My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-P04953 - re-roof
Orono
>
Property Files
>
Street Address
>
W
>
Wakefield Road
>
240 Wakefield Road - 36-118-23-31-0011
>
Permits/Inspections
>
2002-P04953 - re-roof
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:02:21 PM
Creation date
7/11/2019 1:59:12 PM
Metadata
Fields
Template:
x Address Old
House Number
240
Street Name
Wakefield
Street Type
Road
Address
240 Wakefield Road
Document Type
Permits/Inspections
PIN
3611823310011
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. RE-ROOFING OVER SHAKE <br /> PROCEDURE No. 13 (continued) <br /> INSTALLING GERARD MISSION OR SHAKE TRIM <br /> HIP TRIMS\\ <br /> HIP \ <br /> l <br /> A B NAIL POINT <br /> FASCIA _ + <br /> OPrIDNAL CYLINDRICAL DISC <br /> _ V <br /> END FASCIA <br /> D <br /> RIDGE TRIM <br /> CUT E <br /> TRIM <br /> x r r+ <br /> RIDGE RIDGE SHEET METAL SCREWS <br /> C <br /> NAIL POINT <br /> r' HIP \ <br /> NAIL POINT <br /> r <br /> RIDGE <br /> NAIL POINT <br /> d TRIM PROCEDURE(Continued) <br /> a <br /> MEASURE POINT HIP:(MISSION TRIM) <br /> Hip comers at the fascia are finished with <br /> t the double mission end cap,a flat circular <br /> disc,or a half-moon crescent shaped end <br /> piece. (See III.) <br /> The hip/ridge intersections are handled <br /> the same as the rake/ridge intersections. <br /> Q They may be mitered to create a weather- <br /> tight appearance.(See III.) <br /> A For severe weather conditions,it may <br /> be necessary to use a pliable type <br /> Hashing material to provide a <br /> weathertight seal at trim intersections. <br /> It is acceptable to miter the last ridge <br /> trim in a'Vr at the ridge/hip intersection. <br /> Secure with stitch screws or pop rivets <br /> and apply sealant and chip. <br /> Details A-C above apply to Mission and <br /> Shake cap. <br /> ®Gerard Roofing Technologies,2001-03-01 Page 51 <br /> MNERARF <br />
The URL can be used to link to this page
Your browser does not support the video tag.