Laserfiche WebLink
4. RE-ROOFING OVER SHAKE <br /> PROCEDURE No. 10 (continued) <br /> INSTALLING VALLEY AND HIP CUT SECTIONS OF GERARD PANELS <br /> 41Vd - <br /> VALLEY CUTS HIP CUTS <br /> Y <br /> BEND LINE <br /> I <br /> i <br /> i <br /> CUT LINE <br /> ,I. <br /> BEND LINE <br /> j. <br /> 'j <br /> HIPS <br /> BEND UP <br /> �J <br /> VALLEYS <br /> BEND DOWN I <br /> PURPOSE <br /> To provide weather security at the valley <br /> 'i and hip areas. <br /> PROCEDURE <br /> Try to use two cut pieces per full panel. Gerard shake only has two measuring ribs, <br /> The triangular shaped hip and valley which are on either end of the panel. <br /> sections where no panels have been laid Measurements are taken from these ribs. <br /> now need to be measured, cut and bent, <br /> to fit the roof. It is important to remember p Shake panels are cut/bent In the same <br /> to record which side of the panel you manner as for tile. At times it may be <br /> measured from on the roof. This will necessary to measure from the center <br /> provide a cut with the machine edge on the of the panel. This is done only when <br /> P both sides(ends)are bent to fit between Contin <br /> correct side of the anal. The Gerard the (Continued) <br /> has eight (8) measuring ribs; all a hip and valley,as in"uppers" <br /> a <br /> measurements are taken from these ribs. <br /> GERAR[r Page 42 ®drab Roofing Technologies,2W1-0"1 <br /> .. <br /> is <br />