My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Special Structural Testing & Inspection Schedule
Orono
>
Property Files
>
Street Address
>
W
>
Wayzata Blvd W
>
0875 Wayzata Blvd W - 35-118-23-44-0011
>
Misc
>
Special Structural Testing & Inspection Schedule
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:00:03 PM
Creation date
1/6/2020 9:51:49 AM
Metadata
Fields
Template:
Address
House Number
875
Street Name
Wayzata
Street Type
Boulevard
Street Direction
West
Address
875 Wayzata Boulevard West
Document Type
Misc
PIN
3511823440011
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TEL 651.292.1123 <br /> RFIGSTAIJ FAX 651.292.8015 Field Report <br /> & Associates, Inc. <br /> Professional Engineers Date: 09/01/2011 <br /> 192 West 9th Street Project: Orono Senior Housing <br /> St. Paul, Minnesota 55102 <br /> Location: Orono, MN <br /> To: Greg Woollums <br /> Pope Associates Contractor: Kraus Anderson <br /> 1255 Energy Park Drive <br /> St. Paul, MN 55108-5118 Owner: Kraus Anderson <br /> Weather: 65 degrees F, Sunny <br /> Present At Site: Keith Ringold <br /> Jared Reigstad <br /> The following was noted: <br /> A. Work Completed: <br /> 1.) Foundations: 50% <br /> • 90% of the exterior foundations and foundation walls are complete. <br /> • 0% of the interior foundations are complete. <br /> • 0% of the canopy foundations are complete. <br /> 2.) Level 1: 0% <br /> 3.) Level 2: 0% <br /> 4.) Roof: 0% <br /> B. Issues to Note: <br /> 1.) As discussed on site, post-installed anchors rods can be used for the interior strip footings, <br /> and exterior pad footings. <br /> C. Pending Issues: <br /> There are no pending issues at this time <br /> This report should not be misunderstood as a final inspection approval report or a final checklist. Our <br /> walk-through observations were not detailed inspections. See the special inspector's reports for <br /> detailed inspection results and for any other issues to be corrected. Please call if you have any <br /> questions regarding this report. <br /> Jared M Reigstad <br /> Project Manager <br /> Reigstad &Associates <br /> C: Jim Beckwith KA, Keith Ringold KA, file <br /> J:\Reigstad Projects\Pope Architects\Orono Senior Housing\Construction Administration\Photos and Field Reports12011-11-03 <br /> OSH—Field Observation Report#2.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.