My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Special Structural Testing & Inspection Schedule
Orono
>
Property Files
>
Street Address
>
W
>
Wayzata Boulevard West
>
0875 Wayzata Boulevard West - 35-118-23-44-0011
>
Misc
>
Special Structural Testing & Inspection Schedule
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:00:03 PM
Creation date
1/6/2020 9:51:49 AM
Metadata
Fields
Template:
x Address Old
House Number
875
Street Name
Wayzata
Street Type
Boulevard
Street Direction
West
Address
875 Wayzata Boulevard West
Document Type
Misc
PIN
3511823440011
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TEL <br /> 3 <br /> BE I -STAR FAX 651.292.8015112 <br /> & Associates, Inc. <br /> Professional Engineers <br /> 192 West 9th Street <br /> St. Paul, Minnesota 55102 <br /> B. Issues to Note: <br /> 1.) As discussed on site, a metal strap needs to be placed from the top plate to the stud at 32" <br /> o.c. at the roof interior corridor and exterior walls. Use a Simpson SSP for fastening a double <br /> top plate to single stud per the attached document. <br /> 2.) A metal strap needs to be placed at the ends of all lintels (lintel to post below) at the roof <br /> interior corridor and exterior walls. Use a Simpson LSTA18 per the attached document. <br /> 3.) A metal strap needs to be placed from the LVL's in the mechanical area well to the top stud <br /> plate at the roof interior corridor walls at 4'-0" o.c. Use Simpson TSP for fastening to a <br /> double top plate per the attached document. <br /> 4.) The L5 lintel supporting the roof at the main entrance at the stairway currently spans the <br /> entire opening at the corridor. Per S1.3, a (4) 2x6 post needs to be added under the L5 lintel <br /> at mid-span and needs to be carried below to the foundation. <br /> This report should not be misunderstood as a final inspection approval report or a final checklist. Our <br /> walk-through observations were not detailed inspections. See the special inspector's reports for <br /> detailed inspection results and for any other issues to be corrected. Please call if you have any <br /> questions regarding this report. <br /> Jared M Reigstad <br /> Project Manager <br /> Reigstad &Associates <br /> C: Jim Beckwith KA, Keith Ringold KA, file <br /> J:\Reigstad Projects\Pope Architects\Orono Senior Housing\Construction Adnministration\Photos and Field Reports\2011-11-03 <br /> OSH—Field Observation Report#2.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.