Laserfiche WebLink
Water <br />Project <br />Detail / Scope <br />Justification <br />Estimated <br />Funding <br />Cost <br />Source <br />North Well house <br />This project will incorporate the data feeds <br />Well house 3 has recently received new <br />$ 61,200 <br />Water Fund <br />SCADA upgrade <br />from the newer equipment at the North <br />chemical storage and feed equipment, and <br />water plant into the existing SCADA <br />Well 4. This site may also receive a new <br />system <br />generator and transfer switch in the <br />future. <br />North Water Tower <br />Pressure wash of north water tower, inside <br />This is part of the 10 year maintenance <br />$ 62,500 <br />Water Fund <br />Maintenance <br />and out; perform repairs to interior and <br />plan for the tower entered into in 2014. <br />exterior coatings and perform preventive <br />maintenance checks and services. <br />Well #3 Inspection <br />This project includes the inspection and <br />To ensure a continued, dependable supply <br />$ 20,000 <br />Water Fund <br />and Maintenance <br />rehabilitation/ replacement of Well #3's <br />of quality water from the City's well <br />pumps, motors, and column piping. <br />periodic maintenance is required. This <br />project includes the inspection and <br />rehabilitation/ replacement of Well #3's <br />motors, and column piping. <br />Old Crystal Bay <br />Replacement of the water main that runs <br />Water main was installed in 1967 and is <br />$ 210,000 <br />Water Fund <br />Road Water Main <br />under Old Crystal bay road from CSAH <br />cast iron pipe. Over the years the city has <br />Replacement <br />112 to CSAH 6 in conjunction wit the <br />had issues with cast iron pipe <br />OCB Road Reconstruction project. <br />deterioration based. The most cost <br />effective time to replace the pipe is when <br />the road is under construction. <br />West Lafayette <br />Replacement of the water main that runs <br />Water main was installed in 1971 and is <br />$ 75,000 <br />Water Fund <br />Main Replacement <br />under the road in conjunction with the <br />cast iron pipe. Over the years the city has <br />West Lafayette Road reconstruction <br />had issues with cast iron pipe <br />project. <br />deterioration based. The most cost <br />effective time to replace the pipe is when <br />the road is under construction. <br />10 <br />