Laserfiche WebLink
Generat Comments <br /> Building Maintenance <br /> The building is over 20 years old and is in need of maintenance. Our costs have not addressed all of <br /> the areas, but we have discussed the need to assess the mechanical equipment, the current roofing <br /> and make recommendations in other areas. <br /> Preliminary Construction Costs <br /> Part 1 Police Expansion <br /> Construction costs are broken into 5 areas <br /> 1. Existing Building Remodeled <br /> 2. Daily Operations and Lockers <br /> 3. New Garage <br /> 4. Site Work Modifications <br /> 5. Mechanical Equipment Maintenance <br /> Mark Kotten of Kraus Anderson met with SKD to review the proposed project drawings and preliminary <br /> description of a scope of work. Many assumptions were made at this point, and a general preliminary <br /> cost guideline was developed. The following are rough estimates of the general construction cost per <br /> group. It is expected that this would serve to establish a range of construction costs up or down. <br /> 1. Existing Building Remodeled $520,000 <br /> 2. Daily Operations and Lockers $275,000 <br /> 3. New Garage $1,650,000 <br /> 4. Site Work Modifications $465,000 <br /> 5. Mechanical Equipment Maintenance (main building) 85 000 <br /> Project Total $2,995,000 <br /> Part 2 Remodel of the Lobby and General Office Area <br /> General remodel of space including some open office furnishings: <br /> 1. Front Lobby, and Front Office Remodel $250,000 <br /> Page 7 <br />