Laserfiche WebLink
AGENDA ITEM <br />LOAQ'?�'\Item No.: 7 Date: May 28, 2019 <br />Item Description: 2020 Street Maintenance Planning and Engineering <br />Gti Presenter: Adam T. Edwards Agenda Consent Agenda <br />sxo4�' Public Works Director/City Engineer Section: <br />1. Purpose. The purpose of this action item is to gain council approval to commence the planning and <br />engineering of the 2020 Street Maintenance Project. <br />2. Background. At the April 221, 2019 Council Work Session the Council provided guidance on a way <br />forward for road maintenance funding for road maintenance projects and funding. <br />3. Scope. Planning and engineering will consist of topographic surveying, utility inspections, design, <br />permitting, public input and solicitation of bids for select roads. <br />4. 2020 Recommended Roads. The table below list the streets identified for potential projects in <br />2020with planning level estimates for each project. As refined cost are developed during design and the <br />2020 levy and budget are finalized it may become necessary to defer one or more of the projects until <br />2021 or latter. <br />Street <br />Pavement <br />Estimated Cost <br />Stormwater Utilities <br />Total <br />Lyman Avenue <br />$ <br />85,100 <br />$ <br />12,765 <br />$ <br />4,255 <br />$ <br />102,120 <br />Smith Avenue <br />$ <br />85,400 <br />$ <br />12,810 <br />$ <br />4,270 <br />$ <br />102,480 <br />Livingston Avenue - Blaine to <br />Shadywood <br />$ <br />174,900 <br />$ <br />26,235 <br />$ <br />8,745 <br />$ <br />209,880 <br />Navarre Avenue <br />$ <br />59,800 <br />$ <br />8,970 <br />$ <br />2,990 <br />$ <br />71,760 <br />Windjammer Lane <br />$ <br />70,400 <br />$ <br />10,560 <br />$ <br />3,520 <br />$ <br />84,480 <br />Casco Circle <br />$ <br />156,300 <br />$ <br />122,065 <br />$ <br />7,815 <br />$ <br />286,180 <br />Rest Point Lane <br />$ <br />37,100 <br />$ <br />5,565 <br />$ <br />1,855 <br />$ <br />44,520 <br />Togo Road <br />$ <br />94,900 <br />$ <br />14,235 <br />$ <br />4,745 <br />$ <br />113,880 <br />Dickenson & Russel Street <br />$ <br />74,100 <br />$ <br />17,114 <br />$ <br />3,705 <br />$ <br />94,919 <br />Fox Street - East of Orono Orchard <br />$ <br />77,800 <br />$ <br />11,670 <br />$ <br />3,890 <br />$ <br />93,360 <br />Briar Street <br />$ <br />56,500 <br />$ <br />8,475 <br />$ <br />2,825 <br />$ <br />67,800 <br />2020 projects TOTAL <br />$ <br />972,300 <br />$ <br />250,464 <br />$ <br />48,615 <br />$1,271,379 <br />5. Engineering and Design Cost. Bolton and Menk has provided a scope of services for a fee estimate <br />not to exceed $156,000 (Exhibit A). <br />6. Funding. The engineering as well as the eventual projects will be funded with a combination of the <br />Pavement Management Fund, Utility Funds, and Stormwater Fund. <br />a. Funding Needs Estimates. <br />Fund <br />Cost Estimate <br />Est. 2020 End of Year Fund Balance <br />Pavement Fund <br />$ 972,300 <br />$ 0 <br />Stormwater Fund <br />$ 250,464 <br />$ 111,114 <br />Utility Funds <br />$ 48,615 <br />$ 1,594,158 <br />Total <br />$ 1,271,379 <br />Prepared By: Reviewed By: Approved By: -Sb) <br />