My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-P04953 - re-roof
Orono
>
Property Files
>
Street Address
>
W
>
Wakefield Road
>
240 Wakefield Road - 36-118-23-31-0011
>
Permits/Inspections
>
2002-P04953 - re-roof
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:02:21 PM
Creation date
7/11/2019 1:59:12 PM
Metadata
Fields
Template:
x Address Old
House Number
240
Street Name
Wakefield
Street Type
Road
Address
240 Wakefield Road
Document Type
Permits/Inspections
PIN
3611823310011
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i} <br /> 4. RE-ROOFING OVER SHAKE <br /> PROCEDURE No. 13 (continued) <br /> INSTALLING GERARD MISSION OR SHAKE TRIM <br /> NOTCH <br /> RAKE y B BACK LIP <br /> RAKE TRIM }' <br /> OVERLAP <br /> q €_ <br /> NAIL POINT .3 <br /> Ti <br /> NAS POINT j ,' <br /> SHEET METAL SCREWS FASCIA <br /> CUT <br /> RIDGE TRIM <br /> RIDGE TRIM <br /> "o <br /> o � <br /> NAIL POINT <br /> NOTCHAREA <br /> x � <br /> F ��L lig I <br /> / / <br /> 'lig i� t� � - - �L � ,�"-' •�, RAKE <br /> RIDGE <br /> NAIL POINT / <br /> MEASUREMENTS <br /> M"Supw POW <br /> RAKE ., <br /> r NAIL POINT <br /> - <br /> PURPOSE RIDGE:(MISSION/SHAKE) D E F <br /> To provide a complete trimmed At the ridge where two rakes meet, the <br /> appearance to the edges of the roof. Gerard trim must be cut and mitered <br /> RAKE:(MISSION TRIM) A-B-C together to seal the rake apex.(See III.) <br /> Starting at the fascia, install the first When installing across the ridge from a <br /> mission trim. This is the only mission trim rake end, fit the first Gerard trim with an <br /> requiring a notch at the back lip. (See III.) end disc attached neatly cut over the two <br /> Install the rest of the mission trim up the rake trims. Ensure that each trim piece fits <br /> rake interlocking and nailing as you go. neatly down onto the Gerard panel(See III.) RAKEt <br /> (See III.) Each piece must sit flush onto the / <br /> Gerard panel. <br /> ) <br /> GERARDO Page 52 0 Gerard Roofing Technologies,2001-03-01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.