Laserfiche WebLink
Sanitary Sewer <br />Project <br />Detail / Scope <br />Justification <br />Estimated <br />Funding <br />Cost <br />Source <br />Monitoring and <br />This project will see the provision of <br />This is a continuation/ expansion of the <br />$ 26,000 <br />Sewer Fund <br />Alarm Upgrade <br />electronic monitoring of 4 additional Lift <br />project begun in 2016. As of 2017 the city <br />Stations. This project will <br />has 30/46 lift stations being electronically <br />upgrade/replace components of the <br />monitored. The electronic monitoring <br />monitoring system including antennas, <br />system being used has exceeded its useful <br />cabling, and uninterruptable power supply <br />life. The remaining lift stations are <br />(UPS) <br />dependent upon audible and visual alarms <br />to provide notification of mechanical <br />issues. The provision of electronic <br />monitoring for all of the city's lift stations <br />will improve response time to issues, <br />reduce backup incidents and provide real <br />time monitoring and reporting for <br />accountability. <br />2018 Sanitary <br />This Sanitary Sewer Rehabilitation project <br />Reduce Inflow and Infiltration (I&I) into <br />$ 273,180 <br />Sewer Fund <br />Sewer Upgrades <br />will consist of Cured in Place Pipe (CIDP) <br />the Sanitary sewer systems. The lining <br />(CIDP and Manhole <br />lining approximately 4,500 feet of <br />process creates and new durable pipe <br />Sealing) <br />infiltration susceptible sanitary sewer <br />within the older pipe at a much reduced <br />pipes, manhole reconstruction, and lid <br />cost from open curing or directionally <br />replacement. <br />drilling in order to replace the older pipe. <br />Lift Station <br />This project will rehabilitate 2 of the <br />Rehabilitating 2 lift stations per year is part <br />$ 112,000 <br />Sewer Fund <br />Rehabilitation for <br />City's 46 Lift Stations. Rehabilitation <br />of the city's preventative maintenance plan. <br />GS#2 and LS#9 <br />includes the inspection, and replacement <br />Allows City to provide extensive <br />of a lift stations piping, motors, pumps <br />maintenance to each Lift Station once <br />and control as well as repairs wet well. <br />every 23 years. <br />The Lift Stations identified for 2018 are <br />Grinder Station #2 (1082 Ferndale Rd W) <br />and Lift Station #9 (1580 Bohns Point <br />Rd). <br />Sewer inspection, <br />This project includes the cleaning and <br />This project is part of the City preventative <br />$ 47,270 <br />Sewer Fund <br />maintenance and <br />inspection of 1/5 of the City's sewer <br />maintenance program. The results of the <br />flushing of District <br />mains. <br />inspection are used to determine future <br />5 <br />maintenance needs. <br />