My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 4476
Orono
>
Property Files
>
Street Address
>
S
>
Shadywood Road
>
2380 Shadywood Road - 17-117-23-44-0111
>
Resolutions
>
Res 4476
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:46:20 PM
Creation date
5/6/2020 12:02:44 PM
Metadata
Fields
Template:
x Address Old
House Number
2380
Street Name
Shadywood
Street Type
Road
Address
2380 Shadywood Road
Document Type
Resolutions
PIN
1711723440111
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/SO <br /> 110 O <br /> = � ,� r. CITY of ORONO <br /> 1,4,l 1 ,,,;1411 <br /> ,,; I1�� �G4'.'' ' <br /> ti RESOLUTION OF �E CITY COUNCIL <br /> Ii04 NO. 7�S <br /> would be vacated in favor of the Lafayette Ridge Homeowners Association. <br /> Easements shall permit utilities and drainage over the entire width of the right <br /> of way. <br /> 3. The sidewalk connection to Olive Avenue as shown on the approved site plan <br /> shall be constructed and maintained permanently by applicant/property owner <br /> to provide pedestrian access through the site between Shadywood Road and <br /> Olive Avenue. Applicant shall grant a 12' wide trail easement to connect <br /> Olive Avenue and Shadywood Road as shown on the approved site plan. <br /> It is the intent of the City that although the City is being granted such <br /> easements, the walkway within applicant's property shall be maintained by the <br /> property owner, not the City. All upkeep, maintenance and snow removal <br /> activity shall be the responsibility of the property owner. <br /> 4. The parking lot shall be paved with concrete curb and gutter, driving lanes <br /> within parking lot shall have a 9-ton pavement section for trucks. A <br /> geotechnical evaluation of the soil shall be done in conjunction with the <br /> pavement design and shall be submitted to the City Engineer for approval. <br /> 5. Applicants' architect shall submit final development plans to the Metro Council <br /> Environmental Services to determine the exact number of SAC units to be <br /> charged at the time of the issuance of a building permit. The City will also <br /> determine if additional Sewer and Water Unit Adjustment Charges and system <br /> upgrade connection charges will be required for the new development, to be <br /> paid by applicant prior to issuance of the building permit. <br /> 6. Appropriate traffic and parking signage shall be installed subject to the Orono <br /> staff and City Engineer's review. <br /> 7. The landscape areas as shown on the above referenced site plan shall consist <br /> of grass wherever feasible and shall adhere to the above referenced Revised <br /> Landscape Plan dated June 1, 2000 in regards to planting species, sizes and <br /> locations. <br /> 8. Site frontage for commercial signage calculation will be limited to the frontage <br /> Page 7 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.