My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: application to subdivide
Orono
>
Property Files
>
Street Address
>
W
>
Watertown Road
>
3020 Watertown Road - 33-118-23-33-0001
>
Correspondence
>
Re: application to subdivide
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:49:48 PM
Creation date
7/24/2019 1:37:37 PM
Metadata
Fields
Template:
x Address Old
House Number
3020
Street Name
Watertown
Street Type
Road
Address
3020 Watertown Road
Document Type
Correspondence
PIN
3311823330001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY of ORONO <br /> RESOLUTION OF THE CITY COUNCIL <br /> `4kES�I04ti NO. 2948 . <br /> 4. All of the 12 lots shall achieve access via an interior private <br /> roadway. No direct access onto Watertown Road will be allowed for an <br /> individual lot owner. <br /> 5. The applicant has filed the revised preliminary plan with the <br /> Minnehaha Creek Watershed District. All conditions of MCWD permit <br /> must be met by applicant and included with final, drainage, grading and <br /> erosion control plans. <br /> 6. In a memo dated March 13, 1991, Michael P. Gaffron, Assistant <br /> Planning and Zoning Administrator, confirmed .that all 12 lots have <br /> been tested and found to have suitable areas for on-site septic <br /> development. Since that memo, Mr. Gaffron has received verbal <br /> confirmation from the on-site evaluator that drainfields can be <br /> shifted or relocated on Lot 2, Block- 2 and Lot 5, Block 3 to meet the <br /> on-site septic standards of the City. <br /> 7. The proposed configuration and overall design of the lots within <br /> the plat finds that each lot satisfies the lot standards of the RR-1B <br /> Zoning District requiring no variances with the granting of the <br /> approval of this subdivision. Each lot can be developed as a <br /> residential unit without the need for future variances. <br /> 8. The subdivider has provided a future access corridor to the east <br /> and shall be responsible for developing the roadway to the eastern <br /> boundary providing a temporary cul-de-sac. <br /> NOW, THEREFORE BE IT RESOLVED, that based upon one or more of the <br /> findings noted above, the City Council of the City of Orono hereby approves <br /> the revised preliminary plat of Crystal Creek per plat survey dated <br /> February 26, 1991, revised March 18, 1991 by Edward H. Sunde, a registered <br /> land surveyor under the laws of the State of Minnesota of Sunde Land <br /> Surveying, Inc., subject to the following conditions: <br /> Page 2 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.