My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-P04953 - re-roof
Orono
>
Property Files
>
Street Address
>
W
>
Wakefield Road
>
240 Wakefield Road - 36-118-23-31-0011
>
Permits/Inspections
>
2002-P04953 - re-roof
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:02:21 PM
Creation date
7/11/2019 1:59:12 PM
Metadata
Fields
Template:
x Address Old
House Number
240
Street Name
Wakefield
Street Type
Road
Address
240 Wakefield Road
Document Type
Permits/Inspections
PIN
3611823310011
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-4. RE-ROOFING OVER SHAKE <br /> PROCEDURE No. 9 <br /> INSTALLING AND NAILING GERARD TILE PANELS <br /> (1 <br /> (15omm) <br /> O <br /> g- /�: oMOnarnITEuacc <br /> (150mm) MainWATER CHANNEL, <br /> -. O OVERLAP INTERIM <br /> —._�_ MUM rarer CHANNEL <br /> 2• 5EMM1 <br /> PURPOSE panels first,then filling in with cut sections panels on a hip or valley roof is <br /> To provide a new roof covering securely later. approximately 6' (150 mm) in from the <br /> fastened to the existing roof. O Position the panels by lining up the closest part of the panel to the hip or <br /> corrugations and lapping correctly across valley. Gerard Tile panels can be <br /> PROCEDURE the first full row nearest the ridge. Keeping staggered in multiples of(1) one tile pan, <br /> Gerard panels must be installed from the the panels against the batten, tack nail every 6' (150mm) or more. Make certain <br /> RIDGE DOWN due to their unique them through the top flange of the panel. that panel ribs are aligned. <br /> interlocking design. Exercise extreme care (� 111.) Either cut and bend a panel or <br /> when interlocking design. <br /> the leave a gap on either end to allow for (continued) <br /> panels. See the measuring,cutting and bending at the rake <br /> 'Special Installation Procedures' section areas. <br /> for an easy way to line up the panels. <br /> Panels may be lapped either left to right or ® When laying panels on hip and valley <br /> right to left. Try to lap the panels away roofs,the procedure is the same as above. 0 Always tack panels that extend 2 pans <br /> from discharging valleys or the normal line The stagger pattern, however, is or more past the row above. This <br /> of sight. Proceed by installing all full automatically created by the hip or valley prevents slipping of the panel from the <br /> angle. The starting point when laying battens. <br /> RGERABIr Page 38 0 Gerard Roofing Technologies,2001-03-01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.