Laserfiche WebLink
AA paquetteconstruction86@gmail.com 793 Boulder Drive <br /> www.paquetteconstruction.com Orono, MN 55356 <br /> Phone (952) 933-3930 <br /> Cell (612) 723-5248 <br /> CONSTRUCTION COMPANY <br /> 3. Framing <br /> a. Repair framing due to tub removal. <br /> b. Repair sup flooring to allow for new free standing tub. <br /> c. Re-secure all sub flooring prior to new tile. <br /> d. Misc. backing for new hardware installation. <br /> 4. Drywall <br /> a. Repair all bath and toilet room walls due to tub removal and mechanical updates. <br /> , <br /> b. Ceiling—prep and leave ceiling smooth. <br /> 5. Tile <br /> a. floor—pour new base coat with lath. Tile bath room and toilet room floors. Grout <br /> and seal. Floor tile allowance$8.00 per sq. ft. <br /> b. Shower—prep floor including a new poured curb, rubber pan, pre pour and final pour <br /> of mud. Tile shower floor. Tile walls to same height as existing. Build and the niche. <br /> Tile allowances: <br /> Shower floor-$15.00 per sq. ft. <br /> Shower wall-$8.00 per sq. ft. <br /> Decorative the-$400.00. <br /> c. Bath walls—prep walls at northeast corner behind free standing tub to height of <br /> windows. Tile walls. <br /> Tile allowance: <br /> $8.00 per sq.ft. <br /> d. Base—prep and install the base throughout bath and toilet room. <br /> Tile allowance: <br /> $5.00 per lineal ft. <br /> 6. Vanities and vanity tops <br /> a. Supply and install two new vanities—built-in or free standing. <br /> b. Vanity top allowance-$1,800 each. Total $3,600.00. <br /> 7. Millwork <br /> a. Supply and install crown molding to bath and toilet rooms. <br />