My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-P04953 - re-roof
Orono
>
Property Files
>
Street Address
>
W
>
Wakefield Road
>
240 Wakefield Road - 36-118-23-31-0011
>
Permits/Inspections
>
2002-P04953 - re-roof
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:02:21 PM
Creation date
7/11/2019 1:59:12 PM
Metadata
Fields
Template:
x Address Old
House Number
240
Street Name
Wakefield
Street Type
Road
Address
240 Wakefield Road
Document Type
Permits/Inspections
PIN
3611823310011
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7� <br /> 4. RE-ROOFING OVER SHAKE <br /> PROCEDURE No. 11 <br /> INSTALLING RIDGE AND RAKE CUT PANELS <br /> RIDGEM <br /> O <br /> Rf Po//VT O MEASURE POINT <br /> UPTURN <br /> BEND UNE <br /> BEND LINE 2"UPTURN <br /> (50MP4 •� <br /> CUT UNE <br /> PURPOSE <br /> To provide a custom-fitted panel to the last <br /> course at the ridge and to the rake edge. ® ALWAYS BEND the ridge cut panels <br /> PROCEDURE first, then cut off the excess along the D) Be careful not to push the back of the <br /> previously marked cut line. Use the Gerard ridge cut panel down. The ridge cut panel <br /> The short course at the ridge and the full panel bender attachment.(See 111.) must be in the same plane as the rest of <br /> sections at the rake need to be measured, the roof. Nail the ridge cut through the 2' <br /> cut,and bent to fit. After all ridge panels are cut and bent, (50 mm)tum-up. <br /> RIDGE CUT PANEL install them as follows: <br /> O To obtain the bend line, measure the E) At hips and rakes,the ridge cut panel is <br /> distance from the back lip of the panel A) Position the ridge cut panel in place. turned up the same as the full panels. At <br /> already laid to the ridge board. This is Starting at one end of the ridge,nail the left valleys,the ridge cut panel is turned down. <br /> usually taken at the same point where the or right side first. <br /> nail penetrates the panel. Deduct 1h'(12.5 A Always deduct 112" (125 mm) from <br /> mm) from the measurement taken and B)Nail the other end by bowing the panel ridge panel measurements. This will <br /> record. up in the center to make it line up with the allow ridges to fit Shake panels are cut <br /> ' ®Apply measurements to full panels,mark panel beneath. & bent in the same manner as for tile. <br /> the full panel at both ends. To obtain the C) The middle of the panel can now be (Continued) <br /> cut line, scribe a line 2' (50 mm) past the nailed, in the same pattern used on field <br /> bend line. panels. <br /> 0 Gerard Roofing Technologies,2001-03-01 Page 45 M.3 GERAR[r <br />
The URL can be used to link to this page
Your browser does not support the video tag.