Laserfiche WebLink
Page) of j <br /> SIDRPT Rev 10/09 <br /> BRAUN <br /> 'NTE RTEC Special Inspection Daily Report <br /> City of ()con v <br /> Report No.: e Date of This Report: ?/ // <br /> Project Name: Oro,J S � ' Project No.: 6L - J/ 0/0/Y4 <br /> Project Address: <br /> Client: �� Client Project No.: �~ <br /> Project Manager: inf 1 /7e ��t,�r Temp/Weather: <br /> Type of Inspection: Inspection Coverage: <br /> 0 Continuous 0 Masonry -1g Rebar Placement ❑ Foundations ❑ Special Cases <br /> ..[Periodic ❑ Welding& Bolting {?- Concrete Placement <br /> 0 Fireproofing <br /> ❑ Piles& Piers ❑ Tendon Placement eS. Soils <br /> Did the architect or engineer authorize changes to city approved plans? Yes ❑ (Listed Below) No-a <br /> Description and location of work completed: 25,,„ /'list r 3 '. }. �QrG r�/e <br /> /2/Ci ft/►l G v� 7 / <br /> List tests performed: y i. l/t J G� �c 9(‘ 7 _5-- <br /> ///3.1/, • /1e,-,./r 04:r e <br /> • Are there any discrepancies noted from this day's observations? Yes 0 No-®' <br /> • Are there any outstanding discrepancies on this project? Yes 0 No 13 <br /> • If yes, see attached Summary Sheet. <br /> To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable <br /> workmanship provisions of the current IBC,except as noted above. <br /> Signed: c� — ' Date: <br /> Print Full Name: t e„/(71/ I.D. No.: 5305. <br /> White copy to Braun Intertec file. Yellow copy to Project Site Representative. <br /> • Providing engineering and environmental solutions since 1957 <br />