <br />Date Submittal / RevisionNo. <br />Certification <br />Sheet Title <br />Summary <br />Revision History <br />Sheet No.Revision <br />Project No. <br />By <br />Designed:Drawn: <br />Approved:Book / Page: <br />Phase:Initial Issue: <br />Client <br />GORDON <br />JAMES <br />CONSTRUCTION <br />5159 MAIN STREET SUITE 200 <br />MAPLE PLAIN, MN 55359 <br />ORCHARD HILL <br />OF ORONO <br />ORONO, MN <br />JEB CJS <br />ETL <br />PRELIMINARY 04/22/2020 <br />20658.03 <br />Registration No.Date: <br />I hereby certify that this plan, specification or <br />report was prepared by me or under my direct <br />supervision and that I am a duly licensed <br />professional ENGINEER under the laws of the state <br />of Minnesota. <br />If applicable, contact us for a wet signed copy of this <br />plan which is available upon request at Sambatek's, <br />Minnetonka, MN office. <br />04/22/202050475 <br />Eric T. Luth <br />04/22/20 City Submittal <br />05/01/20 MCWD Submittal <br />05/04/20 City Resubmittal <br />07/22/20 City Resubmittal <br />2.10 CONTROL STORMWATER DISCHARGE POINTS <br />1.PIPE OR OTHER TEMPORARY OR PERMANENT OUTLETS MUST BE STABILIZED WITH <br />TEMPORARY OR PERMANENT ENERGY DISSIPATION WITHIN 24 HOURS AFTER <br />CONNECTION TO A SURFACE WATER. <br />2.STABILIZE THE NORMAL WETTED PERIMETER OF A DRAINAGE DITCH OR SWALE WITHIN <br />200 FEET OF THE PROPERTY EDGE WITHIN 24 HOURS OF CONNECTION TO A SURFACE <br />WATER. THE REMAINDER OF THE DITCH MUST BE STABILIZED WITHIN 7 CALENDAR DAYS <br />OF CONNECTION. <br />BMP DESCRIPTION: RIPRAP <br />INSTALLATION SCHEDULE: INSTALL RIPRAP AS SHOWN ON SWPPP PLANS AND/OR GRADING <br />PLANS. INSTALLATION MUST BE COMPLETED WITHIN 24 HOURS OF CONNECTING TO A <br />SURFACE WATER. <br />MAINTENANCE AND INSPECTION REQUIREMENTS: INSPECT OUTLETS EVERY 7 DAYS OR <br />WITHIN 24 HOURS AFTER A 0.5” 24-HOUR RAIN EVENT. REPAIR, REPLACE OR SUPPLEMENT <br />NON-FUNCTIONING RIPRAP ENERGY DISSIPATION WITHIN 3 DAYS OR BY THE NEXT RAIN EVENT, <br />WHICHEVER COMES FIRST. ANY OFF SITE ACCUMULATION OF SEDIMENT MUST BE REMOVED <br />IN MANNER AND AT A FREQUENCY TO MINIMIZE OFF-SITE IMPACTS. <br />RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE): <br />2.11 CHEMICAL EROSION AND SEDIMENT CONTROL BMPS <br />POLYMERS, FLOCCULANTS, OR OTHER SEDIMENTATION TREATMENT CHEMICALS MUST BE <br />APPLIED AFTER CONVENTIONAL EROSION AND SEDIMENT CONTROL DEVICES ARE UTILIZED. <br />CHEMICALS MAY ONLY BE APPLIED WHERE TREATED STORMWATER IS DIRECTED TO A <br />SEDIMENT CONTROL SYSTEM WHICH ALLOWS FOR FILTRATION OR SETTLEMENT OF THE FLOC <br />PRIOR TO DISCHARGE. CONSIDERATION MUST BE GIVEN WHEN SELECTING CHEMICALS TO THE <br />EXPECTED SOIL TYPES TO BE EXPOSED DURING CONSTRUCTION, AND TO THE EXPECTED <br />TURBIDITY, PH AND FLOW RATE OF STORMWATER FLOWING INTO THE CHEMICAL <br />TREATMENT SYSTEM OR AREA. IF CHEMICALS ARE PART OF THE EROSION CONTROL PLAN, <br />THEY MUST BE USED IN ACCORDANCE WITH ACCEPTED ENGINEERING PRACTICES, AND WITH <br />DOSING SPECIFICATION AND SEDIMENT REMOVAL DESIGN SPECIFICATIONS PROVIDED BY THE <br />MANUFACTURER OR PROVIDER/SUPPLIER OF THE APPLICABLE CHEMICALS. <br />SECTION 3: DEWATERING & BASIN DRAINING <br />3.1 DEWATERING AND BASIN DRAINING <br />ALLOWABLE NON-STORMWATER DISCHARGES, AS DEFINED BY THE GENERAL PERMIT, ARE <br />LIMITED TO DEWATERING AND BASIN DRAINING. DEWATERING OR BASIN DRAINING THAT <br />MAY HAVE TURBID OR SEDIMENT LADEN DISCHARGE WATER MUST BE DISCHARGED TO A <br />TEMPORARY OR PERMANENT SEDIMENTATION BASIN ON THE PROJECT SITE WHENEVER <br />POSSIBLE. IF THE WATER CANNOT BE DISCHARGED TO A SEDIMENTATION BASIN PRIOR TO <br />ENTERING THE SURFACE WATER, IT MUST BE TREATED WITH THE APPROPRIATE BMPS, SUCH <br />THAT THE DISCHARGE DOES NOT ADVERSELY AFFECT THE RECEIVING WATER OR <br />DOWNSTREAM LANDOWNERS. THE CONTRACTOR MUST ENSURE THAT DISCHARGE POINTS <br />ARE ADEQUATELY PROTECTED FROM EROSION AND SCOUR. THE DISCHARGE MUST BE <br />DISPERSED OVER NATURAL ROCK RIPRAP, SAND BAGS, PLASTIC SHEETING OR OTHER <br />ACCEPTED ENERGY DISSIPATION MEASURES. ADEQUATE SEDIMENTATION CONTROL <br />MEASURES ARE REQUIRED FOR DISCHARGE WATER THAT CONTAINS SUSPENDED SOLIDS. ALL <br />WATER FROM DEWATERING OR BASIN DRAINING MUST BE DISCHARGED IN A MANNER THAT <br />DOES NOT CAUSE NUISANCE CONDITIONS, EROSION IN RECEIVING CHANNELS OR ON <br />DOWNSLOPE PROPERTIES, OR INUNDATION IN WETLANDS CAUSING SIGNIFICANT ADVERSE <br />IMPACT TO THE WETLAND. IF THE CONTRACTOR ELECTS TO UTILIZE FILTERS WITH BACKWASH <br />WATER, THE CONTRACTOR MUST HAUL THE BACKWASH WATER AWAY FOR DISPOSAL, <br />RETURN THE BACKWATER TO THE BEGINNING OF THE TREATMENT PROCESS, OR <br />INCORPORATE THE BACKWASH WATER INTO THE SITE IN A MANNER THAT DOES NOT CAUSE <br />EROSION. THE CONTRACTOR MUST REPLACE AND CLEAN THE FILTER MEDIA USED IN <br />DEWATERING DEVICES WHEN REQUIRED TO RETAIN ADEQUATE FUNCTION. CONTRACTOR <br />SHALL OBTAIN A WATER USE (APPROPRIATION) PERMIT FROM THE MINNESOTA DNR FOR <br />DEWATERING ACTIVITIES THAT WILL WITHDRAW MORE THAN 10,000 GALLONS OF WATER <br />PER DAY OR 1 MILLION GALLONS PER YEAR. <br />SECTION 4: GOOD HOUSEKEEPING BMPS <br />4.1 MATERIAL HANDLING AND WASTE MANAGEMENT <br />1.SOLID WASTE DISPOSAL - NO SOLID MATERIALS, INCLUDING CONSTRUCTION AND <br />DEMOLITION MATERIALS, COLLECTED SEDIMENT, ASPHALT AND CONCRETE MILLINGS, <br />SHALL BE ALLOWED TO BE CARRIED FROM THE SITE WITH STORM WATER. ALL SOLID <br />WASTE, INCLUDING DISPOSABLE MATERIALS INCIDENTAL TO THE MAJOR CONSTRUCTION <br />ACTIVITIES, MUST BE COLLECTED AND PLACED IN CONTAINERS. THE CONTAINERS WILL <br />BE EMPTIED PERIODICALLY BY A CONTRACT TRASH DISPOSAL SERVICE AND HAULED <br />AWAY FROM THE SITE. DISPOSAL OF SOLID WASTES MUST COMPLY WITH MPCA <br />REQUIREMENTS. <br />2.GROUNDWATER PROTECTION - SUBSTANCES THAT HAVE THE POTENTIAL FOR <br />POLLUTING SURFACE AND/OR GROUNDWATER MUST BE CONTROLLED BY WHATEVER <br />MEANS NECESSARY IN ORDER TO ENSURE THAT THEY DO NOT DISCHARGE FROM THE <br />SITE. AS AN EXAMPLE, SPECIAL CARE MUST BE EXERCISED DURING EQUIPMENT FUELING <br />AND SERVICING OPERATIONS. IF A SPILL OCCURS, IT MUST BE CONTAINED AND DISPOSED <br />OF SO THAT IT WILL NOT FLOW FROM THE SITE OR ENTER GROUNDWATER, EVEN IF THIS <br />REQUIRES REMOVAL, TREATMENT, AND DISPOSAL OF SOIL. IN THIS REGARD, <br />POTENTIALLY POLLUTING SUBSTANCES SHOULD BE HANDLED IN A MANNER CONSISTENT <br />WITH THE IMPACT THEY REPRESENT. <br />3.SANITARY FACILITIES - ALL PERSONNEL INVOLVED WITH CONSTRUCTION ACTIVITIES <br />MUST COMPLY WITH STATE AND LOCAL SANITARY SEPTIC SYSTEM REGULATIONS. <br />PORTABLE TOILETS MUST BE POSITIONED SO THAT THEY ARE SECURE AND WILL NOT BE <br />TIPPED OR KNOCKED OVER. TEMPORARY SANITARY FACILITIES WILL BE PROVIDED AT THE <br />SITE THROUGHOUT THE CONSTRUCTION PHASE WHERE REQUIRED BY STATE OR LOCAL <br />REGULATIONS. THEY MUST BE UTILIZED BY ALL CONSTRUCTION PERSONNEL AND BE <br />SERVICED BY A COMMERCIAL OPERATOR. <br />4.2 ESTABLISH PROPER STORAGE, HANDLING & DISPOSAL <br />PRACTICES <br />HAZARDOUS MATERIALS & TOXIC WASTE (INCLUDING OIL, DIESEL FUEL, GASOLINE, <br />HYDRAULIC FLUIDS, PAINT SOLVENTS, PETROLEUM-BASED PRODUCTS, WOOD PRESERVATIVES, <br />ADDITIVES, CURING COMPOUNDS, AND ACIDS) MUST BE STORED IN WATERPROOF <br />CONTAINERS WITH SECONDARY CONTAINMENT, AND THEIR LOCATION(S) MUST BE NOTED ON <br />THE SWPPP MAP. EXCEPT DURING APPLICATION, THE CONTENTS MUST BE KEPT IN TRUCKS OR <br />WITHIN STORAGE FACILITIES IN ACCORDANCE WITH SECTION 12.4 OF THE GENERAL PERMIT. <br />STORAGE AND DISPOSAL OF HAZARDOUS WASTE MUST BE IN COMPLIANCE WITH MCPA <br />REGULATIONS. RUNOFF CONTAINING SUCH MATERIAL MUST BE COLLECTED, REMOVED FROM <br />THE SITE, TREATED, AND DISPOSED AT AN APPROVED SOLID WASTE OR CHEMICAL DISPOSAL <br />FACILITY. <br />BUILDING PRODUCTS THAT HAVE THE POTENTIAL TO LEACH POLLUTANTS AND PESTICIDES, <br />HERBICIDES, INSECTICIDES, FERTILIZERS, TREATMENT CHEMICALS AND LANDSCAPE MATERIALS <br />MUST BE UNDER COVER BY PLASTIC SHEETING OR TEMPORARY ROOFS TO PREVENT <br />DISCHARGE, OR PROTECTED BY SIMILAR EFFECTIVE MEANS TO PREVENT CONTACT WITH <br />STORMWATER. <br />4.3 DESIGNATE WASHOUT AREAS <br />THE CONTRACTOR SHALL DESIGNATE AREAS FOR CONCRETE AND OTHER (STUCCO, PAINT, FOR <br />RELEASE OILS, CURING COMPOUNDS AND OTHER CONSTRUCTION MATERIALS RELATED TO <br />THE CONSTRUCTION ACTIVITY) WASHOUTS, AND NOTE THE LOCATIONS ON THE SITE MAP. <br />ALL LIQUID AND SOLID WASTES GENERATED BY WASHOUT OPERATIONS MUST BE CONTAINED <br />IN A LEAK PROOF CONTAINMENT FACILITY OR IMPERMEABLE LAYER. A COMPACTED CLAY <br />LINER IS NOT AN ACCEPTABLE IMPERMEABLE LAYER. THE LIQUID AND SOLID WASTES MUST <br />NOT CONTACT THE GROUND, AND THERE MUST NOT BE RUNOFF FROM THE WASHOUT <br />OPERATIONS OR AREAS. LIQUID AND SOLID WASTE MUST BE DISPOSED OF PROPERLY AND IN <br />COMPLIANCE WITH MPCA REGULATIONS. A SIGN MUST BE INSTALLED ADJACENT TO EACH <br />WASHOUT FACILITY TO INFORM SITE WORKERS TO UTILIZE PROPER FACILITIES FOR DISPOSAL <br />OF CONCRETE AND OTHER WASTES. <br />BMP DESCRIPTION: CONCRETE WASHOUT <br />INSTALLATION SCHEDULE: PRIOR TO CONCRETE WORK. <br />MAINTENANCE AND INSPECTION REQUIREMENTS: INSPECT CONCRETE WASHOUTS FOR <br />EVIDENCE OF DISCHARGE EVERY 7 DAYS OR WITHIN 24 HOURS AFTER A 0.5” 24-HOUR RAIN <br />EVENT. REPAIR, REPLACE OR SUPPLEMENT NON-FUNCTIONING CONCRETE WASHOUTS <br />WITHIN 3 DAYS OR BY THE NEXT USE, WHICHEVER COMES FIRST. <br />RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE): <br />4.4 ESTABLISH PROPER EQUIPMENT/VEHICLE FUELING AND <br />MAINTENANCE PRACTICES <br />THE CONTRACTOR SHALL DESIGNATE AREAS FOR EQUIPMENT FUELING, CLEANING, <br />MAINTENANCE AND REPAIR, AND NOTE THE LOCATION(S) ON THE SWPPP SITE MAPS. <br />RUNOFF MUST BE CONTAINED WITHIN THE DESIGNATED AREAS (I.E. THROUGH USE OF A <br />TEMPORARY BERM). THE AREAS MUST NOT BE LOCATED IN ANY SURFACE WATER. SPECIAL <br />CARE MUST BE EXERCISED DURING EQUIPMENT FUELING AND SERVICING OPERATIONS. IF A <br />SPILL OCCURS, IT MUST BE CONTAINED AND DISPOSED OF SO THAT IT WILL NOT FLOW FROM <br />THE SITE OR ENTER GROUNDWATER, EVEN IF THIS REQUIRES REMOVAL, TREATMENT, AND <br />DISPOSAL OF SOIL. IT IS THE CONTRACTORS RESPONSIBILITY TO ENSURE THAT ADEQUATE <br />SUPPLIES ARE AVAILABLE AT ALL TIMES TO CLEAN UP DISCHARGED MATERIALS AND THAT AN <br />APPROPRIATE DISPOSAL METHOD IS AVAILABLE FOR RECOVERED SPILLED MATERIALS. NO <br />ENGINE DEGREASING IS ALLOWED ON SITE. <br />4.5 CONTROL EQUIPMENT/VEHICLE WASHING <br />THE CONTRACTOR SHALL DESIGNATE LOCATION(S) FOR VEHICLE WASHING, AND NOTE THE <br />LOCATION(S) ON THE SWPPP SITE MAP. RUNOFF FROM THE WASHING AREA MUST BE <br />CONTAINED IN A SEDIMENT BASIN OR OTHER SIMILARLY EFFECTIVE CONTROLS AND WASTE <br />FROM THE WASHING ACTIVITY MUST BE PROPERLY DISPOSED OF. THE CONTRACTOR MUST <br />PROPERLY USE AND STORE SOAPS, DETERGENTS AND SOLVENTS. ENGINE DEGREASING OF <br />TRUCKS AND OTHER CONSTRUCTION VEHICLES IS ALSO PROHIBITED. <br />4.6 SPILL PREVENTION AND CONTROL PLAN <br />1.ACCIDENTAL SPILL - DISCHARGE OF OIL OR OTHER HAZARDOUS SUBSTANCES IS SUBJECT <br />TO REPORTING AND CLEAN UP REQUIREMENTS. IN CASE OF AN ACCIDENTAL SPILL, THE <br />MINNESOTA POLLUTION CONTROL AGENCY IS TO BE NOTIFIED AT THEIR 24-HOUR <br />TELEPHONE NUMBER: 651-649-5451. REFER TO SECTION 12 OF THE GENERAL PERMIT. <br />2.GROUNDWATER PROTECTION - SUBSTANCES THAT HAVE THE POTENTIAL FOR POLLUTING <br />SURFACE AND/OR GROUNDWATER MUST BE CONTROLLED BY WHATEVER MEANS <br />NECESSARY IN ORDER TO ENSURE THAT THEY DO NOT DISCHARGE FROM THE SITE. AS AN <br />EXAMPLE, SPECIAL CARE MUST BE EXERCISED DURING EQUIPMENT FUELING AND <br />SERVICING OPERATIONS. IF A SPILL OCCURS, IT MUST BE CONTAINED AND DISPOSED OF SO <br />THAT IT WILL NOT FLOW FROM THE SITE OR ENTER GROUNDWATER, EVEN IF THIS <br />REQUIRES REMOVAL, TREATMENT, AND DISPOSAL OF SOIL. IN THIS REGARD, POTENTIALLY <br />POLLUTING SUBSTANCES SHOULD BE HANDLED IN A MANNER CONSISTENT WITH THE <br />IMPACT THEY REPRESENT. <br />SECTION 5: POST-CONSTRUCTION BMPS <br />BMP DESCRIPTION: INFILTRATION BASIN <br />INSTALLATION SCHEDULE: AFTER SITE IS STABILIZED <br />MAINTENANCE AND INSPECTION REQUIREMENTS: NO HEAVY EQUIPMENT TO BE PLACED IN <br />THESE AREAS, MINIMIZING THE COMPACTION. PERIODIC CHECK OF FLOW CONDITIONS TO <br />TRACK DRAWDOWN OF THE WATER IN THE BASIN. <br />THE DEVICE WILL BE INSPECTED AND CLEARED OF SEDIMENT BUILD UP TWICE PER YEAR AND <br />AS NEEDED. PLANTED VEGETATION ALSO NEEDS TO BE INSPECTED PERIODICALLY AND <br />REPLACED AS NECESSARY. INSPECTION WILL ALSO INCLUDE CHECKING FOR ANY PROBLEMATIC <br />EROSION TAKING PLACE ON THE SLOPES OF THE BASIN. EROSION ISSUES WILL BE REPAIRED AS <br />THEY ARE FOUND. <br />RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE): <br />SECTION 6: INSPECTIONS <br />6.1 INSPECTIONS <br />1.INSPECTION FREQUENCY AND RESPONSIBILITY <br />BETWEEN THE TIME THIS SWPPP IS IMPLEMENTED AND FINAL SITE STABILIZATION IS <br />ACHIEVED AND THE NOTICE OF TERMINATION FILED WITH THE MPCA, ALL DISTURBED AREAS <br />AND POLLUTANT CONTROLS MUST BE INSPECTED AT LEAST ONCE EVERY SEVEN CALENDAR <br />DAYS AND WITHIN 24 HOURS FOLLOWING A RAINFALL OF 0.5 INCHES OR GREATER. THE <br />PURPOSE OF SITE INSPECTIONS IS TO ASSESS PERFORMANCE OF POLLUTANT CONTROLS. THE <br />INSPECTIONS WILL BE CONDUCTED BY THE CONTRACTOR'S DESIGNATED REPRESENTATIVE. <br />BASED ON THESE INSPECTIONS, THE CONTRACTOR WILL DECIDE WHETHER IT IS NECESSARY <br />TO MODIFY THIS SWPPP, ADD OR RELOCATE STRUCTURAL BMPS, OR WHATEVER ELSE MAY BE <br />NEEDED IN ORDER TO PREVENT POLLUTANTS FROM LEAVING THE SITE VIA STORM WATER <br />RUNOFF. IF THE SWPPP REQUIRES MODIFICATION, THOSE CHANGES TO THE SWPPP MUST BE <br />DOCUMENTED. THE CONTRACTOR HAS THE DUTY TO CAUSE POLLUTANT CONTROL <br />MEASURES TO BE REPAIRED, MODIFIED, MAINTAINED, SUPPLEMENTED, OR WHATEVER ELSE <br />IS NECESSARY IN ORDER TO ACHIEVE EFFECTIVE POLLUTANT CONTROL. <br />2. INSPECTION PROCEDURES - EXAMPLES OF PARTICULAR ITEMS TO EVALUATE DURING SITE <br />INSPECTIONS ARE LISTED BELOW. THIS LIST IS NOT INTENDED TO BE COMPREHENSIVE. <br />DURING EACH INSPECTION THE INSPECTOR MUST EVALUATE OVERALL POLLUTANT <br />CONTROL SYSTEM PERFORMANCE AS WELL AS PARTICULAR DETAILS OF INDIVIDUAL <br />SYSTEM COMPONENTS. ADDITIONAL FACTORS SHOULD BE CONSIDERED AS APPROPRIATE <br />TO THE CIRCUMSTANCES. <br />A. PRE-INSPECTION PREPARATION: <br />1. INSPECTORS SHOULD BE FAMILIAR WITH THE SWPPP, INCLUDING THE EROSION AND <br />SEDIMENT CONTROL PLANS, PAST INSPECTION REPORTS, AND MAINTENANCE LOGS. <br />2. PAY SPECIAL ATTENTION TO STORM WATER DISCHARGE TO SPECIAL/IMPAIRED <br />WATERS AND WETLANDS; DISCHARGES TO SPECIAL/IMPAIRED WATERS AND <br />WETLANDS HAVE ADDITIONAL REQUIREMENTS THAT ARE DESCRIBED IN SECTION 23 <br />OF THE GENERAL PERMIT, AND ADDRESSED IN THIS SWPPP. <br />B. SITE ENTRY: <br />1. BEFORE ENTERING THE SITE, OBSERVE THE SURROUNDINGS AND VARIOUS STAGES <br />OF CONSTRUCTION. NOTE AREAS FOR IN-DEPTH REVIEW AND ANY POTENTIAL <br />ISSUES. <br />2. THIS IS A GOOD TIME TO VIEW CONSTRUCTION SITE VEHICLE TRACKING PAD <br />LOCATIONS AND PERIMETER CONTROLS. <br />C. RECORDS REVIEW: <br />1. VERIFY THAT A COPY OF THE SWPPP AND APPLICATION FOR THE NPDES STORM <br />WATER PERMIT, AND COPIES OF ALL CONSTRUCTION SITE INSPECTIONS ARE ON <br />SITE. <br />2. VERIFY THAT THE TIMING FOR INSTALLATION OF ALL EROSION PREVENTION AND <br />SEDIMENT CONTROL BMPS, AS WELL AS CONSTRUCTION PHASING, IS GENERALLY <br />BEING FOLLOWED. <br />3. SWPPPS ARE INTENDED TO BE DYNAMIC DOCUMENTS, VERIFY THAT AMENDMENTS <br />OR CHANGES TO THE SWPPP ARE BEING MADE WHEN: <br />A.A CHANGE IN DESIGN, CONSTRUCTION, OPERATION, MAINTENANCE, WEATHER <br />OR SEASONAL CONDITIONS HAVE A SIGNIFICANT EFFECT ON STORM WATER <br />DISCHARGES <br />B. INSPECTIONS INDICATE THE SWPPP IS NOT EFFECTIVE <br />C. THE SWPPP IS NOT CONSISTENT WITH THE TERMS OF THE GENERAL PERMIT <br />D. SITE INSPECTION (NOTE TIMELINES FOR MAINTENANCE INCLUDED IN <br />INSPECTION/MAINTENANCE REPORT) <br />1. INSPECT DISCHARGE POINTS DOWNSTREAM AND OFF-SITE AREAS FOR SIGNS <br />OF IMPACT. <br />2. INSPECT PERIMETER CONTROLS: <br />A. HAVE PERIMETER CONTROLS BEEN PROPERLY INSTALLED AND <br />MAINTAINED? <br />B. ARE VEHICLE TRACKING PADS FUNCTIONING PROPERLY? ARE <br />ADDITIONAL ENTRANCES/EXITS BEING USED THAT ARE NOT STABILIZED? <br />C. ALL STORM DRAINS MUST BE PROTECTED AND TEMPORARY STOCKPILES <br />MUST HAVE SEDIMENT CONTROLS INSTALLED. <br />D. ALL EXPOSED SOILS MUST HAVE TEMPORARY OR PERMANENT EROSION <br />PROTECTION WITHIN 7 DAYS OF INACTIVITY. <br />3. COMPARE BMPS IN THE SWPPP WITH CONSTRUCTION SITE CONDITIONS: ARE <br />REQUIRED BMPS IN PLACE; ARE ADDITIONAL BMPS NEEDED; ARE BMPS IN <br />PLACE PROPERLY INSTALLED AND MAINTAINED? <br />4. INSPECT AREAS THAT HAVE BEEN DISTURBED AND ARE NOT CURRENTLY <br />BEING WORKED. ANY UNSEEDED OR UNMULCHED BARE AREAS THAT HAVE <br />BEEN IDLE FOR 7 DAYS SHOULD BE NOTED. <br />5. INSPECT AREAS WITH FINAL STABILIZATION. IN ORDER FOR FINAL <br />STABILIZATION TO BE ACHIEVED, AREAS MUST HAVE A UNIFORM COVER <br />WITH A DENSITY OF 70% OVER ENTIRE AREA. TEMPORARY BMPS SHOULD BE <br />REMOVED AND AREAS DISTURBED BY REMOVAL SEEDED AS NECESSARY. <br />E. EXIT INTERVIEW: <br />1. DEBRIEF THE PERSON IN CHARGE. EXPLAIN THE IDENTIFIED DEFICIENCIES <br />AND ANY AREAS OF CONCERN. <br />F. A COPY OF THE COMPLETED INSPECTION REPORT MUST BE KEPT WITH THE <br />SWPPP ON SITE. <br />THE INSPECTION REPORT USED SHOULD INCLUDE, AT A MINIMUM, THE <br />FOLLOWING: <br />·DATE & TIME OF INSPECTION <br />·NAME OF INSPECTOR(S) <br />·FINDINGS OF INSPECTIONS AND RECOMMENDATIONS FOR CORRECTIVE <br />ACTIONS <br />·CORRECTIVE ACTIONS TAKEN, INCLUDING DATES, TIMES AND NAMES OF <br />PARTY COMPLETING MAINTENANCE <br />·DATE & AMOUNT OF RAINFALL <br />·RECORD OF ALL POINTS OF DISCHARGE FROM THE PROPERTY AND <br />DESCRIPTION OF DISCHARGE <br />·NOTE TO UPDATE THE SWPPP <br />6.2 DELEGATION OF AUTHORITY <br />DULY AUTHORIZED REPRESENTATIVE(S) OR POSITION(S): <br /> COMPANY OR ORGANIZATION NAME: <br /> NAME: <br /> POSITION: <br /> ADDRESS: <br /> CITY, STATE, ZIP CODE: <br /> TELEPHONE NUMBER: <br /> FAX/EMAIL: <br />6.3 CORRECTIVE ACTION LOG <br />THE INSPECTION/MAINTENANCE FORM, AVAILABLE UPON REQUEST, INCORPORATES <br />BOTH INSPECTION AND MAINTENANCE REPORTING INTO A SINGLE FORM. THIS FORM <br />ALSO SPECIFIES THE TIME ALLOWED FOR CORRECTIONS TO BE PERFORMED. IF THE <br />PARTY PERFORMING INSPECTIONS CHOOSES TO USE ANOTHER INSPECTION FORM, A <br />SEPARATE CORRECTIVE ACTION LOG MUST BE PROVIDED. <br />SECTION 7: RECORD KEEPING AND TRAINING <br />7.1 RECORDKEEPING <br />RECORD RETENTION - THE OWNER MUST KEEP THE SWPPP INCLUDING ALL CHANGES MADE <br />TO IT DURING CONSTRUCTION (SEE SECTION 7.2 OF THIS SWPPP), ALONG WITH THE <br />FOLLOWING ADDITIONAL RECORDS ON FILE FOR THREE YEARS AFTER COMPLETION OF THE <br />CONSTRUCTION PROJECT (FINAL STABILIZATION AND NOTICE OF TERMINATION): <br />1.ANY OTHER STORMWATER RELATED PERMITS REQUIRED FOR THE PROJECT <br />2.RECORDS OF ALL INSPECTIONS AND MAINTENANCE CONDUCTED DURING CONSTRUCTION <br />3.ALL PERMANENT OPERATION AND MAINTENANCE AGREEMENTS THAT HAVE BEEN <br />IMPLEMENTED, INCLUDING ALL RIGHT OF WAY, CONTRACTS, COVENANTS AND OTHER <br />BINDING REQUIREMENTS REGARDING PERPETUAL MAINTENANCE <br />4.ALL REQUIRED CALCULATIONS FOR DESIGN OF THE TEMPORARY AND PERMANENT STORM <br />WATER MANAGEMENT SYSTEMS <br />7.2 AMENDMENTS <br />THE CONTRACTOR SHALL KEEP A RECORD LOG OF ALL MODIFICATIONS TO THE SWPPP. AN <br />EXAMPLE OF A SWPPP UPDATE LOG FORM CAN BE PROVIDED UPON REQUEST. <br />MODIFICATIONS TO THE SWPPP - THIS SWPPP INTENDS TO CONTROL WATER-BORNE AND <br />LIQUID POLLUTANT DISCHARGES BY SOME COMBINATION OF INTERCEPTION, FILTRATION, <br />AND CONTAINMENT. THE GENERAL CONTRACTOR AND SUBCONTRACTORS IMPLEMENTING <br />THIS SWPPP MUST REMAIN ALERT TO THE NEED TO PERIODICALLY REFINE AND UPDATE THE <br />SWPPP IN ORDER TO ACCOMPLISH THE INTENDED GOALS. THIS SWPPP MUST BE AMENDED AS <br />NECESSARY DURING THE COURSE OF CONSTRUCTION IN ORDER TO KEEP IT CURRENT WITH <br />THE POLLUTANT CONTROL MEASURES UTILIZED AT THE SITE. AMENDING THE SWPPP DOES <br />NOT MEAN THAT IT HAS TO BE REPRINTED. IT IS ACCEPTABLE TO ADD ADDENDA, SKETCHES, <br />NEW SECTIONS, AND/OR REVISED DRAWINGS. THIS SWPPP MUST BE UPDATED AS NECESSARY <br />TO INCLUDE ADDITIONAL REQUIREMENTS, SUCH AS ADDITIONAL OR MODIFIED BMPS, <br />DESIGNED TO CORRECT PROBLEMS IDENTIFIED OR ADDRESS SITUATIONS WHENEVER: <br />1.THERE IS A CHANGE IN DESIGN, CONSTRUCTION, OPERATION, MAINTENANCE, WEATHER <br />OR SEASONAL CONDITIONS THAT HAS A SIGNIFICANT EFFECT ON THE DISCHARGE OF <br />POLLUTANTS TO SURFACE WATERS OR UNDERGROUND WATERS. <br />2.INSPECTIONS OR INVESTIGATIONS BY SITE OPERATORS, LOCAL, STATE OR FEDERAL <br />OFFICIALS INDICATE THE SWPPP IS NOT EFFECTIVE IN ELIMINATING OR SIGNIFICANTLY <br />MINIMIZING THE DISCHARGE OF POLLUTANTS TO SURFACE WATERS OR UNDERGROUND <br />WATERS OR THAT THE DISCHARGES ARE CAUSING WATER QUALITY STANDARD <br />EXCEEDANCES. <br />3.THE SWPPP IS NOT ACHIEVING THE GENERAL OBJECTIVES OF CONTROLLING POLLUTANTS <br />IN STORM WATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY, OR THE <br />SWPPP IS NOT CONSISTENT WITH THE TERMS AND CONDITIONS OF THE GENERAL PERMIT. <br />4.THE MPCA HAS DETERMINED THAT THE PROJECT'S STORM WATER DISCHARGES MAY <br />CAUSE OR CONTRIBUTE TO NON-ATTAINMENT OF ANY APPLICABLE WATER STANDARD, OR <br />THAT THE SWPPP DOES NOT INCORPORATE REQUIREMENTS RELATED TO AN APPROVED <br />TOTAL MAXIMUM DAILY LOAD (TMDL) IMPLEMENTATION PLAN. IN THIS CASE, THE SWPPP <br />MUST BE UPDATED OR A SUPPLEMENTAL BMP ACTION PLAN DEVELOPED TO ADDRESS THE <br />IDENTIFIED CONCERNS. <br />7.3 TRAINING <br />THE PERMITTEE(S) MUST FULFILL TRAINING REQUIREMENTS AND INCLUDE RECORDS OF <br />TRAINING IN THE SWPPP. REFRESHER TRAINING MUST BE ATTENDED EVERY THREE YEARS <br />STARTING THREE YEARS, FROM THE ISSUANCE OF THE 2018 GENERAL PERMIT (ISSUED 8/1/18). <br />INDIVIDUALS REQUIRED TO BE TRAINED INCLUDE: <br />1.INDIVIDUALS PREPARING THE SWPPP <br />2.INDIVIDUALS OVERSEEING IMPLEMENTATION OF, REVISING, AND AMENDING THE SWPPP <br />AND INDIVIDUALS PERFORMING INSPECTIONS. ONE OF THESE INDIVIDUALS MUST BE <br />AVAILABLE FOR AN ON SITE INSPECTION WITHIN 72 HOURS UPON REQUEST BY THE MPCA. <br />3.INDIVIDUALS PERFORMING OR SUPERVISING THE INSTALLATION, MAINTENANCE AND REPAIR <br />OF BMPS. AT LEAST ONE INDIVIDUAL ON A PROJECT MUST BE TRAINED IN THESE JOB DUTIES. <br />THE CONTENT AND EXTENT OF TRAINING MUST BE COMMENSURATE WITH THE INDIVIDUAL'S <br />JOB DUTIES AND RESPONSIBILITIES WITH REGARD TO ACTIVITIES COVERED UNDER THE GENERAL <br />PERMIT. AT LEAST ONE INDIVIDUAL TRAINED IN THE JOB DUTIES LISTED ABOVE MUST BE <br />PRESENT ON THE SITE OR AVAILABLE TO THE SITE IN 72 HOURS. <br />TRAINING DOCUMENTATION MUST INCLUDE: <br />1.NAMES OF PERSONNEL ASSOCIATED WITH THE PROJECT THAT ARE REQUIRED TO BE TRAINED <br />2.DATES OF TRAINING AND NAMES OF INSTRUCTOR AND ENTITY PROVIDING TRAINING <br />3.CONTENT OF TRAINING COURSE, INCLUDING NUMBER OF HOURS OF TRAINING <br />4.DOCUMENTATION MUST BE KEPT WITH THE SWPPP. TRAINING RECORD/CERTIFICATION <br />TEMPLATE IS AVAILABLE UPON REQUEST. <br />INDIVIDUALS MUST BE TRAINED BY LOCAL, STATE, FEDERAL AGENCIES, PROFESSIONAL <br />ORGANIZATIONS, OR OTHER ENTITIES WITH EXPERTISE IN EROSION PREVENTION, SEDIMENT <br />CONTROL, OR PERMANENT STORMWATER MANAGEMENT SUCH AS THE UNIVERSITY OF <br />MINNESOTA, MINNESOTA EROSION CONTROL ASSOCIATION, SOIL AND WATER CONSERVATION <br />DISTRICTS, OR THE MPCA. <br />SECTION 8: FINAL STABILIZATION / PERMIT TERMINATION <br />FINAL STABILIZATION - TO ACHIEVE FINAL STABILIZATION OF THE SITE, THE CONTRACTOR WILL <br />IMPLEMENT THE FOLLOWING MEASURES AFTER ALL SOIL DISTURBING ACTIVITIES AT THE SITE <br />HAVE BEEN COMPLETED. <br />1.ALL SOILS MUST BE STABILIZED BY A UNIFORM PERENNIAL VEGETATIVE COVER WITH A <br />DENSITY OF 70 PERCENT OVER THE ENTIRE PERVIOUS SURFACE AREA, OR BY OTHER <br />EQUIVALENT MEANS NECESSARY TO PREVENT SOIL FAILURE UNDER EROSIVE CONDITIONS. <br />REFER TO LANDSCAPING PLANS/SPECIFICATIONS FOR TYPE OF VEGETATIVE COVER. <br />2.THE PERMANENT STORMWATER MANAGEMENT SYSTEM IS CONSTRUCTED, MEETS ALL <br />REQUIREMENTS IN SECTIONS 15, 16, 17, 18, AND 19 OF THE GENERAL PERMIT AND IS <br />OPERATING AS DESIGNED. TEMPORARY OR PERMANENT SEDIMENTATION BASINS THAT <br />ARE TO BE USED AS PERMANENT WATER QUALITY MANAGEMENT BASINS HAVE BEEN <br />CLEAN OF ANY ACCUMULATED SEDIMENT. ALL SEDIMENT HAS BEEN REMOVED FROM <br />CONVEYANCE SYSTEMS AND DITCHES ARE STABILIZED WITH PERMANENT COVER. <br />3.ALL TEMPORARY EROSION PREVENTION AND SEDIMENT CONTROL BMPS MUST BE <br />REMOVED. <br />4.FOR CONSTRUCTION PROJECTS ON LAND USED FOR AGRICULTURAL PURPOSES FINAL <br />STABILIZATION MAY BE ACCOMPLISHED BY RETURNING THE DISTURBED LAND TO ITS <br />PRECONSTRUCTION AGRICULTURAL USE. <br />5.FOR RESIDENTIAL CONSTRUCTION ONLY, INDIVIDUAL LOTS ARE CONSIDERED FINALLY <br />STABILIZED IF THE STRUCTURE(S) ARE FINISHED AND TEMPORARY EROSION PROTECTION <br />AND DOWNGRADIENT PERIMETER CONTROL HAS BEEN COMPLETED AND THE RESIDENCE <br />HAS BEEN SOLD TO THE HOMEOWNER. ADDITIONALLY, THE PERMITTEE HAS DISTRIBUTED <br />THE MPCA'S “HOMEOWNER FACT SHEET” TO THE HOMEOWNER TO INFORM THE <br />HOMEOWNER OF THE NEED FOR, AND BENEFITS OF, PERMANENT COVER. <br />PERMIT TERMINATION - TO ACHIEVE PERMIT TERMINATION FOR THE SITE, PERMITTEES MUST <br />COMPLY WITH SECTIONS 4 & 13 OF THE GENERAL PERMIT.