Laserfiche WebLink
TEL <br /> RFIIQSTAP FAX 651.292.1123 Field Report <br /> & Associates, Inc. <br /> Professional Engineers Date: 11/03/2011 <br /> 192 West 9th Street Project: Orono Senior Housing <br /> St. Paul, Minnesota 55102 <br /> Location: Orono, MN <br /> To: Greg Woollums <br /> Pope Associates Contractor: Kraus Anderson <br /> 1255 Energy Park Drive <br /> St. Paul, MN 55108-5118 Owner: Kraus Anderson <br /> Weather: 45 degrees F, Sunny <br /> Present At Site: Keith Ringold <br /> Jared Reigstad <br /> Gordon Reigstad <br /> The following was noted: <br /> A. Work Completed: <br /> 1.) Foundations: 100% <br /> • 100% of the building foundations are complete. <br /> 2.) Level 1: 95% <br /> • Structural stud walls and posts have been placed, but not sheathed; exterior walls only <br /> sheathed on the exterior. <br /> • Area of Refuge 50% complete. <br /> 3.) Level 2: 95% <br /> • Structural walls and posts are placed, but not sheathed; exterior walls only sheathed on <br /> the exterior. <br /> 4.) Roof: 50% <br /> • Roof trusses are placed on half of the building; sheathing is placed on half of these <br /> trusses. <br /> • Detail 4 and 5 on S7.1 were not followed appropriately for strapping the roof trusses down <br /> to the walls and lintels. This was discussed on site, and issues 1 and 2 below are solutions. <br /> 5.) Canopy: 50% <br /> • 100% of the canopy foundations are complete. <br /> • 50% of the canopy superstructure is complete. <br /> J:\Reigstad Projects\Pope Architects\Orono Senior Housing\Construction Administration\Photos and Field Reports\201 1-11-03 <br /> OSH-Field Observation Report#2.doc <br />