Laserfiche WebLink
G. DOWNSLOPE BERM WIDTH slope:_ cover r <br /> 1. If landslope is 1% or more, <br /> subtract rock layer width from adsorption width <br /> (Rods 1' i a <br /> to obtain minimum downslope berm toe Clean sa„d <br /> a ft--IQ_ft feet ahual soil <br /> 2. Calculate Minimum mound Size <br /> a. Determine depth of clean sand fill at upslope Width Do`T`slope Width <br /> upslope edge of rock layer: Ro&Width Absorption width <br /> Separation Y - J,:�_ ft = /- ? feet <br /> b. Add depth of clean sand for separation (2a) <br /> at upslope edge, depth of rock layer(1 foot) to depth of cover <br /> (1 foot) to find the mound height at the upslope edge of rock layer; <br /> •3 ft+'1ft+ 1ft= '1.3 feet <br /> c. Enter table with landslope and upslope bermuPsl°pe Width . <br /> ratio. Select berm multiplier of 3.33 --�- <br /> d. Multiply berm multiplier b upslope mound ups"rrda,: yY. `Bed ''4= ' '.:`u�l°P``"'°>t� <br /> P YY �- o.. . 'nr�l� 10 <br /> height to find upslope berm width: > , �,� <br /> 3.3 x 3_33 _ 1.�_feet T <br /> e. Multiply rock layer width by <br /> landslope to determine drop in elevation; �° Dai s>ope Width <br /> Absorption Wad <br /> /fl x_,5-216= 100= r feet <br /> f. Add depth of clean sand for slope <br /> TOW Length G Ft <br /> difference(2e)at downslope edge,to <br /> the mound height at the upslope edge <br /> of rock layer(2b)to find the downslope height; <br /> -U ft+_-<' ft= 3. 8- feet <br /> g. Enter table with landslope and downslope berm ratio. Select <br /> berm multiplier of S,a v <br /> IL Multiply berm multiplier by downslope mound height to get <br /> downslope berm width: <br /> 3. - x-r= 15 feet BntM SLOPE MULT1PL M <br /> i. Compare the values of step G.1 17 <br /> and Step G.2h P) _ SbM La" DOWNSLOPE UPSLOPE <br /> berm=Mprms uriotis berm inuMpHas ra<.>ximis <br /> Select the greater of the two values as the in bet m slope nWas berm AW ratios <br /> downslope berm width; /9 feet <br /> j. Total mound width is the sum of 4 5 4 5 7 <br /> upslope berm(G.2d) 0 3.0 a:o 5.0 6.0 7.0 3.0 4.0 5.0 6.0 7.0 8.0 <br /> t 3.09 4.17 5.26 6.38 7.53 2.91 3.85 4.76 5.66 6.54 7.41 <br /> width plus rock layer width (D.2) 2 3.19 4.35 5.56 6.82 8.14 2.83 3.70 4.54 5.36 6.14 6.90 <br /> plus downslope berm width(G.2i); 3 3.30 4.54 5.88 7.32 8.86 2.75 3.57 4.35 5.08 5.79 6.45 <br /> 11 ft+1Q_ft+ jj-- ft = _Y feet 4 3.41 4.76 6.25 7.89 9.72 2.68 3.45 4.17 4.84 5.46 6.06 <br /> k. Total mound length is the sum of upslope 5 3.53 <s.D 6.67 8.57 10.77 2.61 3.33 4.00 4.62 5.19 5.71 <br /> berm width(G.2d) plus rock layer length(D.3) 6 3.66 5.26 7.14 9.38 12.07 2.54 3.23 3.85 4.41 4.93 5.41 <br /> plus upslope berm width (G.2d); 7 3.80 5.56 7.69 10.34 13.73 2.48 3.12 3.70 4.23 4.70 5.13 <br /> e�J_ft+ -31- ft+I- ft = 40 feet 8 3.95 5.88 8.33 11.54 15.91 2.42 3.03 3.57 4.05 4.49 4.88 <br /> Wre-/S 2 f 9 4.11 6.25 9.09 13.04 18.92 2.36 2.94 3.45 3.90 4.30 4.65 <br /> 10 4.29 6.67 10.00 15.00 23.33 2.31 2.86 3.33 3.75 4.12 4A4 <br /> Final Dimensions. It 4.48 7.14 11.11 17.65 30.43 2.26 2.78 3.23 3.61 3.95 4.26 <br /> 12 4.69 7.69 12.50 21.43 43.75 2.21 2.70 3.12 3.49 3.80 4.08 <br /> Uwn `1 o X o <br />