Laserfiche WebLink
4. RE-ROOFING OVER SHAKE <br /> PROCEDURE No. 10 (continued) <br /> INSTALLING VALLEY AND HIP CUT SECTIONS OF GERARD PANELS <br /> STRING LINE RIDGE <br /> \ r <br /> TAPE MEASURE TOP MEASUREMENT <br /> BOTTOM <br /> MEASUREMENT <br /> CUT LINE Y BEND LINE <br /> © VALLEY <br /> RAKE UPTURN i <br /> DOWNTURN01 <br /> RIDGE <br /> • <br /> 4 <br /> ` TOP MEASUREMENT <br /> CUT LINE 2' BEND LINE O <br /> L <br /> VALLEY / / BOTTOM <br /> BEND LINE �! MEASUREMENT <br /> DOWNTURN <br /> VALLEY PROCEDURE ®To obtain the cut line, measure 2' (50 ®Install valley panels from the bottom up. <br /> mm)past the bend line. Remember to keep them in order. Pay <br /> O Starting at the top of the valley, each careful attention to nailing. Panel nails <br /> panel row requires two measurements to O Cut the panels with the Gerard cutter, must penetrate a batten. <br /> obtain the bend line, one at the top and then bend them in the Gerard bender by <br /> one at the bottom of the panel. Measure lining up the marks and bending down <br /> from the rib of the tile laid nearest the valley creating a valley cut with a 2' (50 mm) 0 Shake panels are cut & bent in the <br /> to the center-line of the valley. Record downturn. same manner as for tile. <br /> measurements for each row, continuing <br /> down the roof to the fascia. (See III.) Cut, bend, and stack each panel, keeping For open valleys, the bend lines are <br /> them in order. These are for one side of measured only to the side wall of the <br /> ®Apply measurements taken to full panels the valley. Repeat this process for the valley metal,or to the side of the double <br /> by marking the diagonal bend and cut lines other side, measuring to the valley panels Vee, diverfers on 180 (450 mm) wide <br /> onto the panels. (See III.) just installed. Valleys- <br /> *Gerard Roofing Technologies,2001-0s-01 Page 43 GERARD <br />