My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-11-2017 Council Packet
Orono
>
City Council
>
2017
>
12-11-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:13:20 AM
Creation date
5/29/2019 10:50:36 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
351
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Lift Station annual <br />Annual Inspection of all Lift Stations <br />Preventive maintenance inspections to <br />$ 4,000 <br />Sewer <br />inspections and <br />determine maintenance needs. <br />Operating <br />maintenance <br />Backup Generators <br />This project will provide a backup <br />This project is part of a systematic effort to <br />$ 75,000 <br />Sewer Fund <br />for LS#5 and LS <br />generator for Lift Station #5 (351 West <br />provide backup power to critical City <br />#15 <br />Lake Street) which services the sanitary <br />infrastructure. <br />sewer system north of Stubbs Bay and for <br />Lift Station #15 (13 75 Vine Place) which <br />services the sanitary sewer system to the <br />west of vine place. <br />Forest Arms Sewer <br />This Sanitary Sewer Rehabilitation project <br />Sewer main was installed in 1970. The <br />$ 92,400 <br />Sewer Fund <br />Rehabilitation w/ <br />will consist of Cured in Place Pipe (CIDP) <br />most cost effective time to replace the pipe <br />Road Project <br />lining approximately 1680 feet of <br />is when the road is under construction. <br />infiltration susceptible sanitary sewer <br />pipes, manhole reconstruction, and lid <br />replacement. <br />West Lafayette <br />This Sanitary Sewer Rehabilitation project <br />Sewer main was installed in 1969. The <br />$ 44,000 <br />Sewer Fund <br />Sewer <br />will consist of Cured in Place Pipe (CIDP) <br />most cost effective time to replace the pipe <br />Rehabilitation with <br />lining approximately 800 feet of <br />is when the road is under construction. <br />Road construction <br />infiltration susceptible sanitary sewer <br />pipes, manhole reconstruction, and lid <br />replacement <br />Old Crystal Bay <br />Replacement of the sewer main that runs <br />Sewer main was installed in 1967-1971. <br />$ 190,000 <br />Sewer Fund <br />Road N Main <br />under Old Crystal bay road from CSAH <br />The most cost effective time to replace the <br />Replacement <br />112 to CSAH 6 in conjunction with the <br />pipe is when the road is under <br />West Lafayette Road reconstruction <br />construction. <br />project. <br />Generator <br />Develop and entire into a preventive <br />to ensure the reliability and longevity of <br />$ 10,000 <br />Sewer Fund <br />Rehabilitation and <br />maintenance rehabilitation contract for the <br />the cities emergency backup generators. <br />Preventive <br />city's generator fleet <br />maintenance <br />
The URL can be used to link to this page
Your browser does not support the video tag.