Laserfiche WebLink
4. RE-ROOFING OVER SHAKE <br /> PROCEDURE No. 13 (continued) <br /> INSTALLING GERARD MISSION OR SHAKE TRIM <br /> HIP TRIMS\\ <br /> HIP \ <br /> l <br /> A B NAIL POINT <br /> FASCIA _ + <br /> OPrIDNAL CYLINDRICAL DISC <br /> _ V <br /> END FASCIA <br /> D <br /> RIDGE TRIM <br /> CUT E <br /> TRIM <br /> x r r+ <br /> RIDGE RIDGE SHEET METAL SCREWS <br /> C <br /> NAIL POINT <br /> r' HIP \ <br /> NAIL POINT <br /> r <br /> RIDGE <br /> NAIL POINT <br /> d TRIM PROCEDURE(Continued) <br /> a <br /> MEASURE POINT HIP:(MISSION TRIM) <br /> Hip comers at the fascia are finished with <br /> t the double mission end cap,a flat circular <br /> disc,or a half-moon crescent shaped end <br /> piece. (See III.) <br /> The hip/ridge intersections are handled <br /> the same as the rake/ridge intersections. <br /> Q They may be mitered to create a weather- <br /> tight appearance.(See III.) <br /> A For severe weather conditions,it may <br /> be necessary to use a pliable type <br /> Hashing material to provide a <br /> weathertight seal at trim intersections. <br /> It is acceptable to miter the last ridge <br /> trim in a'Vr at the ridge/hip intersection. <br /> Secure with stitch screws or pop rivets <br /> and apply sealant and chip. <br /> Details A-C above apply to Mission and <br /> Shake cap. <br /> ®Gerard Roofing Technologies,2001-03-01 Page 51 <br /> MNERARF <br />