My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-009348 - new septic system
Orono
>
Property Files
>
Street Address
>
T
>
Truffula Trail
>
125 Truffula Trail - 33-118-23-44-0041
>
Septic
>
1997-009348 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:53:17 PM
Creation date
7/1/2019 10:24:02 AM
Metadata
Fields
Template:
x Address Old
House Number
125
Street Name
Truffula
Street Type
Trail
Address
125 Truffula Trail
Document Type
Septic
PIN
3311823440041
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br /> G. DOWNSLOPE DIKE WIDTH FYI q, t <br /> 1. If landslope is 3% or more, subtract rock layer width from <br /> adsorption width to obtain minimum downslope dike toe <br /> ft-1_ ft =Meet -3 <br /> 2. Calculate Minimum mound size based on geometery: <br /> a. Determine depth of clean sand fill at upslope edge of rock <br /> layer: Separation : 3 ft-/s' = 4 S' feet <br /> b. Add depth of clean sand for separation (2a) j i root cover y, 7,61 <br /> at upslope edge,depth of rock layer (1 foot) tAoc Ro ea <br /> Separation feet <br /> to depth of cover (1 foot) to find the <br /> , <br /> � siop*cirrerencQc <br /> mound height at the upslope ed e o rock UPSIope W10tn <br /> .� ft + Ift + lit =-�feet - r feel Rock oleo wion <br /> c. Enter table with landslope and upslope dike ratio. . 3-feet Downslope fW m <br /> Select dike multiplier of -xvs, <br /> d. Multiply dike multiplier by upslope mound height <br /> to find upslope dike width;L x 3151- =j'Z feet <br /> e. Multiply rock layer width by landslopto determine drop <br /> in elevation; Slope Difference <br /> lo_x y % -1- 100 =0 1/ feet <br /> f. Add depth of clean sand for slope difference (2e) at <br /> downslope edge, to the mound height at the upslope edge <br /> of rock layer (2b) to find the downslope height; <br /> ft + 0-Oft = 3-F feet <br /> g. Enter table with landslope and downslope dike ratio. <br /> Select dike multiplier of 7� <br /> h. Multiply dike multiplier by downslope mound he' ht(2f) <br /> to get downslope dike width:'f Z- x 3.9 =Meet = <br /> i. Compare the values of step G.1 and Step G.2h Select the <br /> greater of the two values as the downslope dike width; <br /> feet y <br /> j. Total mound width is the sum of ,,a w,aln <br /> upslope dike (G.2e) width plus rock Lr�r� <br /> RocK ado w10Cn <br /> layer width (D.2) plus �� <br /> _�. tort <br /> downslope dike width(G.Zi) W1 Wig <br /> a � . <br /> feet >.... � Y y Lp:�-fop: <br /> ft+ ft <br /> Jr) + _ft - �. �,feet <br /> k. Total mound length is the sum of <br /> �OwnSlOpe w10tn <br /> upslope dike width (G-2e) plus rock layer ..�..� <br /> length (D.3) plus upslope dike width (G-2e); <br /> ft+ ft + z ft = Z�feet <br /> 4- 13 # ........ <br /> TotalL@Og[n C� <br /> owns ope p,ope 1 <br /> 3:1 41 51 61 7:1 3.1 4:1 5:l &1 71 61 <br /> 14&lop <br /> 039 4.0 S.0 60 7.0 30 4A SA f.0 7.0 0.0 <br /> .1 399 4.175.:6 630 7.53 291 3.55 4.76 5.66 656 7.41 <br /> 2 3.19 435 5J, 6x2 L14 263 4.70 456 536 6.14 690 <br /> 330 �� S.b6 732 5.66 L75 6,15 5.00 5.79 695 <br /> 791 `L76�1 625 7.69 9.72 265 ].45 4.17 4.66 346 696 <br /> S 351 5.00 667 657 10.77 2.61 6.00 4.61 5.19 S71 <br /> 6 166 5.26 7.14 936 1297 256 3.23 i6S 4.41 4.93 SAI <br /> 7 3x0 556 7.69 1034 1323 246 3.12 3.70 4.23 4.70 S.13 <br /> 6 3.95 5.40 5.11 1154 1591 142 3.03 357 4.65 4M 4.60 <br /> 9 4.11 6.S 9.09 13.04 16.92 236 2.94 3.45 3.90 430 446 <br /> 10 419 667 10.0 15.00 2133 231 266 311 17S 4.12 4M <br /> 11 4.11 714 11.11 17.6s 30.43 2.26 275 IM 3.61 2.95 636 <br /> 17 4.u9 769 1250 21.43 4175 1 2.21 270 332 149 140 4x* <br />
The URL can be used to link to this page
Your browser does not support the video tag.