My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-18-2020 Planning Commission Packet
Orono
>
Planning Commission
>
2020
>
02-18-2020 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2020 8:56:46 AM
Creation date
2/20/2020 8:10:27 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Site Plan Application#LA18-000036 <br /> 2745 Kelley Parkway <br /> Page 2 <br /> entrance until the site is permanently stabilized. <br /> 10. Extent of removals at connections to existing pavement shall be coordinated in the field with <br /> the City prior to any work. Concrete sidewalk removal limits shall be located at a joint. <br /> Bituminous pavement should be saw-cut for clean match lines. <br /> 11. Once the sanitary sewer stub is exposed and location, size, and elevation are field verified, <br /> layout and design of service connection must be submitted to City for review and approval <br /> prior to construction. <br /> 12. The Contractor must submit a Site Management Plan prior to work. The plan must outline <br /> concrete management,work that will require dewatering, and any other work requiring <br /> protective measures to minimize potential for negative environmental impact. <br /> 13. The Contractor must be required to submit a Traffic Control Plan prior to work. <br /> 14. The applicant will be required to obtain a General Construction Permit(NPDES)to discharge <br /> stormwater associated with construction activity since more than 1 acre will be disturbed. A <br /> copy of the permit must be submitted prior to any land disturbing activity. <br /> 15. The applicant must submit a Maintenance Agreement for all stormwater management structures <br /> and facilities, listing the City as a party to Agreement. The agreement should define <br /> maintenance responsibilities following completion of project,specify types and frequencies of <br /> inspection and maintenance activities,and designate who will conduct inspection and <br /> maintenance activities. <br /> If you have any questions or comments,please contact me to discuss. <br /> Sincerely, <br /> Bolton & Menk, Inc. <br /> -6::ZOteg <br /> Robert E. Bean,Jr.,P.E. <br /> Water Resources Engineer <br /> H:\ORNO\C13115486\z-LA18-000036_2745 Kelley Parkway2745KelleyPkwy-2_2020-01-23.docx <br /> Bolton&Menk is an equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.