Laserfiche WebLink
Page ' of L <br /> SIDRPT Rev 10/09 <br /> BRAUN <br /> NTE BTEC Special Inspection Daily Report <br /> City of Or-on v <br /> Report No.: 7 Date of This Report: g o -‘ <br /> Project Name: Oro,.,v Sr, ��aN{ 4 Project No.: ,3L ... // O/b/y4 <br /> Project Address: ,4/ I,� ,/, /,� 7h <br /> Client: /C� Client Project No.: <br /> Project Manager: �, Temp/Weather: <br /> Type of Inspection: Inspection Coverage: <br /> ❑ Continuous ❑ Masonry f'Rebar Placement <br /> ❑ Foundations ❑ Special Cases <br /> 4 Periodic 0 Welding & Bolting .8 Concrete Placement 0 Fireproofing <br /> 0 Piles& Piers 0 Tendon Placement 0 Soils <br /> Did the architect or engineer authorize changes to city approved plans? Yes ❑ (Listed Below) No ❑ <br /> Description and location of work completed: / / <br /> 0�3e/'uc G B'G/��r eztr, <br /> / � � � � <br /> 9/- Cs�I�Gr /�r' (?rte_ c i., 4?Ji�� , t /et-cr ip <br /> List tests performed: /e , <br /> 1/g ` 1/13/0/ <br /> • Are there any discrepancies noted from this day's observations? Yes ❑ No {' .. <br /> • Are there any outstanding discrepancies on this project? Yes ❑ No j4 <br /> • If yes, see attached Summary Sheet. <br /> To the best of our knowledge,work inspected was done in accordance with the approved plans, specifications and applicable <br /> workmanship provisions of the current IBC, except as noted above. <br /> Signed: �� Date: <br /> Print Full Name: G t . I.D.ry/72' No.: X30 9 <br /> White copy to Braun lntertec file. Yellow copy to Project Site Representative. <br /> • Providing engineering and environmental solutions since 1957 <br />