Laserfiche WebLink
a CITY of ORONO <br /> RESOLUTION OF THE CITY COUNCIL <br /> L�kESH0 NO. 2927 <br /> 4. Lot 1 has been found to have suitable soils to support <br /> on-site sewage treatment facilities to serve current and <br /> future needs. <br /> 5. Lots 1 and 2 have been found to satisfy all rural <br /> standards of the RR-1B zoning district. <br /> 6. Outlot A has been created for the sole purpose of access. <br /> The access road within Outlot A shall serve Lots 1 and 2. <br /> Applicants shall develop covenants for the maintenance of <br /> the road and culverts and the responsibility for maintenance <br /> of yard areas within the dry buildable portion of Outlot A <br /> and eastern portion of Lot 2. <br /> 7. Outlot B has been created to define the remaining portion <br /> of the property for future development. Outlot B contains <br /> no structures as of this platting and serves as open space <br /> areas consisting of the greens area of the golf course. <br /> NOW, THEREFORE BE IT RESOLVED, that based upon one or <br /> more of the findings noted above, the City Council of the City of <br /> Orono hereby approves the preliminary plat of Fairway Hills <br /> Addition per the survey dated December 14, 1990, revised January <br /> 22, 1991 by Raymond A. Prasch of Lot Surveys Company, Inc., <br /> and approves the extension of municipal water and sewer to Lot 1, <br /> subject to the following conditions: <br /> 1. The installation of utilities and driveway within Outlot <br /> A shall be subject to the conditions set forth in the <br /> resolution approving a conditional use permit and variance <br /> for all land alterations. <br /> 2. Building permits for residential construction on both <br /> Lots 1 and 2 shall be issued by the City of Orono. Sewer <br /> and water permits shall be issued by the City of Orono for <br /> both Lots 1 and 2. The billing for sewer and water usage <br /> shall be the responsibility of the City of Orono. Based on <br /> the 1991 fee schedule, sewer connection charge for Lot 1 is <br /> $7,224.57 and a water connection charge is $3,531.18. <br /> Page 2 of 5 <br />