Laserfiche WebLink
� ��' CITY of ORONO <br /> O :,� O <br /> • � � �;�=� RESOLUTION OF THE CITY COUNCIL <br /> ,'�,� � �Yl ��� �, N0. a� � �. e�T+ � <br /> ti <br /> . '��`9$' Og'�G . <br /> ESfI <br /> 2. The subdividers shall be responsible for installing an 8' wide bike trail along the <br /> east side of Old Crystal Bay Road as shown on plans drafted by Mark Gronberg <br /> of Coffin & Gronberg, Inc., Job No. 93-411 dated March 31, 1994. The City <br /> shall adjust the park dedication fee to reflect the subdivider's cost for constructing <br /> the trail and for the area of the 1,546' long bike trail. <br /> 3. Dedication of drainage and utility easements 5' along all interior lot lines and 10' <br /> along the perimeter boundaries and adjacent to road rights-of-way. <br /> 4. Prior to any site improvements, erosion control as shown on preliminary grading <br /> and drainage plans must be installed and maintained until natural groundcover is <br /> restored. <br /> � 5. Prior to site grading improvements all tested septic sites on the Coffin property <br /> must be fenced off and the following lots in the first phase development of the <br /> • Dickey property must be fenced off: <br /> Lots 1-6, Block 1 <br /> Lots 3-7, Block 2 <br /> 6. Drainfields on Lots 1 and 3, Block 1 to be moved 5' to east to allow for adequate <br /> separation from future bike trail. Applicant to grant trail easement over Old <br /> Crystal Bay Road bike trail along western boundary of Dickey property. <br /> Applicant shall be responsible for constructing Old Crystal Bay Road bike trail <br /> as set forth in trail improvement plans of City of Orono. <br /> �. Well pit must be sealed within Lot 2, Block 2 of the Dickey property. <br /> 8. The following lots have been found to contain protected wetlands not designated <br /> on the City's conservation area maps: <br /> Dickey parcel - Lot 2, Block 1; Lots 3, 4, 5 and 6, Block 2 <br /> Coffm property - L.ots l, 5, 6 and 10 <br /> • Page 4 of 9 <br /> � Fortn5U05 DlskOrom <br />