Laserfiche WebLink
4. RE-ROOFING OVER SHAKE <br /> PROCEDURE No. 11 (continued) <br /> INSTALLING RIDGE AND RAKE CUT PANELS <br /> RIDGE UPTURN ^r�LINE <br /> O RIDGE <br /> BEND LINE <br /> ' 1 <br /> i <br /> : 1 <br /> I 1. <br /> ' � I <br /> RAKE UPTURN CUT LINE 1"p5wA BACK BEND LINE ' O <br /> FROM RAKE EDGE C- <br /> RAKE <br /> is <br /> Lp' � <br /> i <br /> I� I TAPE MEASURE O O <br /> i <br /> 1 <br /> CUT LINE r.—BEND LINE O <br /> i e <br /> i' <br /> � RIDGE BATTEN C <br /> I` <br /> RAKE BATTEN \. <br /> +.I <br /> RAKE PANEL PROCEDURE O To obtain the bend line, measure the Refer to Special Installation Procedures <br /> space from the rake edge to the Gerard section, "Roof-to-Wall" flashing, when <br /> Shake panels are cut&bent in the same panel. using Gerard Tile Pan Metal as the Rake <br /> manner as for tile. build-up is not required and the framing is <br /> ®Apply the measurements to the panels. different. <br /> When measuring the rake areas, it is (Add 1"(25 mm)to marks for the cut line.) <br /> important to ensure that each rake section ® Cut and bend up on the previously <br /> will allow water to flow down onto the next marked lines.(See 111.) <br /> rake piece. This creates a channel for the A Always deduct 1120 (125 mm) from <br /> water to drain from the roof and prevent O The installation of the rake panels is edge panel measurements. This will , <br /> leaks. similar to full panel. Be certain that each allow ridges to fit Shake panels are cu[ <br /> rake section drains into the one below. & bent in the same manner as for We. <br /> %— <br /> GERAR[r Page 46 0 Gerard Roofing Technologies,2001-03-01 <br />