Laserfiche WebLink
4. RE-ROOFING OVER SHAKE , <br /> PROCEDURE No. 9 (continued) <br /> INSTALLING AND NAILING GERARD TILE PANELS <br /> � TACK NAIL <br /> 4ROWS <br /> i <br /> 101 <br /> NAIL POINT <br /> e <br /> jam <br /> 0 <br /> t <br /> 8 O <br /> MAIN WATER CHANNEL <br /> ` KEEP NAILS OUT OF <br /> o ` MAIN WATER CHANNEL <br /> 8 <br /> NAIL POINT <br /> PROCEDURE(continued) <br /> ®Lay a minimum of four rows of tile from On all rake edges,the file must be turned <br /> the ridge before nailing. The tile nailing up against the rake batten. Leave a space <br /> point is critical as the Gerard System approximately 2 pans for a cut and bent <br /> utilizes exposed nailing. The nail point is section to be fitted later. <br /> through the nose at an angle. Panel At chimneys,skylights,etc.,lay all full tiles <br /> fasteners must have full attachment into round the protrusion. Tack the tile in <br /> the battens. Nail the tiles by standing on these areas. <br /> them facing down the roof. (See III.) <br /> When roofing around a vent pipe, cut the <br /> ' <br /> full tile around the pipe; it will be flashed©The last the course at the fascia is face A Keep nails 2 pans away from areas <br /> nailed. This is the ONLYlace you should later. Do not nail around the pipe as this <br /> P Y where cut sections will be fitted. This <br /> face nail the tile. (See III.) The bottom row will prevent installation of the flashing eases installation of the cut pieces. <br /> nails must be sealed and chipped. material later. For details,refer to"Vent Insert missing nails during cut section <br /> Flashing"section,of this manual. installation. <br /> 0 Gerard Roofing Technologies,2001-M-01 Page 39 MUGERABIr <br />