My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Special Structural Testing & Inspection Schedule
Orono
>
Property Files
>
Street Address
>
W
>
Wayzata Boulevard West
>
0875 Wayzata Boulevard West - 35-118-23-44-0011
>
Misc
>
Special Structural Testing & Inspection Schedule
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:00:03 PM
Creation date
1/6/2020 9:51:49 AM
Metadata
Fields
Template:
x Address Old
House Number
875
Street Name
Wayzata
Street Type
Boulevard
Street Direction
West
Address
875 Wayzata Boulevard West
Document Type
Misc
PIN
3511823440011
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TEL <br /> RFIIQSTAP FAX 651.292.1123 Field Report <br /> & Associates, Inc. <br /> Professional Engineers Date: 11/03/2011 <br /> 192 West 9th Street Project: Orono Senior Housing <br /> St. Paul, Minnesota 55102 <br /> Location: Orono, MN <br /> To: Greg Woollums <br /> Pope Associates Contractor: Kraus Anderson <br /> 1255 Energy Park Drive <br /> St. Paul, MN 55108-5118 Owner: Kraus Anderson <br /> Weather: 45 degrees F, Sunny <br /> Present At Site: Keith Ringold <br /> Jared Reigstad <br /> Gordon Reigstad <br /> The following was noted: <br /> A. Work Completed: <br /> 1.) Foundations: 100% <br /> • 100% of the building foundations are complete. <br /> 2.) Level 1: 95% <br /> • Structural stud walls and posts have been placed, but not sheathed; exterior walls only <br /> sheathed on the exterior. <br /> • Area of Refuge 50% complete. <br /> 3.) Level 2: 95% <br /> • Structural walls and posts are placed, but not sheathed; exterior walls only sheathed on <br /> the exterior. <br /> 4.) Roof: 50% <br /> • Roof trusses are placed on half of the building; sheathing is placed on half of these <br /> trusses. <br /> • Detail 4 and 5 on S7.1 were not followed appropriately for strapping the roof trusses down <br /> to the walls and lintels. This was discussed on site, and issues 1 and 2 below are solutions. <br /> 5.) Canopy: 50% <br /> • 100% of the canopy foundations are complete. <br /> • 50% of the canopy superstructure is complete. <br /> J:\Reigstad Projects\Pope Architects\Orono Senior Housing\Construction Administration\Photos and Field Reports\201 1-11-03 <br /> OSH-Field Observation Report#2.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.