Laserfiche WebLink
-4. RE-ROOFING OVER SHAKE <br /> PROCEDURE No. 9 <br /> INSTALLING AND NAILING GERARD TILE PANELS <br /> (1 <br /> (15omm) <br /> O <br /> g- /�: oMOnarnITEuacc <br /> (150mm) MainWATER CHANNEL, <br /> -. O OVERLAP INTERIM <br /> —._�_ MUM rarer CHANNEL <br /> 2• 5EMM1 <br /> PURPOSE panels first,then filling in with cut sections panels on a hip or valley roof is <br /> To provide a new roof covering securely later. approximately 6' (150 mm) in from the <br /> fastened to the existing roof. O Position the panels by lining up the closest part of the panel to the hip or <br /> corrugations and lapping correctly across valley. Gerard Tile panels can be <br /> PROCEDURE the first full row nearest the ridge. Keeping staggered in multiples of(1) one tile pan, <br /> Gerard panels must be installed from the the panels against the batten, tack nail every 6' (150mm) or more. Make certain <br /> RIDGE DOWN due to their unique them through the top flange of the panel. that panel ribs are aligned. <br /> interlocking design. Exercise extreme care (� 111.) Either cut and bend a panel or <br /> when interlocking design. <br /> the leave a gap on either end to allow for (continued) <br /> panels. See the measuring,cutting and bending at the rake <br /> 'Special Installation Procedures' section areas. <br /> for an easy way to line up the panels. <br /> Panels may be lapped either left to right or ® When laying panels on hip and valley <br /> right to left. Try to lap the panels away roofs,the procedure is the same as above. 0 Always tack panels that extend 2 pans <br /> from discharging valleys or the normal line The stagger pattern, however, is or more past the row above. This <br /> of sight. Proceed by installing all full automatically created by the hip or valley prevents slipping of the panel from the <br /> angle. The starting point when laying battens. <br /> RGERABIr Page 38 0 Gerard Roofing Technologies,2001-03-01 <br />