My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-P04953 - re-roof
Orono
>
Property Files
>
Street Address
>
W
>
Wakefield Road
>
240 Wakefield Road - 36-118-23-31-0011
>
Permits/Inspections
>
2002-P04953 - re-roof
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:02:21 PM
Creation date
7/11/2019 1:59:12 PM
Metadata
Fields
Template:
x Address Old
House Number
240
Street Name
Wakefield
Street Type
Road
Address
240 Wakefield Road
Document Type
Permits/Inspections
PIN
3611823310011
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. RE-ROOFING OVER SHAKE <br /> PROCEDURE No. 11 (continued) <br /> INSTALLING RIDGE AND RAKE CUT PANELS <br /> RIDGE UPTURN ^r�LINE <br /> O RIDGE <br /> BEND LINE <br /> ' 1 <br /> i <br /> : 1 <br /> I 1. <br /> ' � I <br /> RAKE UPTURN CUT LINE 1"p5wA BACK BEND LINE ' O <br /> FROM RAKE EDGE C- <br /> RAKE <br /> is <br /> Lp' � <br /> i <br /> I� I TAPE MEASURE O O <br /> i <br /> 1 <br /> CUT LINE r.—BEND LINE O <br /> i e <br /> i' <br /> � RIDGE BATTEN C <br /> I` <br /> RAKE BATTEN \. <br /> +.I <br /> RAKE PANEL PROCEDURE O To obtain the bend line, measure the Refer to Special Installation Procedures <br /> space from the rake edge to the Gerard section, "Roof-to-Wall" flashing, when <br /> Shake panels are cut&bent in the same panel. using Gerard Tile Pan Metal as the Rake <br /> manner as for tile. build-up is not required and the framing is <br /> ®Apply the measurements to the panels. different. <br /> When measuring the rake areas, it is (Add 1"(25 mm)to marks for the cut line.) <br /> important to ensure that each rake section ® Cut and bend up on the previously <br /> will allow water to flow down onto the next marked lines.(See 111.) <br /> rake piece. This creates a channel for the A Always deduct 1120 (125 mm) from <br /> water to drain from the roof and prevent O The installation of the rake panels is edge panel measurements. This will , <br /> leaks. similar to full panel. Be certain that each allow ridges to fit Shake panels are cu[ <br /> rake section drains into the one below. & bent in the same manner as for We. <br /> %— <br /> GERAR[r Page 46 0 Gerard Roofing Technologies,2001-03-01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.