My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-P04953 - re-roof
Orono
>
Property Files
>
Street Address
>
W
>
Wakefield Road
>
240 Wakefield Road - 36-118-23-31-0011
>
Permits/Inspections
>
2002-P04953 - re-roof
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:02:21 PM
Creation date
7/11/2019 1:59:12 PM
Metadata
Fields
Template:
x Address Old
House Number
240
Street Name
Wakefield
Street Type
Road
Address
240 Wakefield Road
Document Type
Permits/Inspections
PIN
3611823310011
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. RE-ROOFING OVER SHAKE <br /> PROCEDURE No. 9 <br /> INSTALLING AND NAILING GERARD TILE PANELS AMC <br /> CENTER OF UPPER TILE <br /> I I "SPECIAL NOTE:Due to die differences, <br /> batten spacing is different for Tile than Shake. <br /> Tile:14 3/tt'(365 mm) <br /> END OF TILE Shake:14 9hs'(370 mm) <br /> Be sure to position the battens to fit the panel <br /> I <br /> OVERLAPINTERLOCK profile you are installing. <br /> END OF TILE <br /> PURPOSE <br /> To provide a new roof covering securely <br /> fastened to the existing roof. <br /> LAYING GERARD SHAKE <br /> The end lap modules on either outer edge <br /> interlock horizontally in the same manner <br /> as Gerard Tile. Adjacent higher and lower <br /> courses of shake panels interlock by <br /> I staggering each course by one-half of a <br /> 3 panel. (See III.) This stagger provides the <br /> random patterned appearance of natural <br /> Z 3 wood shake. The Gerard shake panels <br /> 4 cannot be laid straight or randomly <br /> staggered. <br /> 6 <br /> 6 NAILING GERARD SHAKE <br /> The Gerard shake is nailed in the same <br /> manner as Gerard Tile,through the down- <br /> 6 turned nose at an angle. Panel fasteners <br /> must have full attachment into the battens. <br /> IF The shake has four recessed and five <br /> raised shake impressions,nailing along the <br /> nose is always performed on a raised <br /> section. (See 111.) There are five (5) nails <br /> per shake panel. <br /> '! RAKE/GABLE EDGE <br /> Due to the shake panels half-panel <br /> stagger, it is necessary to tum up all rake <br /> edges a 14'(12.5mm). Each panel must be <br /> able to carry water down onto the next <br /> panel,so water drains out to the fascia. If <br /> Gerard Tile Pan Metal is used, the 14' <br /> (12.5mm)bend-up is not required. <br /> A(SHAKE ONL17 <br /> To prevent slipping of the courses,tack <br /> every other course as it is laid.Pay close <br /> attention to panel alignment. Panels <br /> must be staggered by half a panel. <br /> i <br /> d <br /> s <br /> s <br /> d <br /> d <br /> 0 GERARD® Page 40 0 Gerard Roofing Technologies.2001-03-01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.