My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-18-2020 Planning Commission Packet
Orono
>
Planning Commission
>
2020
>
02-18-2020 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2020 8:56:46 AM
Creation date
2/20/2020 8:10:27 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BO LTO N 2638 Shadow Lane <br /> J , Suite 200 <br /> Chask <br /> & M E N K a, MN 55318-1172 <br /> Real People. Real Solutions. Ph: [952)448-8838 <br /> Fax: (952)448-8805 <br /> Bolton-Menk.com <br /> January 23,2020 <br /> City of Orono <br /> Attn:Adam Edwards <br /> 2750 Kelley Parkway <br /> Orono, MN 55356 <br /> RE: Site Plan Application#LA18-000036 <br /> 2745 Kelley Parkway <br /> Engineering Review#2 <br /> Dear Adam: <br /> As requested,we have completed an engineering review of the documents submitted for the above <br /> referenced project. We offer the following observations, comments,and recommendations for your <br /> consideration: <br /> Items to be completed prior to Approval <br /> 1. The Final Stormwater Management Plan, approved by MCWD, must be submitted to the City <br /> for their records. <br /> 2. Drainage and Utility Easements must be provided to adequately cover utilities as follows. <br /> Exhibits and descriptions should be submitted for review,and after City approval,easements <br /> should be recorded with the County. <br /> a. Watermain,hydrants,and valves(except private service lines) <br /> b. Stormwater management facilities used to meet governmental requirements <br /> 3. A 10' trail easement must be provided adjacent to the south lot line. Exhibit and description <br /> should be submitted for review, and after City approval, easement should be recorded with the <br /> County. <br /> Items to be completed prior to Construction <br /> 4. A separate City permit must be obtained for the sanitary sewer and water connections. <br /> 5. The condition of the regional pond east of the site must be reviewed by the City and Contractor <br /> prior to any work. The pond bottom must be verified with survey prior to any work,and once <br /> work commences,the Contractor shall be responsible for removing any sediment added to the <br /> pond due to site construction. <br /> 6. The condition of Kelley Parkway and adjacent sidewalk must be reviewed by the City and <br /> Contractor prior to any work and verified with video or pictures. Any damage to the street or <br /> sidewalk after work commences shall be deemed to be caused by the Contractor and the <br /> Owner's responsibility to repair. <br /> 7. All work within public right-of-way and connections to watermain must be coordinated with <br /> the City. Contractor must provide a minimum 48 hour prior notice. <br /> 8. All construction equipment must be parked on site. Clear drive lanes must be maintained on <br /> Kelley Parkway at all times. <br /> 9. Temporary barricades must be installed at the west entrances to direct traffic through the rock <br /> H:\ORNO\C13115486\z-LA18-000036_2745 Kelley Parkway\2745Ke11eyPkwy-2_2020-01-23.docx <br /> Bolton&Menk is an equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.