Laserfiche WebLink
'0 <br /> 4 <br /> %:....4. t,.. i._ CITY of ORONO <br /> A ` l�I�'t"i c: <br /> . 4�; I�� �. RESOLUTION OF THE CITY COUNCIL <br /> ��9kE i•i& NO. 4 R . 1' <br /> �S <br /> along Shadywood Road, being 381 feet in length. Signage for this site shall <br /> be regulated by the provisions of Zoning Code Section 10.61, Subd. 1, Subd. <br /> 3(A) and Subd. 3(D). No commercial signage will be allowed along the <br /> facade of the building facing Olive Avenue except as minimally needed to <br /> identify service entrances to buildings, and as needed for the drug store drive <br /> thru. The sign plan provided with the final plan set completed by Tom <br /> Reinen, Reinen Architects dated June 1, 2000 is approved. Any changes to <br /> the sign plan for the property may require additional review. <br /> 9. Final lighting plan shall be subject to City staff approval and shall locate <br /> lighting so as to direct lights away from the adjacent residential neighborhood. <br /> 10. No future business shall have a public entrance through the rear (Olive <br /> Avenue side) of the building. <br /> 11. No formal approval for shared parking agreements between this property and <br /> adjacent commercial properties has been approved for this site. <br /> 12. Erosion control shall adhere to "Best Management Practices for Protecting., <br /> Water Quality in Urban Areas". All erosion controls as required by the City <br /> shall be in place prior to commencing excavation on the site. The stormwater <br /> pond construction shall be substantially completed and functional prior to <br /> construction of building footings. <br /> 13. The City Engineer shall complete a estimate of improvement costs, including <br /> but not limited to landscaping, grading, erosion control, utilities, pavement, <br /> trails, retaining walls and pond/outlet control structure construction and the <br /> applicant shall submit to the City a financial guarantee of 150% of the <br /> improvement costs subject to a Developer's Agreement being executed by the <br /> developer and City of Orono. <br /> 14. Prior to issuance of a building permit, applicant shall provide suitable evidence <br /> of property ownership acceptable to the City Attorney. <br /> 15. Drainage and Utility Easements shall be granted to the City of Orono 10' <br /> along all exterior property lines and 5' along the interior property line. <br /> Page 8 of 12 <br />