Laserfiche WebLink
TEL 651.292.1123 <br /> RFIGSTAIJ FAX 651.292.8015 Field Report <br /> & Associates, Inc. <br /> Professional Engineers Date: 09/01/2011 <br /> 192 West 9th Street Project: Orono Senior Housing <br /> St. Paul, Minnesota 55102 <br /> Location: Orono, MN <br /> To: Greg Woollums <br /> Pope Associates Contractor: Kraus Anderson <br /> 1255 Energy Park Drive <br /> St. Paul, MN 55108-5118 Owner: Kraus Anderson <br /> Weather: 65 degrees F, Sunny <br /> Present At Site: Keith Ringold <br /> Jared Reigstad <br /> The following was noted: <br /> A. Work Completed: <br /> 1.) Foundations: 50% <br /> • 90% of the exterior foundations and foundation walls are complete. <br /> • 0% of the interior foundations are complete. <br /> • 0% of the canopy foundations are complete. <br /> 2.) Level 1: 0% <br /> 3.) Level 2: 0% <br /> 4.) Roof: 0% <br /> B. Issues to Note: <br /> 1.) As discussed on site, post-installed anchors rods can be used for the interior strip footings, <br /> and exterior pad footings. <br /> C. Pending Issues: <br /> There are no pending issues at this time <br /> This report should not be misunderstood as a final inspection approval report or a final checklist. Our <br /> walk-through observations were not detailed inspections. See the special inspector's reports for <br /> detailed inspection results and for any other issues to be corrected. Please call if you have any <br /> questions regarding this report. <br /> Jared M Reigstad <br /> Project Manager <br /> Reigstad &Associates <br /> C: Jim Beckwith KA, Keith Ringold KA, file <br /> J:\Reigstad Projects\Pope Architects\Orono Senior Housing\Construction Administration\Photos and Field Reports12011-11-03 <br /> OSH—Field Observation Report#2.doc <br />