My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-2748 - new septic
Orono
>
Property Files
>
Street Address
>
W
>
Watertown Road
>
3940 Watertown Road - 32-118-23-32-0001
>
Septic
>
2000-2748 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:40:29 PM
Creation date
11/4/2019 2:09:56 PM
Metadata
Fields
Template:
x Address Old
House Number
3940
Street Name
Watertown
Street Type
Road
Address
3940 Watertown Road
Document Type
Septic
PIN
3211823320001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUMP SELECTION PROCEDURE <br /> A. Determine pump capacity: <br /> Gravity Distribution <br /> 1. Minimum suggested is 20 gpm <br /> 2. Maximum suggested is 45 gpm <br /> Perforation Discharges in GPM <br /> Pressure Distibution Head Perforation diameter <br /> feet inches <br /> 3. a. Select number of perforated laterals 3 7/32 1/4 <br /> b. Select perforation spacing= 3 feet. 1.0a 0.56 0.74 <br /> C. Subtract 2 ft. from the rock layer length. 1.5 0.69 0.90 <br /> ���,-2 ft.=3 z ob o.fso 1.04 <br /> -��feet. <br /> d. Determine the number of spaces between perforations. a Use 1.0 foot single homes. <br /> Length perf.spacing=71- ft.+ 3 ft. = /,t_spaces b Use 2.0 feet for anything else. <br /> e. J.N- spaces+1 =z_perforationstlateral <br /> f. Multiply perforations per lateral b number of laterals to <br /> gee total number of perforations. x perforations. <br /> g. 7W x�= gpm. <br /> SELECTED PUMP CAPACITY _gpm <br /> B.Determine head requirements: <br /> 1. Elevation difference between pump and point of discharge. <br /> -9feet <br /> 2. If pumping to a pressure distribution system,five feet for pressure <br /> required at manifold if gravity system,zero. <br /> _'feet TOW>xa� <br /> Friction loss <br /> a. Enter friction loss table with gpm and pipe diameter. Ek„abm <br /> Didskasumm <br /> Read friction loss in feet per 100 feet from table(F-14). pipe <br /> F.L._ I SS' ft./100 ft of pipe - - - <br /> b. Determine total pipe length from pump to discharge ------------ - - --- ----- ---- <br /> point. Estimate by adding 25 percent to pipe length for fitting <br /> loss,or use a fitting loss chart(F-15 feet). , <br /> Equivalent pipe length-1.25 times pipe length= <br /> Ibis- x 1.25= 13r feet Friction Loss in Plastic Pipe <br /> c. Calculate total friction loss by multiplying Nominal <br /> friction loss in ft/100 ft by equivalent pipe length. pipe dial <br /> Total friction loss= /3S x /S� +100= a feet <br /> 4. Total head required is the sum of elevation difference, HOgpm 1S" 2" 3" <br /> special head requirements,and total friction loss. <br /> ' ' 20 2.47 0.73 0.11 <br /> + + a 25 3.73 1 0.16 <br /> (1) (2) (3c) 30 5.23 1.55 0.23 <br /> 35 6.% 0.30 <br /> 40 8.91 2.64 0.39 <br /> TOTAL HEAD --q1 feet 45 11.07 3.28 0.48 <br /> 50 13.46 3.99 0.58 <br /> C. Pump selection 60 560 0.82 <br /> 65 6.48 0.95 <br /> 70 1 1 7.44 1 1.09 <br /> 1. A pump must be selected to deliver at least <br /> �` _gpm (Step A)with at least 2_ feet of total head (Step B). <br />