My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
call for bids/re-roof-1994
Orono
>
Property Files
>
Street Address
>
T
>
Tonkawa Road
>
0645 Tonkawa Road - 05-117-23-33-0019
>
Misc
>
call for bids/re-roof-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:14:00 PM
Creation date
5/28/2019 1:30:34 PM
Metadata
Fields
Template:
x Address Old
Address
0645 Tonkawa Rd
Document Type
Misc
PIN
0511723330019
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' PROTECTION <br /> ' SP-15 The Contractor shall provide for and be responsible for protection of existing <br /> structure not scheduled to be removed. All existing materials, surfaces and construction to <br /> remain which are not affected by the work shall be repaired, or replaced, to the original <br /> ' constructions. <br /> Provide all protective materials and methods as required to protect the existing building and <br /> ' adjacent surfaces, features and property. The Contractor is responsible for any damage, <br /> including from water or flying debris, resulting from work under this contract. <br /> Precautions shall be taken to protect the building grounds from damage due to necessary <br /> construction traffic. <br /> ' REPAIR OF EXISTING PROPERTY <br /> ' SP-16 The Contractor shall be responsible for patching of existing membrane, not <br /> scheduled for replacement or alteration, which is damaged during any sequence of the <br /> removal, or reroofing work. The Contractor is also responsible for any water damage to <br /> ' existing insulation and building interior finishes, furniture, equipment and work in progress <br /> that may result from damage to the existing roof membrane due to inadequate repair work. <br /> ' TRADE STANDARDS AND WORKMANSHIP <br /> SP-17 Workmanship shall be first class. In case of dispute and in the absence of any <br /> definite criteria or specification for work required under this contract, the association, <br /> institute or similar organization of the trade or material involved shall be guiding authority. <br /> ERECTION OF SIGNS AND-BARRICADES <br /> SP-18 The Contractor shall erect the necessary signs and barricades to insure the safety of <br /> all personnel, and general public. These signs shall be in compliance with OSHA Standards <br /> ' and shall be installed immediately upon commencement of work. <br /> ' CONTRACT DRAWINGS AND SPECIFICATIONS <br /> SP-19 The Contractor shall check all documents furnished him immediately upon their <br /> receipt and shall Promptly inform the Project Manager of any omissions or discrepancies <br /> from the following list: <br /> 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.