My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015 - 00214 - roofing
Orono
>
Property Files
>
Street Address
>
W
>
Wayzata Boulevard West
>
2250 Wayzata Boulevard West - 34-118-23-22-0023 - Well No 3 Pumphouse
>
Permits/Inspections
>
2015 - 00214 - roofing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:56:25 PM
Creation date
1/15/2020 9:30:41 AM
Metadata
Fields
Template:
x Address Old
House Number
2250
Street Name
Wayzata
Street Type
Boulevard
Street Direction
West
Address
2250 Wayzata Boulevard West
Document Type
Permits/Inspections
PIN
3411823220023
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 2--PRODUCTS <br /> 2.1 MANUFACTURERS <br /> A. Ryerson Building Products("Colorklad") <br /> B. Peterson Aluminum Corporation("PAC-CLAD") <br /> C. Firestone Building Products(UNA-CLAD) <br /> 2.2 MATERIALS <br /> A. All color-coated metal for roof edge,flashings,reglets and wall caps shall be 24-gauge,pre-painted, <br /> galvanized steel(ASTM A526)with a minimum of 1 mil(dry)total thickness factory applied finish on <br /> exposed surface(color to be selected from manufacturer's standard colors)and 0.3 to 0.4 mil(dry)total <br /> thickness factory applied finish on unexposed surface. A strippable plastic film is to be factory applied <br /> to exposed surface of metal. <br /> B. Provide fasteners compatible with metal. <br /> PART 3--EXECUTION <br /> 3.1 FABRICATION <br /> A. Shop form sections as much as possible. <br /> B. Comply with Architectural Sheet Metal Manual,Sheet Metal and Air Conditioning Contractor's • <br /> National Association,Inc. <br /> 3.2 SCHEDULE <br /> A. Provide reglets and other items installed by others in time to be built into the work. <br /> 3.3 INSPECTION <br /> A. Verify that substrates are smooth and clean to the extent needed for sheet metal work. <br /> B. Verify that reglets,cants,and blocking,to receive sheet metal are installed and free of concrete and <br /> soil. <br /> C. Do not start sheet metal work until conditions are satisfactory. <br /> 3.4 PREPARATION <br /> A. Before installing sheet metal verify shapes and dimensions of surface to be covered. <br /> 3.5 INSTALLATION <br /> A. Install flashing and sheet metal to comply with Architectural Sheet Metal Manual,Sheet Metal and Air <br /> Conditioning Contractor's National Association,Inc. <br /> 3.6 REPAIRING <br /> A. Repair or replace damaged work. <br /> 3.7 CLEANING <br /> A. Leave work clean and free of stains,scrap,and debris. <br /> ****END OF SECTION**** <br /> C13.108617-Orono,MN FLASHING AND SHEET METAL WORK <br /> Water Treatment System Improvements PAGE 07600-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.