Laserfiche WebLink
paquetteconstruction86@gmail.com 793 Boulder Drive <br /> www.paquetteconstruction.com Orono, MN 55356 <br /> Phone (952) 933-3930 <br /> Cell (612) 723-5248 <br /> CONSTRUCTION COMPANY <br /> Page 4 <br /> d. Vanity sinks and faucets <br /> *Modify waste and water lines for two new vanity sinks. <br /> *Supply and install 2 new sinks and faucets. <br /> e. Fixture allowance$6,800.00. <br /> 12. Misc. <br /> a. Supply and install a semi frameless shower enclosure and door. 3/8" heavy glass. <br /> b. Supply and install 2 mirrors. Mirrors built to match cabinets. Mirror allowance <br /> $500.00 each. Total $1,000.00. <br /> c. Supply and install new loath hardware. Allowance $300.00. <br /> d. Change hardware at doors on bath entrance,toilet and closet. <br /> 13. Special notes <br /> a. All labor and materials are included in above costs except decorative light fixtures <br /> such as center ceiling light or sconces. All recessed lights supplied by contractor. <br /> b. Drawing fees ae included. <br /> c.Allowances noted are included in each section cost. <br /> d. General contractor and all subcontractors are licensed, bonded, and insured. <br /> 14. Profit and overhead <br /> Alternates: <br /> 1. Millwork—prep, prime, and 2 coat enamel all windows, window trim, doors, door trim, and <br /> crown. Bath and toilet room. <br /> (Walk-in closet—base and closet side of door—enamel—add $380.00.) <br /> 2. Toe kick lighting—supply and install toe kick lights to 2 vanities. <br />