Laserfiche WebLink
4. RE-ROOFING OVER SHAKE <br /> PROCEDURE No. 13 (continued) <br /> INSTALLING GERARD MISSION OR SHAKE TRIM <br /> A RAKE <br /> B tC <br /> RAKE TRIM <br /> BEND LINE <br /> CUT UNE s/ <br /> 0 <br /> SHEET METAL SCREWS FASCIA <br /> D RIDGE <br /> CUT TRIM SECTION <br /> / NAIL POINT <br /> / E RIDGE TRIM <br /> RIDGE SHEET METAL SCREWS <br /> i <br /> ail <br /> il�ll NAIL POINT <br /> RIDGE <br /> NAIL POINT <br /> MEASURE POINT <br /> ."' TRIM PROCEDURE <br /> HIP:(SHAKE CAP)D-E-F <br /> Hip comers at the fascia are finished with <br /> `Z the double trim end cap,a flat circular <br /> disc,or a half-moon crescent shaped end <br /> piece. (See III.for Mission trim) <br /> The hip/ridge intersections are handled <br /> PURPOSE At the ridge where two rakes meet, the the same as the rake/ridge intersections. <br /> To provide a complete trimmed Gerard trim must be cut and mitered They may be mitered to create a weather- <br /> appearance to the edges of the roof. together to seal the rake apex.(See III.) tight appearance.(See III.) <br /> RAKE:(SHAKE CAP) A-B-C When installing across the ridge from a 0 For severe weather conditions,it may <br /> be necessary to use a pliable type <br /> Starting at the fascia,install the first shake rake end, fit the first Gerard trim with an flashing material to provide a <br /> cap. (See III.) Install the rest of the trim up end disc attached neatly cut over the two weathertight seal at trim intersections. <br /> the rake interlocking and nailing as you go. rake trims. Ensure that each trim piece fits h is acceptable to miter the last ridge <br /> (See 111.) Each piece must sit flush onto the neatly down onto the Gerard panel(See 111.) trim in a'V'at the ridge/hip intersection. <br /> Gerard panel. Secure with stitch screws or pop rivets <br /> and apply sealant and chip. <br /> 0 Gerard Rooting Technologies,2001-03-01 Page 53 MWERARW <br />