My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-010783 - new septic
Orono
>
Property Files
>
Street Address
>
W
>
Watertown Road
>
4480 Watertown Road - 31-118-23-24-0001
>
Septic
>
1998-010783 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:30:07 PM
Creation date
12/13/2019 10:42:31 AM
Metadata
Fields
Template:
x Address Old
House Number
4480
Street Name
Watertown
Street Type
Road
Address
4480 Watertown Road
Document Type
Septic
PIN
3111823240001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
u FAS/T-4- <br /> G. DOWNSLOPE BERM WIDTH Slope:- Cover 1' 4,S = / <br /> O ' y yeti Vim'y''''yg ..��.- <br /> 1. If landslope is 1% or more, ). €�. r ''` 1 ;rt <br /> "b ye '1 ' .fir <br /> •e subtract rock layer width from adsorption width �, , , .•• ::..f.ok *:'.Z _�� 6,A, �,. <br /> to obtain minimum downslope berm toe c4.�` +" y, ' clean Sana I r,, :' ; .7./ .-, , rP'''''..lr,: <br /> 6 Topsoil , <br /> 27 ft - /U ft = / 7 feet Natural Soil it 3 <br /> 2. Calculate Minimum mound Size <br /> a. Determine depth of clean sand fill at Upslope Width Downslope Width ....QC) 4-•• <br /> upslope edge of rock layer: /34"4ir Rock Width .4 Absorption Width7 <br /> Separation 3' - /r 3 ft = /, 7 feet JO 4- <br /> b. Add depth of clean sand for separation (2a) 5 44 -9- -- l-1 a/c -=t <br /> at upslope edge, depth of rock layer (1 foot) to depth of cover <br /> (1 foot) to find the mound height at the upslope edge of rock layer; 17 <br /> /,7 ft + lft lft = 3,7 feet • <br /> c. Enter table with landslope and jloPe berm UpSiuPe Width /3 <br /> •ratio. Select berm multiplier of 3 . ra a.�Ov vex- a00`r�� <br /> d. Multiply berm multiplier byupslope mound M tipeiepe Width °oop'n dougo, w►:Bed Coo4p�'oa.i,A llpslvpe Widn <br /> u.o.e0 e• a( a o..a o-oco< <br /> P Y PyD Pet q iPPO.F o1 oG <br /> JY?��i•4uv�Qyo oouua Qo9,kg;9pDC: '17 1 <br /> height to find upslope berm width: � ...11.0....:-.'::. <br /> 3..5 x3,7 = /Z9 feet - /3+ <br /> e. Multiply rock layer width by Zo <br /> 12 Downslope Width <br /> landslope to determine drop in elevation; Absorption Width 17 •.� • . <br /> /c. x 5' % 100 = Q.6/ feet <br /> - <br /> f. Add depth of clean sand for slope Total Length <br /> difference (2e)at downslope edge, to 7S . <br /> the mound height at the upslope edge <br /> of rock layer (2b) to find the downslope height; <br /> -3.7 ft +Or '9' ft = A4/ feet <br /> g. Enter table with landslope and downslope berm ratio. Select <br /> t4 <br /> term multiplier of • <br /> h. Multiply berm multiplier by downslope mound height to get BERM SLOPE MULTIPLIERS <br /> downslope berm width: <br /> 4i/ x'/ X =/9:7 feet - (.-7° 4i- Land DOWNSLOPE UPSLOPE <br /> i. Compare the values of step G.1 1 7 Slope, berm multipliers for various berm multipliers for various <br /> in% 1 berm slope ratios berm slope ratios <br /> and Step G.2h 2 <br /> Select the greater of the two values as the 3:1 6T)5:1 6:1 7:1 3:1 4�:1 5:1 6:1 71 <br /> downslope berm width; 2 0 0 3.0 4.0 5.0 6.0 7.0 ' 3.0 4.0 ' 5.0 6.0 7.0 r. <br /> p feet <br /> j. Total mound width is the sum of 1 3.09 4.17 5.26 6.38 7.53 2.91 3.85 4.76 5.66 6.54 <br /> upslope berm (G.2d) 2 3.19 4.35 5.56 6-82 8.14 2.83 3.70 4.54 5.36 6.14 t, <br /> 3 3.30 4.54 5.88 7.32 8.86 2.75 3.57 4.35 5.08 5.79 t. <br /> width plus rock layer width (D.2) 4 3.414.7 .25 7.89 9.72 2.68 `3 4.17 • 4.84 5.46 0 <br /> plus downslope berm width(G.2i); 5 3.53 5.00 6.67 8.57 10.77 2.61 3.33 4.00 4.62 5.19 <br /> /3 ft + /0 ft + 20 ft = --3 , feet 6 3.66 5.26 7.14 9.38 12.07 2.54 3.23 3.85 4.41 4.93 5 <br /> k. Total mound length is the sum of upslope 7 3.80 5.56 7.69 10.34 13.73 2.48 3.12 3.70 4.23 4.70 5. <br /> berm width (G.2d) plus rock layer length (D.3) 8 3.95 5.88 8.33 11.54 15.91 2.42 3.03 3.57 4.05 4.49 4 <br /> �}�p plus upslopebermwidth (G.2d);/ 9 4.11 6.25 9.09 13.04 18.92 2.36 2.94 3.45 3.90 4.30 4 <br /> JI-"47-5 ft + ' / ft + / 3 ft = 6 7 feet 10 4.29 6.67 10.00 15.00 23.33 2.31 2.86 3.33 3.75 4.12 4. <br /> `��(1 I7 4' 4 l 1 4- 7 ;-7 J,1J 1I 4.48 7.14 11.11 17.65 30.43 2.26 2.78 3.23 3.61 3.95 4. <br /> , . /` 12 4.69 7.69 12.50 21.43 43.75 2.21 2.70 3.12 3.49 3.80 4 <br /> 1 Final D im esi ons o Note:The product of the multiplier and the height results in the horizontal distance to where <br /> k term meets the original land slope.Example:Height at upper edge of rock layer is 3.0 feet.i. <br /> Cl/ ,p� X = <br /> ^ ayer is 10 feet wide,land slope is 6%and berm slope ratio is 4:1.Upslope berm width is 3.? <br /> _1I/` z S•i-t)/-- 3.0=9.7 ft;height at lower edge of rock layer is 3.0+10 x 0.6=3.6 ft and downslope berm v.. <br /> a 5.26x3.11=18.9ft. <br /> a 305-3 - ci <br />
The URL can be used to link to this page
Your browser does not support the video tag.