My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015 - 00214 - roofing
Orono
>
Property Files
>
Street Address
>
W
>
Wayzata Boulevard West
>
2250 Wayzata Boulevard West - 34-118-23-22-0023 - Well No 3 Pumphouse
>
Permits/Inspections
>
2015 - 00214 - roofing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:56:25 PM
Creation date
1/15/2020 9:30:41 AM
Metadata
Fields
Template:
x Address Old
House Number
2250
Street Name
Wayzata
Street Type
Boulevard
Street Direction
West
Address
2250 Wayzata Boulevard West
Document Type
Permits/Inspections
PIN
3411823220023
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 07600-FLASHING AND SHEET METAL WORK <br /> PART 1--GENERAL <br /> 1.1 SUMMARY <br /> A. Work covered in this section shall include all material,labor,facilities and administration required to <br /> furnish and install all sheet metal work shown or specified. <br /> 1.2 RELATED SECTIONS <br /> A. Section 07500—Roofing System <br /> B. Section 07900-Sealants and Caulking <br /> 1.3 SUBMITTALS <br /> A. Shop drawings shall be submitted for copings,facia and rain water drainage. Joint details and locations <br /> shall be shown in the shop drawings. <br /> B. Submit manufacturer's current specification and related literature. <br /> C. Provide samples and color chart for color selection. <br /> D. Submit manufacturer's 20-year paint warranty covering finish fade,chalk and peel. <br /> l.4 QUALITY ASSURANCE <br /> A. Comply with Architectural Sheet Metal Manual,Sheet Metal and Air Conditioning Contractor's <br /> National Association,Inc.,recommendations. <br /> B. Fabrication and installation is to be completed by trained personnel. <br /> 1.5 PRODUCT DELIVERY,STORAGE AND HANDLING <br /> A. Make no deliveries to project until ready to install or approved storage is provided. <br /> B. All products to be stored above the ground on supports that are not to be used in the work. <br /> C. Flammable materials must be stored in conformance with fire codes and in manner that will not create <br /> a potential fire hazard. <br /> D. Select and operate material handling equipment so not to damage existing construction,or new roofing <br /> system,and without overloading building structural system. <br /> E. Any damage to existing construction must be immediately reported to the Engineer. <br /> F. Color-coated sheet metal must be stored in a manner that will protect it from exposure to the sun up <br /> until the time of installation. <br /> 1.6 GUARANTEES <br /> A. Provide manufacturer's standard twenty(20)year written guarantee for color-coated metal covering <br /> color fade,chalk and film integrity. <br /> C13.108617-Orono,MN FLASHING AND SHEET METAL WORK <br /> Water Treatment System Improvements PAGE 07600-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.