My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01173 - addn/remodel/repair
Orono
>
Property Files
>
Street Address
>
T
>
Tonkawa Road
>
1315 Tonkawa Road - 08-117-23-42-0012
>
Permits/Inspections
>
2017-01173 - addn/remodel/repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:47:24 PM
Creation date
6/26/2019 11:58:55 AM
Metadata
Fields
Template:
x Address Old
House Number
1315
Street Name
Tonkawa
Street Type
Road
Address
1315 Tonkawa Rd
Document Type
Permits/Inspections
PIN
0811723420012
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
paquetteconstruction86@gmail.com 793 Boulder Drive <br /> www.paquetteconstruction.com Orono, MN 55356 <br /> Phone (952) 933-3930 <br /> Cell (612) 723-5248 <br /> CONSTRUCTION COMPANY <br /> Page 3 <br /> 8. Paint/stain bath and toilet room <br /> a. Ceiling—prime and paint. <br /> b. Walls—prime and paint—two coats. <br /> c. Crown molding—finish to match trim or prime and 2 coat. <br /> d. Vanities—finish per owner or designers choice. <br /> e. Millwork—doors, windows, and trim—apply 1 coat of poly finish. (See alternates) <br /> 9. HVAC <br /> a. Modify heat supplies. <br /> b. Replace two bath fans with Panasonic or Broan—super quiet units. <br /> 10. Electric <br /> a. Wire for and install a center ceiling light. <br /> b. Wire for and install 2 sconces or 1 wall light at each vanity. Wire separate switches. <br /> c. Rewire 2 GFI outlets. <br /> d. Wire and install 2 recessed shower lights. <br /> e. Wire and install in floor electric floor warming to bath and toilet room areas. <br /> f. Add 2 additional switches. <br /> g. Rewire 2 bath fans. <br /> 11. Plumbing <br /> a. Tub <br /> *Modify waste, vent, and water lines for a new free standing tub. <br /> *Supply and install a new tub,tub filler as well as tub drain and water lines. <br /> b. Shower <br /> *Re-rough-in a new shower drain, shower valve, and showerhead. New shower <br /> to include hand held shower. <br /> *Supply and install a new drain, shower valve, and shower faucet with hand held <br /> option. <br /> c. Toilet <br /> *Supply and install a new toilet at the current location. <br /> *Replace toilet shut off. <br />
The URL can be used to link to this page
Your browser does not support the video tag.