Laserfiche WebLink
4. RE-ROOFING OVER SHAKE <br /> PROCEDURE No. 10 (continued) <br /> INSTALLING VALLEY AND HIP CUT SECTIONS OF GERARD PANELS <br /> TOP MEASUREMENT <br /> RIDGE O <br /> _ MARKING PANTS <br /> BOTTOM (' MM) <br /> MEASUREMENT <br /> TAPE MEASURE-----► 2- <br /> I- <br /> ca+ i l <br /> i 2- (50rm) <br /> CUT LINE <br /> (12.s W) ` <br /> HIP — BEND LINE <br /> JV2"UPTURN(50nKn) <br /> d <br /> RIDGE <br /> TOP MEASUREMENT <br /> r ; <br /> SII <br /> BOTTOM <br /> MEASUREMENT ; 2` (50mm) <br /> 1/2 <br /> HIP © \ CUT LINE <br /> L BEND LINE <br /> P ® 2'UPTURN (50mm) <br /> / (12.5nMn) <br /> i � <br /> S <br /> HIP PROCEDURE <br /> O To obtain the bend line, measuring is hip cut panel with a 2' (50 mm) uptum. <br /> done in the same manner as for valleyRepeat this <br /> pe process for the other side of <br /> panels. Starting at the top of the hip, the hip. <br /> create a measurement list working down <br /> the roof. ® Install hip cuts from the bottom up. AAhvays deduct lbu (125 mm)from hip <br /> Nailing is the same as for field panels. panel measurements as this will aid in <br /> ® After cutting the marked panels, bend Nails must penetrate into a batten and also installation. Shake ' <br /> r pe panels are cut & <br /> them up in the Gerard bender creating a into the hip board. bent in the same manner as for til& <br /> t <br /> i <br /> GERARDO Page 44 ®Gerard Roofing Technologies.2001-03-01 <br />